1. The dimensions of the square footing are 2.0m x 2.0m x 0.5m with 10 pieces of 20mm diameter reinforcement bars spaced at 0.2m. 2. The required area for the footing is 3.652 sqm to support the dead and live loads. 3. All punching shear and beam shear checks show the footing design is adequate for the given loads and soil conditions.

Uploaded by

regino abuzo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views

Foundation Design

1. The dimensions of the square footing are 2.0m x 2.0m x 0.5m with 10 pieces of 20mm diameter reinforcement bars spaced at 0.2m. 2. The required area for the footing is 3.652 sqm to support the dead and live loads. 3. All punching shear and beam shear checks show the footing design is adequate for the given loads and soil conditions.

Uploaded by

regino abuzo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

FOUNDATION

DESIGN
Project: SP5 DAVID INC.
ISOLATED SQUARE FOOTING F1
DATA :
Width of column a = 500 mm
Width of column b = 500 mm
Dead Load DL = 208.22 KN
Live Load LL = 50.51 KN
Depth of footing D= 2.5 m.
Alowable soil pressure SBC = 115 Kpa. 2,401.82 psf
3
Soil Weight Swt. = 16.2 KN/m
3
Conc.Weight Cwt. = 23.5 KN/m
Conc. Comp. Strength fc' = 20.7 Mpa 3,002.28 psi
Steel yield Strength fy = 415 Mpa 60,190.68 psi
Rebars location factor α= 1.3
Coating factor β= 1.0
Reinforcing size factor γ= 1.0
Lightweight aggregate
λ= 1.0
Concrete Factor
Required:
Size of footing
Size & number of rebars
Development length of the square ftg.

x = (L/2)-(a/2)-d DL+LL
d

a
W
b

y
D
d

L L

1.) Dimension of square footing


y= 2000 mm
Steel covering c= 75 mm
Assume total depth d= 500 mm
d= 425 mm

Page 1 Sqr-Ftg -F1


Effective soil pressure: qeff = SBC - (d*Cwt)-(Swt*y)
qeff = 70.85 Kpa

Area required: A= (DL+LL) / qeff


A= 3.652 sq.m.
L= 1.911 m
Use L = 2.0 m
Ultimate upward soil pressure: qu = (1.2DL+1.6LL)/A
qu = 82.67 Kpa

L/2 = 1.000 m.
a/2 = 0.25 m.
x= 0.325 m.

Check Beam Shear: Vu = qu * x * L


x = (L/2)-(a/2)-d Vu = 53.736 KN
d
Φ= 0.75
Vu = 1/6 Φ (fc')^.5 L d
a
53.736 1.137 d
d= 47.24 < 425 OK
W
b

Check Punching Shear:


X= (a+d) = 0.925 m
4X = 3700.000 mm
2 2
Vu = (L +X )*qu
a+d Vu = 259.95 KN
a
259945.48 N
b+d

Vu =
W

(Φ (fc')^.5 * 4X d) / 3
b

259945.48 4208.50 d
d= 61.77 < 425 OK

Use 2.0 m x 2.0 m


Square Footing

Page 2 Sqr-Ftg -F1


2.) Reinforcement of square footing

x' =(L/2)-(a/2) x' =(L/2)-(a/2)

W
b

d
L L
qu

x' = 0.750 m
Mu = (qu * L * x')* x'/2 fy = 415 Mpa
Mu = 46.502 KN.m fc' = 20.7 Mpa
Φ= 0.9 L= 2000 d= 425 mm
2
Mu = Φ fc' L d ω (1-.59ω)
46501875 = 6730087500 ω(1-.59ω)
ω(1-.59ω) = 0.006910
2
( 1 ω − 0.59 ω = 0.006910 ) / 0.59
2
1.69492 ω − 1 ω - 0.011711 = 0
2
Quadratic ω - 1.69492 ω + 0.011711 = 0
Eqaution: ω 0.006938
=
ω = ( ρ fy ) / fc'
ρ = 0.00035
ρ min = 1.4 / fy ρ min = 0.0033735
Use: ρ min
As required: As = ρ min L d
2
As = 2867.470 mm

Try Using : 20 mm Φ As = 314.16 sq.mm.


