0% found this document useful (0 votes)
83 views

SE Unit I

This document provides an overview of software engineering. It defines software engineering as a systematic, disciplined approach to developing software using engineering principles. It discusses the characteristics of software and categories of software. It also discusses process models for software development like waterfall model and agile processes. Finally, it discusses some common myths related to software development held by managers, customers and practitioners.

Uploaded by

vivekparashar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views

SE Unit I

This document provides an overview of software engineering. It defines software engineering as a systematic, disciplined approach to developing software using engineering principles. It discusses the characteristics of software and categories of software. It also discusses process models for software development like waterfall model and agile processes. Finally, it discusses some common myths related to software development held by managers, customers and practitioners.

Uploaded by

vivekparashar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 45

Software Engineering

UNIT I
 UNIT-I:
 Introduction to Software Engineering:
 A Generic view of process: Software engineering, Process Framework, CMM,
Process patterns, process assessment, Personal and Team process, Process
Technology, Product and process.
 Process models: Perspective Models, The waterfall model, Incremental process
models, Evolutionary process models, Specialized Process Models, The Unified
process.
 An Agile View of Process: What is agility, Agile Process, and Agile Process
Models

Introduction to Software Engineering

Software engineering is an engineering discipline that is concerned with all


aspects of software development and production. We can alternatively view it as
a systematic collection of past experience. The experience is arranged in the
form of methodologies and guidelines. Software engineers should adopt a
systematic and organised approach to their work and use appropriate tools and
techniques depending on the problem to be solved, the development constraints
and the resources available.

Definition of SOFTWARE ENGINEERING

SE is defined as systematic, disciplined and quantifiable approach for the


development, operation and maintenance of software by applying engineering
principles.
o Software engineering can be defined as “The establishment and use of
sound engineering principles in order to obtain economically software that
is reliable and woks efficiently on real time machines.”

MCET, SE Study Material Page 1


Software Engineering

Software is defined as computer programs, procedures, rules and possibly associated


documentation and data pertaining to the operation of a computer based systems.
“Computer Software” is synonymous with “software product”.

Another definition of Software is

 Instructions
- Programs that when executed provide desired function
 Data structures
-Enable the programs to adequately manipulate information
 Documents
-Describe the operation and use of the programs

Characteristics of software

 Software is developed or engineered;


 it is not manufactured in the classical sense.
 Software does not wear out. However it deteriorates due to change.
 Software is custom built rather than assembling existing components.

Categories of Software

 Seven Broad Categories of software are challenges for software engineers


 System software
 Application software
 Engineering and scientific software
 Embedded software
 Product-line software
 Web-applications
 Artificial intelligence software
Legacy software are older programs that are developed decades ago. The quality of
legacy software is poor because it has inextensible design, convoluted code, poor and
nonexistent documentation, test cases and results that are not achieved.

MCET, SE Study Material Page 2


Software Engineering

As time passes legacy systems evolve due to following reasons:


 The software must be adapted to meet the needs of new computing environment
or technology.
 The software must be enhanced to implement new business requirements.
 The software must be extended to make it interoperable with more modern
systems or database
 The software must be rearchitected to make it viable within a network
environment.
Software Myths
Software Myths- beliefs about software and the process used to build it - can be traced
to the earliest days of computing. Myths have a number of attributes that have made
them insidious. For instance, myths appear to be reasonable statements of fact, they
have an intuitive feel, and they are often promulgated by experienced practitioners who
“know the score”.

Management Myths
Managers with software responsibility, like managers in most disciplines, are often
under pressure to maintain budgets, keep schedules from slipping, and improve quality.
A software manager often grasps at belief in a software myth, If the Belief will lessen the
pressure.

Myth : We already have a book that’s full of standards and procedures for building
software. Won’t that provide my people with everything they need to know?
Reality : The book of standards may very well exist, but is it used?
- Are software practitioners aware of its existence?
- Does it reflect modern software engineering practice?
- Is it complete? Is it adaptable?
- Is it streamlined to improve time to delivery while still maintaining a focus on
Quality?
In many cases, the answer to these entire question is no.

Myth : If we get behind schedule, we can add more programmers and catch up
(sometimes called the Mongolian horde concept)
Reality : Software development is not a mechanistic process like manufacturing. In the
words of Brooks “Adding people to a late software project makes it later.” At first,
this statement may seem counterintuitive. However, as new people are added, people
who were working must spend time educating the newcomers, thereby reducing the
amount of time spent on productive development effort
Myth : If we decide to outsource the software project to a third party, I can just relax and
let that firm build it.
Reality : If an organization does not understand how to manage and control software
project internally, it will invariably struggle when it out sources software project.

MCET, SE Study Material Page 3


Software Engineering

Customer Myths
A customer who requests computer software may be a person at the next desk, a
technical group down the hall, the marketing /sales department, or an outside company
that has requested software under contract. In many cases, the customer believes
myths about software because software managers and practitioners do little to correct
misinformation. Myths led to false expectations and ultimately, dissatisfaction with the
developers.

Myth : A general statement of objectives is sufficient to begin writing programs we can


fill in details later.
Reality : Although a comprehensive and stable statement of requirements is not always
possible, an ambiguous statement of objectives is a recipe for disaster.
Unambiguous requirements are developed only through effective and continuous
communication between customer and developer.

Myth : Project requirements continually change, but change can be easily


accommodated because software is flexible.
Reality : It’s true that software requirement change, but the impact of change varies
with the time at which it is introduced. When requirement changes are requested
early, cost impact is relatively small. However, as time passes, cost impact grows
rapidly – resources have been committed, a design framework has been
established, and change can cause upheaval that requires additional resources
and major design modification.

