0% found this document useful (0 votes)
304 views

Blank Contractors Daily Report Interactive PDF Printable

The daily construction report summarizes the work done on a construction project over the past day. It notes the weather, site conditions, and work accomplished. The project leader provides any comments and exceptions or defects are listed along with their location and description. The report is signed by the supervisor and can include attachments to provide additional details on the day's work.

Uploaded by

Hicham KIKER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
304 views

Blank Contractors Daily Report Interactive PDF Printable

The daily construction report summarizes the work done on a construction project over the past day. It notes the weather, site conditions, and work accomplished. The project leader provides any comments and exceptions or defects are listed along with their location and description. The report is signed by the supervisor and can include attachments to provide additional details on the day's work.

Uploaded by

Hicham KIKER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Print Form Reset Form

CONTRACTOR DAILY CONSTRUCTION REPORT


(PLEASE PRINT)

DAILY REPORT NO.: DATE:


CONTRACTOR: PROJECT NO.:
PROJECT NAME:
WEATHER: SITE CONDITIONS: DAY:
Clear Windy Cool Clear Dusty Monday Thursday
Overcast Fog Warm Muddy Tuesday Friday
Rain Cold Hot Temperature Range: Wednesday

REMARKS: (Describe significant events, work accomplished, materials & equipment on site, special instructions,
of subcontractors, and number count of personnel at the site):

PROJECT LEADER COMMENTS:

NATURE OF EXCEPTION / DEFECTS (include specifications and/or drawing numbers, location, description):

CONTRACT DATE: COMPLETION DATE:


ACTUAL WORK COMPLETED % PROBABLE COMPLETION DATE:
NUMBER OF WORKERS:
SUPERVISOR’S SIGNATURE:
ATTACHMENTS: page of pages

You might also like