Work Methodology
Work Methodology
ORGANIZATION STRUCTURE
For this particular project, our organization shall be divided up into smaller
groups with specific tasks or roles.
Our employees are grouped by skill set and function, allowing them to focus
their collective energies on executing their roles as a department.
WORK METHODOLOGY
OJASSO PRO BUILDERS LTD
COMMUNICATION STRUCTURE
We will combine the “star” structure, and the “all channel” communication
where the project manager receives all the communication from site activities
and feeds back the client, funding agency and the authorities but there will be
blends in the features of the structure such that it allows each participant to
communicate directly with every other participant.
This structure will be highly effective for accomplishing complex tasks as it will
allow all participants the opportunity to contribute to solving the problem with
a central authority.
Major Stakeholders
We expect to interact with the following scheme of major stakeholders in the
project execution.:-
WORK METHODOLOGY
OJASSO PRO BUILDERS LTD
WORK METHODOLOGY
Introduction
The intent of this Construction Work Plan is to present the general sequence of
pre-construction and construction activities which are planned to take place at
THE ROUTINE MAINTENANCE OF NKUSWANI-NKINEJI ROAD(C729)-GRAVEL
ROADS. This plan also summarizes the proposed methodology for performing
various phases of the work. It describes possible equipment and personnel to
be used, general sequencing of the work activities, the use of the site for
staging, stockpiling and other activities, and security.
WORK METHODOLOGY
OJASSO PRO BUILDERS LTD
Construction Activities
According to the TOR, the main construction activities will consist of the
following:
Preliminaries and General administrative items
Site clearance
Culverts and drainage works
Grading and gravelling works
HIV/AIDS awareness and prevention campaigns
Dayworks
Equipment Schedule
The equipment that shall be availed to perform the task shall include:
Backhoe- for all excavations, backfilling and loading
Crane for hoisting/lifting heavy materials
20 ton tippers-for transporting excavated material and dumping to fill
areas
Water bowsers-construction water supply, watering and dust control
Wheel loaders-loading and spreading material
Motor grader for road grading works
Concrete mixers for concrete works
Steel cutting, grinding and Welding machines for fabrication works
Personnel
This project shall be headed by the designated Project Manager meeting the
stipulated criteria as in the contract who will work closely with all stakeholders
and directly lead team to hand over the finished quality product in a timely
manner. The form of organization structure being projectized. All other
WORK METHODOLOGY
OJASSO PRO BUILDERS LTD
employees will be sourced locally from around the project area using the
acceptable criteria.
WORK METHODOLOGY
OJASSO PRO BUILDERS LTD
indicating that the soil materials are clean and meet the Standards
Regulations.
Excavated materials encountered during excavations not meeting the criteria of
the roadworks will be segregated and staged, to the extent possible, for
transportation and offsite disposal. Vibratory rollers will be utilized during
compaction.
WORK METHODOLOGY
OJASSO PRO BUILDERS LTD
You Dig” notification will also be conducted before excavation activities begin
for marking of existing utilities.
Obtaining construction related permits. The actual phasing will be dependent
on obtaining access agreements. Actual phasing limits and timing will be
adjusted based on the ability to obtain property access and restoration
agreements as well as the availability of funding.
Public Right of Way
Work within the public right of way may involve the restriction or detouring of
traffic from the work area during working hours. In order to decrease the
congestion of traffic within these areas, the installation of signs, temporary
barriers, temporary road closures or detours around the work areas.
Restoration
A schedule, coordination and overseeing restoration activities, utilizing
qualified subcontractors (i.e. concrete, asphalt, masonry, carpentry, fencing,
landscaping, etc.) to perform the various restoration items of work shall be
enforced in accordance with the Contract Drawings and Specifications. As
restorations of the properties are completed, measurements will be performed
for documentation.
Demobilization
All equipment will be decontaminated and demobilized from the site. The
borrow pits will be restored, staging and processing area will be secured.
Debris generated will be disposed of and the entire site area cleaned to the
satisfaction of the supervising engineer. Areas that were disturbed during
remediation activities will be restored to the degree practicable. Any temporary
fencing, temporary barriers and sediment control measures in the work areas
will be taken down as required.
WORK METHODOLOGY