Practitioner Myths

Myth(1) à Once we write the program and get it to work, our


job is done“
Reality à 60% to 80% of all effort expended on software
occurs after it is delivered
Myth(2) à Until I get the program running, I have no way of
assessing its quality
Reality à Formal technical reviews of requirements analysis
documents, design documents, and source code
(more effective than actual testing)
Myth(3) à The only deliverable work product for a successful
project is the working program“
Reality à Software, documentation, test drivers, test results
Myth(4) à Software engineering will make us create voluminous
and unnecessary documentation and will invariably
slow us down
Reality àCreates quality, not documents; quality reduces rework and provides
software on time and within the budget

MCET, SE Study Material Page 4


Software Engineering

A Generic view of process

Process: A set of activities, methods, practices, and transformations that people use to
develop and maintain software and the associated products (e.g., project plans, design
documents, code, test cases, and user manuals)

Software Engineering - A Layered Technology

Software engineering encompasses a process, the management of activities, technical


methods, and use of tools to develop software products

tools

methods

process model

a “quality”
focus

 The foundation for software engineering is the process layer. It is the glue that
holds the technology layers together and enables rational and timely
development of computer software.
 Process defines a framework that must be established for effective delivery of
software engineering technology.
 The software process forms the basis for management control of software
projects and establishes the context in which technical methods are applied,
work products (models, documents, data, reports, etc.) are produced, milestones
are established, quality is ensured, and change is properly managed.
 Software engineering methods provide the technical “how to’s” for building
software. Methods encompass a broad array of tasks that include
communication, req. analysis, design, coding, testing and support.
 Software engineering tools provide automated or semi-automated support for the
process and the methods.

 When tools are integrated so that info. Created by one tool can be used by
another, a system for the support of software development called computer-aided
software engineering is established

A PROCESS FRAMEWORK

 Establishes the foundation for a complete software process


 Identifies a number of framework activities applicable to all software projects
 Also include a set of umbrella activities that are applicable across the entire
software process.

MCET, SE Study Material Page 5


Software Engineering

 Used as a basis for the description of process models

 Generic process activities


- Communication
- Planning
- Modeling
- Construction
- Deployment
-
Common process framework

Framework activities

Task sets

TTTasks

Milestones,delierables

SQA points

Umbrella activities

Communication activity
Planning activity
Modeling activity
o analysis action
o requirements gathering work task
o elaboration work task
o negotiation work task
o specification work task
o validation work task
o design action
o data design work task
o architectural design work task
o interface design work task
o component-level design work task
o Construction activity

MCET, SE Study Material Page 6


Software Engineering

o Deployment activity

 Umbrella activities (examples)

1. Software Project Tracking and Control – Assess progress against the project plan
and maintain schedule.
2. Risk Management – Assesses risk that effect project outcome (or) Quality of
product.
3. Software Quality Assurance – Activities to ensure software quality.
4. Formal Technical Reviews - Assess work products to uncover and remove errors
before next action.
5. Software Configuration Management – Manages effects of changes throughout the
software process.
6. Measurement – Defines and collects process, project, product measures to meet
customer requirements.
7. Reusability Management – Defines criteria for work product reuse and establishes
mechanisms to achieve reusable components.
8. Work Product Preparation and Production – Focuses on activities required to
Create work product such as models, documents, logs, forms and list

CMM Levels.

MCET, SE Study Material Page 7


Software Engineering

Level 1: Initial.

 A software development organization at this level is characterized by ad hoc


activities.
 Very few or no processes are defined and followed.
 Since software production processes are not defined, different engineers follow
their own process and as a result development efforts become chaotic.
 The success of projects depends on individual efforts and heroics.
 Since formal project management practices are not followed, under time
pressure short cuts are tried out leading to low quality.

Level 2: Repeatable

 At this level, the basic project management practices such as tracking cost and
schedule are established.
 Size and cost estimation techniques like function point analysis, COCOMO, etc.
are used.
 The necessary process discipline is in place to repeat earlier success on projects
with similar applications. Opportunity to repeat a process exists only when a
company produces a family of products

Level 3: Defined

 At this level the processes for both management and development activities are
defined and documented.
 There is a common organization-wide understanding of activities, roles, and
responsibilities.
 The processes though defined, the process and product qualities are not
measured.
 ISO 9000 aims at achieving this level.

Level 4: Managed

 At this level, the focus is on software metrics.


 Two types of metrics are collected.
o Product metrics measure the characteristics of the product being
developed, such as its size, reliability, time complexity, understandability,
etc.
o Process metrics reflect the effectiveness of the process being used, such
as average defect correction time, productivity, average number of defects
found per hour inspection, average number of failures detected during
testing per LOC, etc.

MCET, SE Study Material Page 8


Software Engineering

 Quantitative quality goals are set for the products. The software process and
product quality are measured and quantitative quality requirements for the
product are met.
 Various tools like Pareto charts, fishbone diagrams, etc. are used to measure the
product and process quality.
 Thus, the results of process measurements are used to evaluate project
performance rather than improve the process.

Level 5: Optimizing

 Process and product measurement data are analyzed for continuous process
improvement.
 The process may be fine tuned to make the review more effective.
 The lessons learned from specific projects are incorporated in to the process.
 Continuous process improvement is achieved both by carefully analyzing the
quantitative feedback from the process measurements and also from application
of innovative ideas and technologies.
 These best practices are transferred throughout the organization.

Key process areas (KPA):

Each maturity level is characterized by several Key Process Areas (KPAs) except for SEI CMM
level 1 that includes the areas an organization should focus to improve its software process to
the next level.

Process Patterns

 Process patterns define a set of activities, actions, work tasks, work products
and/or related behaviors
 A template is used to define a pattern
 Typical examples:
o Customer communication (a process activity)
o Analysis (an action)

MCET, SE Study Material Page 9


Software Engineering

o Requirements gathering (a process task)


o Reviewing a work product (a process task)
o Design model (a work product)
Process Assessment

 The process should be assessed to ensure that it meets a set of basic process
criteria that have been shown to be essential for a successful software
engineering.

The generic process framework – Detailed Activities of each phase

 Communication
 Planning
 Modeling
 Construction
 Deployment

Communication Practices
Principles
 Listen
 Prepare before you communicate
 Facilitate the communication
 Face-to-face is best
 Take notes and document decisions
 Collaborate with the customer
 Stay focused
 Draw pictures when things are unclear
 Move on …
 Negotiation works best when both parties win.
 Initiation
o The parties should be physically close to one another
o Make sure communication is interactive

MCET, SE Study Material Page 10


Software Engineering

o Create solid team “ecosystems”


o Use the right team structure
 An abbreviated task set
o Identify who it is you need to speak with
o Define the best mechanism for communication
o Establish overall goals and objectives and define the scope
o Get more detailed
 Have stakeholders define scenarios for usage
 Extract major functions/features
o Review the results with all stakeholders

Planning Practices
Principles
 Understand the project scope
 Involve the customer (and other stakeholders)
 Recognize that planning is iterative
 Estimate based on what you know
 Consider risk
 Be realistic
 Adjust granularity as you plan
 Define how quality will be achieved
 Define how you’ll accommodate changes
 Track what you’ve planned
 Initiation
o Ask Boehm’s questions
 Why is the system begin developed?
 What will be done?
 When will it be accomplished?
 Who is responsible?
 Where are they located (organizationally)?
 How will the job be done technically and managerially?
 How much of each resource is needed?

MCET, SE Study Material Page 11


Software Engineering

 An abbreviated task set


o Re-assess project scope
o Assess risks
o Evaluate functions/features
o Consider infrastructure functions/features
o Create a coarse granularity plan
 Number of software increments
 Overall schedule
 Delivery dates for increments
o Create fine granularity plan for first increment
o Track progress
Modeling Practices
 We create models to gain a better understanding of the actual entity to be built
 Analysis models represent the customer requirements by depicting the software
in three different domains: the information domain, the functional domain, and the
behavioral domain.
 Design models represent characteristics of the software that help practitioners to
construct it effectively: the architecture, the user interface, and component-level
detail.
Analysis Modeling Practices
 Analysis modeling principles
o Represent the information domain
o Represent software functions
o Represent software behavior
o Partition these representations
o Move from essence toward implementation
 Elements of the analysis model
o Data model
o Flow model
o Class model
o Behavior model

MCET, SE Study Material Page 12


Software Engineering

Design Modeling Practices


 Principles
o Design must be traceable to the analysis model
o Always consider architecture
o Focus on the design of data
o Interfaces (both user and internal) must be designed
o Components should exhibit functional independence
o Components should be loosely coupled
o Design representation should be easily understood
o The design model should be developed iteratively
 Elements of the design model
o Data design
o Architectural design
o Component design
o Interface design
Construction Practices
 Preparation principles:
Understand of the problem you’re trying to solve (see communication and
modeling)
 Understand basic design principles and concepts.
 Pick a programming language that meets the needs of the software to be built
and the environment in which it will operate.
 Select a programming environment that provides tools that will make your work
easier.
 Create a set of unit tests that will be applied once the component you code is
completed.
 Coding principles: After started writing code
 Constrain your algorithms by following structured programming practice.
 Select data structures that will meet the needs of the design.
 Understand the software architecture and create interfaces that are consistent
with it.
 Keep conditional logic as simple as possible.
 Create nested loops in a way that makes them easily testable.
 Select meaningful variable names and follow other local coding standards.
 Write code that is self-documenting.
 Create a visual layout (e.g., indentation and blank lines) that aids understanding.
 Validation Principles: After completing first coding pass:
o Conduct a code walkthrough when appropriate.
o Perform unit tests and correct errors you’ve uncovered.
o Refactor the code
 Testing Principles

MCET, SE Study Material Page 13


Software Engineering

o All tests should be traceable to requirements


o Tests should be planned
o The Pareto Principle applies to testing
o Testing begins “in the small” and moves toward “in the large”
o Exhaustive testing is not possible

Deployment Practices

Principles

 Manage customer expectations for each increment


 A complete delivery package should be assembled and tested
 A support regime should be established
 Instructional materials must be provided to end-users
 Buggy software should be fixed first, delivered later

Software Process

identifies is examined by identifies capabilities


modifications to and risk of

Software Process
Assessment

Capability
Software Process leads to leads to
Determination
Improvement
motivates

Software Process

Software Process

PSP TSP

MCET, SE Study Material Page 14


Software Engineering

Personal Software Process (PSP)

 Recommends five framework activities:

o Planning
o High-level design
o High-level design review
o Development
o Postmortem

 stresses the need for each software engineer to identify errors early and as
important, to understand the types of errors

Team Software Process (TSP)

 Each project is “launched” using a “script” that defines the tasks to be


accomplished
 Teams are self-directed
 Measurement is encouraged
 Measures are analyzed with the intent of improving the team process

MCET, SE Study Material Page 15


Software Engineering

PROCESS MODELS

1. PRESCRIPTIVE MODEL
2. WATERFALL MODEL

CLASSICAL WATERFALL ITERATIVE WATERFALL


MODEL MODE

3. INCREMENTAL PROCESS MODELS

INCREMENTAL MODEL RAD (RAPID APPLICATION DEVELOPMENT MODEL)

4. EVOLUTIONARY PROCESS MODEL

PROTOTYPING MODEL SPIRAL MODEL CONCURRENT DEVELOPMENT MODEL

5. SPECIALISED PROCESS MODELS

CONCEPTUAL BASE FORMAL METHOD ASPECT ORIENTED

MCET, SE Study Material Page 16


Software Engineering

DEVELOPMENT S/W DEVELOPMENT

6. THE UNIFIED PROCESS

Process Models

Life cycle model

A software life cycle model also called process model is a descriptive and diagrammatic
representation of the software life cycle. A life cycle model represents all the activities
required to make a software product transit through its life cycle phases. It also captures
the order in which these activities are to be undertaken. In other words, a life cycle
model maps the different activities performed on a software product from its inception to
retirement.

Different life cycle models may map the basic development activities to phases in
different ways. Thus, no matter which life cycle model is followed, the basic activities
are included in all life cycle models though the activities may be carried out in different
orders in different life cycle models. During any life cycle phase, more than one activity
may also be carried out.

1. Classical Waterfall Model


2. Iterative Waterfall Model
3. Prototyping Model
4. Incremental Model
5. RAD Model
6. Spiral Model

1. Classical Waterfall Model

MCET, SE Study Material Page 17


Software Engineering

• Oldest software lifecycle model and best understood by upper management


• Used when requirements are well understood and risk is low
• Work flow is in a linear (i.e., sequential) fashion
• Used often with well-defined adaptations or enhancements to current software
• Begins with customer specification of Requirements and progresses through
planning, modeling, construction and deployment

The framework activities of the Waterfall model include:


1. Communication: It involves heavy communication and collaboration with
customer and other stakeholders. It encompasses requirements gathering and
related activities.

2. Planning: It plans for Software Engineering work that follows. It describes


technical tasks to be conducted, resources that will be required, likely risks, work
products to be produced and a work schedule.

3. Modeling: This activity focuses on creation of models that allow stakeholders


(customer, developer) to better understand software requirements and design that
will achieve requirements.

4. Construction: It combines code generation and testing to uncover errors in the


code. (Manual, automated actions).

5. Deployment: The software (completed/partial increment) is delivered to the


customer for evaluation and feedback of it.

Advantages:
 It is very simple
 It divides the large task of building a software system into a seri es of clearly
divided phases.
 Each phase is well documented
Problems
 Doesn't support iteration, so changes can cause confusion
 Difficult for customers to state all requirements explicitly and up front
 Requires customer patience because a working version of the program doesn't
occur until the final phase
 Problems can be somewhat alleviated in the model through the addition of
feedback loops
 Problems:

MCET, SE Study Material Page 18


Software Engineering

 Real projects rarely follow the sequential flow.


 It’s often difficult for customer to state all requirements explicitly.
 Working version of program(s) will not be available until late in project time-span.
So, customer must have patience.

A variation in the representation of the waterfall model is called the V-model. The V-
model depicts the relationship of quality assurance actions to the actions associated
with communication, modeling, and early construction activities. As software team
moves down the left side of the V, basic problem requirements are refined into
progressively more detailed and technical representations of the problem and its
solution. Once code has been generated, the team moves up the right side of the V,
essentially performing a series of tests (quality assurance actions) that validate each of
the models created as the team moved down the left side. In reality, there is no
fundamental difference between the classic life cycle and the V-model. The V-model
provides a way of visualizing how verification and validation actions are applied to
earlier engineering work.

MCET, SE Study Material Page 19


Software Engineering

2. Iterative Waterfall Model

INCREMENTAL PROCESS MODELS

MCET, SE Study Material Page 20


Software Engineering

“It divides the software development process into certain number of increments with
each increment comprising 5 phases of waterfall model”. Each linear sequence
produces “deliverable increments” of software.

First increment is often a core product i.e., basic requirements are addressed,
supplementary features are not delivered. The core product is used and evaluated by
the customer, based on that plans for next increment development. This process is
repeated till complete product is produced.

1. Incremental Model
Increment #3
The framework activities of the Incremental Process model include:

1. Communication: It involves heavy communication and collaboration with customer


and other stakeholders. It encompasses requirements gathering and related activities.

2. Planning: It plans for Software Engineering work that follows. It describes technical
tasks to be conducted, resources that will be required, likely risks, work products to be
produced and a work schedule.

3. Modeling: This activity focuses on creation of models that allow stakeholders


(customer, developer) to better under software requirements and design that will
achieve requirements.

4. Construction: It combines code generation and testing to uncover errors in the code.

5. Development: The software (completed/partial increment) is delivered to the


customer for evaluation and feedback of it

Advantages:

 Technical risks reduced, with each increment.


 When team size is small, it is the correct choice.
 Customer can expect a core product in short time-span.

2. Rapid Application Model (RAD)

• RAD is a high speed adaptation of linear sequential model. It is characterized by


a very short development life cycle, in which the objective is to accelerate the
development.
• The RAD model follows a component based approach.
• In this approach individual components developed by different people are
assembled to develop a large software system.

MCET, SE Study Material Page 21


Software Engineering

The RAD model consist of the following phases

• Business Modeling:
In this phase, define the flow of information within the organization, so that it
covers all the functions. This helps in clearly understand the nature, type
source and process of information.
• Data Modeling:
In this phase, convert the component of the information flow into a set of data
objects. Each object is referred as an Entity.
• Process Modeling:
In this phase, the data objects defined in the previous phase are used to
depict the flow of information . In addition adding , deleting, modifying and
retrieving the data objects are included in process modeling.
• Application Designing:
In this phase, the generation of the application and coding take place. Using
fourth generation programming languages or 4 GL tools is the preferred choice
for the software developers.
• Testing:
In this phase, test the new program components.

The RAD has following advantages


• Due to emphasis on rapid development , it results in the delivery of fully
functional project in short time period.

MCET, SE Study Material Page 22


Software Engineering

• It encourages the development of program component reusable.


The RAD has following disadvantages

• It requires dedication and commitment on the part of the developers as well as


the client to meet the deadline. If either party is indifferent in needs of other, the
project will run into serious problem.
• For large but scalable projects It is not suitable as RAD requires sufficient human
resources to create the right number of RAD teams.
• RAD requires developers and customers who are committed to rapid fire
activities
• Its application area is restricted to system that are modular and reusable in
nature.
• It is not suitable for the applications that have a high degree of technical risk.
• For large but scalable projects, RAD requires sufficient human resources to
create the right number of RAD teams.
• RAD requires developers and customers who are committed to rapid fire
activities.
• Not all types of applications are appropriate for RAD.
• RAD is not appropriate when technical risks are high.

Evolutionary Process Models:

1. Prototype Models:

A prototype is a toy implementation of the system. A prototype usually exhibits limited


functional capabilities, low reliability, and inefficient performance compared to the actual
software. A prototype is usually built using several shortcuts. The shortcuts might
involve using inefficient, inaccurate, or dummy functions. The shortcut implementation
of a function, for example, may produce the desired results by using a table look-up
instead of performing the actual computations.

Need for a prototype in software development

There are several uses of a prototype. An important purpose is to illustrate the input
data formats, messages, reports, and the interactive dialogues to the customer. This is
a valuable mechanism for gaining better understanding of the customer’s needs:

• how the screens might look like


• how the user interface would behave
• how the system would produce outputs

Another reason for developing a prototype is that it is impossible to get the perfect
product in the first attempt. Many researchers and engineers advocate that if you want
to develop a good product you must plan to throw away the first version. The
experience gained in developing the prototype can be used to develop the final product.

MCET, SE Study Material Page 23


Software Engineering

• Follows an evolutionary and iterative approach


• Used when requirements are not well understood
• Serves as a mechanism for identifying software requirements
• Focuses on those aspects of the software that are visible to the customer/user
• In this model, product development starts with an initial requirements gathering
phase.
• A quick design is carried out and the prototype is built.
• The developed prototype is submitted to the customer for his evaluation.
• Based on the customer feedback, the requirements are refined and the prototype
is suitably modified.
• This cycle of obtaining customer feedback and modifying the prototype continues
till the customer approves the prototype.
• The actual system is developed using the iterative waterfall approach. However,
in the prototyping model of development, the requirements analysis and
specification phase becomes redundant as the working prototype approved by
the customer becomes redundant as the working prototype approved by the
customer becomes an animated requirements specification.

Disadvantages
 The customer sees a "working version" of the software, wants to stop all
development and then buy the prototype after a "few fixes" are made
 Developers often make implementation compromises to get the software running
quickly (e.g., language choice, user interface, operating system choice, inefficient
algorithms)
 Lesson learned
MCET, SE Study Material Page 24
Software Engineering

o Define the rules up front on the final disposition of the prototype before it is
built
o In most circumstances, plan to discard the prototype and engineer the
actual production software with a goal toward quality
o

2. Spiral Model

• Invented by Dr. Barry Boehm in 1988


• Follows an evolutionary approach
• Used when requirements are not well understood and risks are high
• Inner spirals focus on identifying software requirements and project risks; may
also incorporate prototyping
• Outer spirals take on a classical waterfall approach after requirements have been
defined, but permit iterative growth of the software
• Operates as a risk-driven model…a go/no-go decision occurs after each
complete spiral in order to react to risk determinations
• Requires considerable expertise in risk assessment
• Serves as a realistic model for large-scale software development

First quadrant (Objective Setting)


• During the first quadrant, it is needed to identify the objectives of the phase.
• Examine the risks associated with these objectives.
Second Quadrant (Risk Assessment and Reduction)
• A detailed analysis is carried out for each identified project risk.
• Steps are taken to reduce the risks. For example, if there is a risk that the
requirements are inappropriate, a prototype system may be developed.

MCET, SE Study Material Page 25


Software Engineering

Third Quadrant (Development and Validation)


• Develop and validate the next level of the product after resolving the
identified risks.
Fourth Quadrant (Review and Planning)
• Review the results achieved so far with the customer and plan the next
iteration around the spiral.
• Progressively more complete version of the software gets built with each
iteration around the spiral.

Spiral Model Advantages


• Focuses attention on reuse options.
• It is a realistic approach to the development of large scale systems and software.
• Focuses attention on early error elimination.
• Puts quality objectives up front.
• Integrates development and maintenance.
• Provides a framework for hardware/software development.

Disadvantages:
• Contractual development often specifies process model
• and deliverables in advance.
• Requires risk assessment expertise.

MCET, SE Study Material Page 26


Software Engineering

Circumstances to use spiral model

The spiral model is called a meta model since it encompasses all other life cycle
models. Risk handling is inherently built into this model. The spiral model is suitable for
development of technically challenging software products that are prone to several
kinds of risks. However, this model is much more complex than the other models – this
is probably a factor deterring its use in ordinary projects.

3. Concurrent Development Model:

It is also called as “Concurrent Engineering”. This model is represented schematically


as a series of framework activities, Software Engineering actions and tasks, and their
associated states concurrently. It strives to make all software development activities to
be concurrently implemented.

Ex: “Modeling” activity for spiral model is accomplished by invoking prototyping and/or
analysis Modeling and specification and design.

All activities (communication/modeling/construction etc) exist concurrently but reside in


different states. State is an externally observable mode of behavior). For example, early
in a project, the communication activity has completed its first iteration and exists in the

MCET, SE Study Material Page 27


Software Engineering

awaiting changes state. Modeling activity which was in none state will now move to
under development state.

 This model defines a series of events which will trigger transition from state to
state for each of Software Engineering activities, actions/tasks.

Advantages:

 Applicable to all types of software development, provides accurate picture of


current state of a project.
 The software engineering activities, tasks and actions are defined as a network
of activities, rather than sequence of events.

Evolutionary Models Drawbacks:

 Prototyping poses a problem to project planning because of uncertain number of


cycles required to construct product.
 Do not establish maximum speed of evolution.
 May not give flexibility and extensibility for the software process.
Comparison of different life-cycle models

The classical waterfall model can be considered as the basic model and all other life
cycle models as embellishments of this model. However, the classical waterfall model
can not be used in practical development projects, since this model supports no
mechanism to handle the errors committed during any of the phases.

This problem is overcome in the iterative waterfall model. The iterative waterfall
model is probably the most widely used software development model evolved so far.
This model is simple to understand and use. However, this model is suitable only for
well-understood problems; it is not suitable for very large projects and for projects that
are subject to many risks.

The prototyping model is suitable for projects for which either the user requirements
or the underlying technical aspects are not well understood. This model is especially
popular for development of the user-interface part of the projects.

The Incremental approach is suitable for large problems which can be decomposed
into a set of modules for incremental development and delivery. This model is also
widely used for object-oriented development projects. Of course, this model can only be
used if the incremental delivery of the system is acceptable to the customer.

The spiral model is called a meta model since it encompasses all other life cycle
models. Risk handling is inherently built into this model. The spiral model is suitable for
development of technically challenging software products that are prone to several

MCET, SE Study Material Page 28


Software Engineering

kinds of risks. However, this model is much more complex than the other models – this
is probably a factor deterring its use in ordinary projects.

The different software life cycle models can be compared from the viewpoint of the
customer. Initially, customer confidence in the development team is usually high
irrespective of the development model followed. During the lengthy development
process, customer confidence normally drops off, as no working product is immediately
visible.

Specialized Process Models

1. Component-based Development Model

 The component-based development model incorporates many of the


characteristics of the spiral model.
 It is evolutionary in nature
 The component-based development model constructs applications from
prepackaged software components.
 Modeling and construction activities begin with the identification of candidate
components. These components can be designed as either conventional
software modules or object-oriented classes or packages16 of classes

• Consists of the following process steps


– Available component-based products are researched and evaluated for
the application domain in question
– Component integration issues are considered
– A software architecture is designed to accommodate the components
– Components are integrated into the architecture
– Comprehensive testing is conducted to ensure proper functionality
• Relies on a robust component library
• Capitalizes on software reuse, which leads to documented savings in project cost
and time

2. Formal Methods Model

• Encompasses a set of activities that leads to formal mathematical specification of


computer software
• Enables a software engineer to specify, develop, and verify a computer-based
system by applying a rigorous, mathematical notation
• Ambiguity, incompleteness, and inconsistency can be discovered and corrected
more easily through mathematical analysis
• Offers the promise of defect-free software
• Used often when building safety-critical systems

MCET, SE Study Material Page 29


Software Engineering

Challenges of Formal Methods

• Development of formal methods is currently quite time-consuming and expensive


• Because few software developers have the necessary background to apply
formal methods, extensive training is required
• It is difficult to use the models as a communication mechanism for technically
unsophisticated customers

3. Aspect-Oriented Software Development (AOSD):

 As modern computer based systems become more sophisticated and complex,


some concerns (security, fault tolerance, memory management etc) span the
entire architecture. When concern cut across multiple system functions, features
and information, they are referred as crosscutting concerns. Aspectual
Requirements define those crosscutting concerns that have impact across the
software architecture.
 AOSD, often referred to as Aspect-Oriented Programming (AOP), is a relatively
new software engineering paradigm which provides a process for defining,
specifying, designing and constructing aspects (crosscutting concerns).
 Presently there is no distinct Aspect-Oriented Process. If such an approach is
developed, then it must integrate the characteristics of both spiral and concurrent
model, because of their evolutionary and parallel natures respectively.

The Unified Process

• Birthed during the late 1980's and early 1990s when object-oriented languages
were gaining wide-spread use
• Many object-oriented analysis and design methods were proposed; three top
authors were Grady Booch, Ivar Jacobson, and James Rumbaugh
• They eventually worked together on a unified method, called the Unified
Modeling Language (UML)

MCET, SE Study Material Page 30


Software Engineering

– UML is a robust notation for the modeling and development of object-


oriented systems
– UML became an industry standard in 1997
– However, UML does not provide the process framework, only the
necessary technology for object-oriented development
• Booch, Jacobson, and Rumbaugh later developed the unified process, which is a
framework for object-oriented software engineering using UML
– Draws on the best features and characteristics of conventional software
process models
– Emphasizes the important role of software architecture
– Consists of a process flow that is iterative and incremental, thereby
providing an evolutionary feel
• Consists of five phases: inception, elaboration, construction, transition, and
production

Inception Phase

• Encompasses both customer communication and planning activities of the


generic process
• Business requirements for the software are identified
• A rough architecture for the system is proposed
• A plan is created for an incremental, iterative development
• Fundamental business requirements are described through preliminary use
cases
– A use case describes a sequence of actions that are performed by a user

Work Products:
1) Vision Documents 5) Initial Risk Assessment
2) Initial use-case model 6) Project Plan [Phases and Interaction]
3) Initial Project Glossary 7) Business Model (if necessary)
4) Initial Business case 8) One or more Prototypes

Elaboration Phase

• Encompasses both the planning and modelling activities of the generic process
• Refines and expands the preliminary use cases
• Expands the architectural representation to include five views
– Use-case model
– Analysis model
– Design model
– Implementation model
– Deployment model
• Often results in an executable architectural baseline that represents a first cut
executable system

MCET, SE Study Material Page 31


Software Engineering

• The baseline demonstrates the viability of the architecture but does not provide
all features and functions required to use the system
Work Products:
1) Use case Model
2) Supplementary Requirements
3) Analysis Model
4) Software Architecture Prototype
5) Executable Architecture Description
6) Preliminary Design Model
7) Revised Risk List
8) Project plan, includes
a) Iteration Plan
b) Adapted workflow
c) Milestones
d) Technical work products
9) Preliminary User Manual

Construction Phase

• Encompasses the construction activity of the generic process


• Uses the architectural model from the elaboration phase as input
• Develops or acquires the software components that make each use-case
operational
• Analysis and design models from the previous phase are completed to reflect the
final version of the increment
• Use cases are used to derive a set of acceptance tests that are executed prior to
the next phase

Work Products:
1) Design Model.
2) Software Components
3) Integrated Software Increment
4) Test Plan and Procedure.
5) Test Cases
6) Support Document
a. User Manuals
b. Installation Manuals
c. Description of Current Increment

Transition Phase
• Encompasses the last part of the construction activity and the first part of the
deployment activity of the generic process
• Software is given to end users for beta testing and user feedback reports on
defects and necessary changes
• The software teams create necessary support documentation (user manuals,
trouble-shooting guides, installation procedures)

MCET, SE Study Material Page 32


Software Engineering

• At the conclusion of this phase, the software increment becomes a usable


software release

Work Products:
1) Delivered software increment
2) General User Feedback
3) Beta Test Report

Production Phase

• Encompasses the last part of the deployment activity of the generic process
• On-going use of the software is monitored
• Support for the operating environment (infrastructure) is provided
• Defect reports and requests for changes are submitted and evaluated

Agile Processing

MCET, SE Study Material Page 33


Software Engineering

What is Agility

Agility

• Effective response to change


• Effective communication among all stakeholders
• Drawing the customer onto the team; eliminate the “us and them” attitude
• Organizing a team so that it is in control of the work performed
• Rapid, incremental delivery of software

Q: What is Agility?
Ans: Agility is dynamic, content specific, aggressively change and growth oriented.
Agile software is highly valued software. Agile team is a nimble team able to respond
to changes appropriately.

The Agile Alliance defines 12 principles to achieve agility:

1. Our highest priority is to satisfy customer through early and continuous delivery of
valuable software.
2. Welcome changing requirements, even later in development. Agile processes
harness change for customer’s competitive advantage.
3. Deliver working software frequently, from couple of weeks to months.
4. Business people and developers must daily work together throughout the project.
5. Build projects around motivated individuals.(Give them support environment and
trust to get the job done).
6. Most efficient and effective method of conveying information in a development
team is face-to face conversation.
7. Working software is primary measure of progress.
8. Agile processes promote sustainable development. (Users, sponsors, developers
should maintain a constant pace).
9. Continuous attention to technical excellence and good design enhances agility.

MCET, SE Study Material Page 34


Software Engineering

10. Simplicity is essential. (Art of maximum amount of work not done).


11. Self-organizing teams are required for best architectures, requirements and
designs.
12. At regular intervals, team will tune and adjust its behavior to become more
effective.

Q: What is an Agile Process?

Ans: Any Agile software process has 3 assumptions about software projects:
i. It is difficult to predict in advance which software requirements, customer priorities
will change and which will persist.
ii. For many types of software, design and construction are interleaved (performed
together). It is difficult to predict how much design is necessary before construction
is used.
iii. Analysis, design, construction and testing are not as predictable as we might like.

Q: How do we create a process that can manage unpredictability?

Ans: Agile process must be adaptable, to have process adaptability. An agile software
process must adapt incrementally. Customer feedback will make the process effective.
Software increments must be delivered in short time periods, so that adaption keeps
pace with change (unpredictability).

Human Factors: Agile development focuses on the talents and skills of individuals,
modeling the process to specific people and teams.

Traits that must exist among people of Agile Team:

1. Competence: It encompasses innate talent, specific software knowledge of the


process which the team applies. Skill and knowledge of process should be taught to all
agile team members.
2. Common Focus: Although, Agile team members perform different tasks and bring
different skills to be project, all should be focused on one goal-to deliver a working
software increment to the customer within the time promised.
3. Collaboration: Team members must collaborate with one another, with customer
and with business managers, as Software Engineering is
I. Assessing, analysing, using information that is communicated to software
team.
II. Creating information that will help customer.
III. Building information (DBs) that provides business value for customer.
IV. Decision Making Ability: Agile team is given autonomy decision making
authority for both technical and project issues.
5. Fuzzy Problem-Solving Ability: Agile team will continually have to deal with
ambiguity and changes. Lesson learned any problem solving activity benefits the team
later in the project.

MCET, SE Study Material Page 35


Software Engineering

6. Mutual Trust and Respect: Agile team should be a “Jelled” team. Jelled team
exhibits the trust and respect requirement for the project.
7. Self-Organisation: It implies 3 things:
a) Agile team organises itself for the work to be done.
b) Agile team organises the process to best accommodate its environment.
c) Agile team organises the work schedule to achieve project delivery.

Agile Process Models

1. Extreme Programming (XP)


2. Adaptive Software Development (ASD)
3. Dynamic Systems Development Method (DSDM)
4. Scrum
5. Crystal
6. Feature Driven Development (FDD)
7. Agile Modeling (AM)

1. Extreme Programming (XP)

MCET, SE Study Material Page 36


Software Engineering

• The most widely used agile process, originally proposed by Kent Beck [BEC99]
• XP uses an object-oriented approach as its preferred development paradigm
• Defines four (4) framework activities
– Planning
– Design
– Coding
– Testing

XP Planning

– Begins with the creation of “user stories” and then placed on an index
card.

MCET, SE Study Material Page 37


Software Engineering

– The customer assigns a value to the story based on the overall business
value of the function.
– Agile team assesses each story and assigns a cost “measured in
development weeks.”
– Stories are grouped to form a deliverable increment
– A commitment is made on delivery date

Once a commitment is made on delivery date, the XP team orders the stories that will
be developed in one of three ways:

1. All stories will be implemented immediately within a few weeks.


2. The stories with the highest value will be moved up in the schedule and
implemented first.
3. The riskiest stories will be moved up in the schedule and implemented
first.
– After the first increment (project release), “project velocity” is used to help
define subsequent delivery dates for other increments.
– Project velocity is the number of customer stories implemented during the
first release
XP – Design

• Follows the KIS (keep it simple) principle


• Encourage the use of CRC (class -responsibility - collaborator) cards
• For difficult design problems, suggests the creation of “spike solutions”—a design
prototype that is implemented and evaluated
• Encourages “refactoring”—an iterative refinement of the internal program design
that controls the code modifications by suggesting small design changes that
may improve the design.
• Design occurs both before and after coding commences

XP – Coding
• Recommends the construction of a series of unit tests for each of the stories
before coding commences
• Encourages “pair programming”
– Mechanism for real-time problem solving and real-time quality assurance
– Keeps the developers focused on the problem at hand
• Needs continuous integration with other portions (stories) of the s/w, which
provides a “smoke testing” environment

XP – Testing
• Unit tests should be implemented using a framework to make testing automated.
This encourages a regression testing strategy.
• Integration and validation testing can occur on a daily basis
• Acceptance tests, also called customer tests, are specified by the customer and
executed to assess customer visible functionality
• Acceptance tests are derived from user stories
Advantages
MCET, SE Study Material Page 38
Software Engineering

• Customer focus increase the chance that the software produced will actually
meet the needs of the users
• The focus on small, incremental release decreases the risk on your project:
– by showing that your approach works and
– by putting functionality in the hands of your users, enabling them to
provide timely feedback regarding your work.
• Continuous testing and integration helps to increase the quality of your work
• XP is attractive to programmers who normally are unwilling to adopt a software
process, enabling your organization to manage its software efforts better.

Disadvantages
• XP is geared toward a single project, developed and maintained by a single
team.
• XP is particularly vulnerable to "bad apple" developers who:
– don't work well with others
– who think they know it all, and/or
– who are not willing to share their "superior” code
• XP will not work in an environment where a customer or manager insists on a
complete specification or design before they begin programming.
• XP will not work in an environment where programmers are separated
geographically.
• XP has not been proven to work with systems that have scalability issues (new
applications must integrate into existing systems).

Adaptive Software Development

• Originally proposed by Jim Highsmith


• ASD — distinguishing features
– Mission-driven planning
– Component-based focus

MCET, SE Study Material Page 39


Software Engineering

– Uses “time-boxing”
– Explicit consideration of risks
– Emphasizes collaboration for requirements gathering
– Emphasizes “learning” throughout the process
• Speculation: An adaptive cycle-planning is conducted where it uses the
customer’s mission statement, project constraints (delivery dates, user
description) and basic requirements.
• Collaboration: People working together must trust one another to:
1. criticize without animosity
2. assist without resentment
3. work as hard or harder as they do
4. have the skill set to contribute to the work at hand
5. communicate problems or concerns in a way that leads to effective action
• Learning
Learning will help them to improve their level of real understanding.
 Software development may often over estimate their own understanding
and learning will help them to improve their level of real understanding.
ASD teams learn in 3 ways:
• a) Focus Groups: The customer lends users provide feedback on
software increments that are being delivered. This provides direct
indication of whether the product is satisfying business needs or
not.
• b) Formal Technical Reviews (FTRS): ASD team members review
the software components that are developed, improving quality and
learning as they proceed.
• c) Post-mortems: ASD team becomes introspective (self thinking)
addressing its performance and process. (With the intent of
learning and then improving its approach).

Dynamic Systems Development Method


• Dynamic System Development Method is an agile S/W development approach
that provides a framework for building and maintaining systems which meet tight
time constraints through the use of incremental prototyping in a controlled project
environment.
• Promoted by the DSDM Consortium
• DSDM—distinguishing features
• Nine guiding principles
• Active user involvement is imperative.
• DSDM teams must be empowered to make decisions.
• The focus is on frequent delivery of products.
• Fitness for business purpose is the essential criterion for
acceptance of deliverables.
• Iterative and incremental development is necessary to converge on
an accurate business solution.
• All changes during development are reversible.
• Requirements are baselined at a high level

MCET, SE Study Material Page 40


Software Engineering

• Testing is integrated throughout the life-cycle.

It defines three different iterative cycles preceded by two additional life cycles activities:
DSDM lifecycle defines 3 different iterative cycles, preceded by 2 additional life cycle activities.

1. Feasibility Study: Establishes business requirements and application constraints


and then assesses whether the application is viable candidate for DSDM process.
2. Business Study: Establishes functional information requirements that allow the
application to provide business value. Defines basic application architecture and
identifies maintainability requirements for the application.
3. Functional Model Iteration: Produces a set of incremental prototypes that
demonstrate functionality for the customer. It helps in gathering additional requirements
from user feedback who exercises the prototype.
4. Design and Build Iteration: Revisits prototypes built during functional model
iteration to ensure that they provide business value for end-users. Often occurs
concurrently with Functional Model Iteration.
5. Implementation: Places latest software increment into operational environment. It
should be noted that
a) Increment may not be 100% complete.
b) Changes may be requested as increment is put in place.

In both cases, DSDM development work continues by returning to Functional Model


Iteration activity.
 DSDM can be combined with XP to provide a combination approach that defines a
solid process model.

NOTE:
Refactoring is the process of changing a software system in such a way that it does not
alter the external behavior of the code yet improves the internal structure. It is a
disciplined way to clean up code [and modify/simplify the internal design] that minimizes
the chances of introducing bugs. In essence, when you refactor you are improving the
design of the code after it has been written.

MCET, SE Study Material Page 41


Software Engineering

Development work is partitioned into “packets”


• Testing and documentation are on-going as the product is constructed
• Work occurs in “sprints è framework activities” and is derived from a “backlog è
requirements that provide business values” of existing requirements
• Meetings are very short and sometimes conducted without chairs
• “Demos” are delivered to the customer with the time-box allocated

MCET, SE Study Material Page 42


Software Engineering

Development Activities of SCRUM

MCET, SE Study Material Page 43


Software Engineering

Crystal

• Proposed by Cockburn and Highsmith


• Crystal—distinguishing features
– Actually a family of process models that allow “maneuverability” based on
problem characteristics
– Face-to-face communication is emphasized
– Suggests the use of “reflection workshops” to review the work habits of the
team

8. Feature Driven Development (FDD)

AGILE MODELING (AM): There are many situations in which software engineers
must build large, business critical systems. Scope and complexity of such systems must
be modeled so that,

 All constituencies can better understand what to be accomplished.


 Problem can be effectively partitioned among Software Engineers.
 Quality can be assessed at every step of system.

Agile Modeling is a practice-based methodology for effective Modeling and


documentation of software-based systems. Agile Modeling is a collection of values,
principles and practices for modeling effective software.

MCET, SE Study Material Page 44


Software Engineering

An Agile team must be courageous to reject any requirement, design and need to re-
factor. It must have all answers, business experts and other stakeholders should be
respected and embraced.

Modeling principles that make Agile Modeling unique are:

1) Model with a Purpose: A software engineer who uses AM should have a specific goal
in mind before creating the model. Once a goal of model is identified, type of notation
and level of details required will be more obvious.

2) Use Multiple Models: Agile Modeling suggests that each model should present a
different aspect of the system and only models provide value to their developers should
be used.

3) Travel Light: As Software Engineering work proceeds, keep only those models that
will provide long- term value and discard the rest. Every work product that is kept, must
be maintained as changes occur. It is required to look for best possible model from
various sources.

4) Know the models and tools used to create them: Understand the tools used to create
the models and also strengths and weaknesses of each model.

5) Adapt Locality: Modeling approach should be adapted to the needs of agile team.

6) Content is more important than representation: A perfect model that imports little
useful content is not as valuable as a flawed notation with valuable content. So, focus
should be on the content in model.

Question Bank:

1. What is software engineering?

2. What is Software?

3. What are the characteristics of the software?

4. What are the various categories of software?

MCET, SE Study Material Page 45