As N = 2867.470 sq.mm.
N= 9.13 pcs Use 10 pcs Bothways 0.20
As Furnished = 3141.6 sq.mm. > 2867.470 sq.mm. m. spacing
Use 2.0 X 2.0 X 0.5
F1 Square Footing

Page 3 Sqr-Ftg -F1


Project: SP5 DAVID INC.
ISOLATED SQUARE FOOTING F2
DATA :
Width of column a = 500 mm
Width of column b = 500 mm
Dead Load DL = 375.62 KN
Live Load LL = 96.73 KN
Depth of footing D= 2.5 m.
Alowable soil pressure SBC = 115 Kpa. 2,401.82 psf
3
Soil Weight Swt. = 16.2 KN/m
3
Conc.Weight Cwt. = 23.5 KN/m
Conc. Comp. Strength fc' = 20.7 Mpa 3,002.28 psi
Steel yield Strength fy = 415 Mpa 60,190.68 psi
Rebars location factor α= 1.3
Coating factor β= 1.0
Reinforcing size factor γ= 1.0
Lightweight aggregate
λ= 1.0
Concrete Factor
Required:
Size of footing
Size & number of rebars
Development length of the square ftg.

x = (L/2)-(a/2)-d DL+LL
d

a
W
b

y
D
d

L L

1.) Dimension of square footing


y= 2000 mm
Steel covering c= 75 mm
Assume total depth d= 500 mm
d= 425 mm

Page 1 Sqr-Ftg -F2


Effective soil pressure: qeff = SBC - (d*Cwt)-(Swt*y)
qeff = 70.85 Kpa

Area required: A= (DL+LL) / qeff


A= 6.667 sq.m.
L= 2.582 m
Use L = 2.6 m
Ultimate upward soil pressure: qu = (1.2DL+1.6LL)/A
qu = 89.57 Kpa

L/2 = 1.300 m.
a/2 = 0.25 m.
x= 0.625 m.

Check Beam Shear: Vu = qu * x * L


x = (L/2)-(a/2)-d Vu = 145.556 KN
d
Φ= 0.75
Vu = 1/6 Φ (fc')^.5 L d
a
145.556 1.479 d
d= 98.44 < 425 OK
W
b

Check Punching Shear:


X= (a+d) = 0.925 m
4X = 3700.000 mm
2 2
Vu = (L +X )*qu
a+d Vu = 528.87 KN
a
528871.29 N
b+d

Vu =
W

(Φ (fc')^.5 * 4X d) / 3
b

528871.29 4208.50 d
d= 125.67 < 425 OK

Use 2.6 m x 2.6 m


Square Footing

Page 2 Sqr-Ftg -F2


2.) Reinforcement of square footing

x' =(L/2)-(a/2) x' =(L/2)-(a/2)

W
b

d
L L
qu

x' = 1.050 m
Mu = (qu * L * x')* x'/2 fy = 415 Mpa
Mu = 128.380 KN.m fc' = 20.7 Mpa
Φ= 0.9 L= 2600 d= 425 mm
2
Mu = Φ fc' L d ω (1-.59ω)
128380188 = 8749113750 ω(1-.59ω)
ω(1-.59ω) = 0.014674
2
( 1 ω − 0.59 ω = 0.014674 ) / 0.59
2
1.69492 ω − 1 ω - 0.024870 = 0
2
Quadratic ω - 1.69492 ω + 0.024870 = 0
Eqaution: ω 0.014803
=
ω = ( ρ fy ) / fc'
ρ = 0.00074
ρ min = 1.4 / fy ρ min = 0.0033735
Use: ρ min
As required: As = ρ min L d
2
As = 3727.711 mm

Try Using : 20 mm Φ As = 314.16 sq.mm.


As N = 3727.711 sq.mm.
N= 11.87 pcs Use 12 pcs Bothways 0.22
As Furnished = 3769.92 sq.mm. > 3727.711 sq.mm. m. spacing
Use 2.6 X 2.6 X 0.5
F2 Square Footing

Page 3 Sqr-Ftg -F2


Project: SP5 DAVID INC.
ISOLATED SQUARE FOOTING F3
DATA :
Width of column a = 500 mm
Width of column b = 500 mm
Dead Load DL = 142.04 KN
Live Load LL = 31.57 KN
Depth of footing D= 2.5 m.
Alowable soil pressure SBC = 115 Kpa. 2,401.82 psf
3
Soil Weight Swt. = 16.2 KN/m
3
Conc.Weight Cwt. = 23.5 KN/m
Conc. Comp. Strength fc' = 20.7 Mpa 3,002.28 psi
Steel yield Strength fy = 415 Mpa 60,190.68 psi
Rebars location factor α= 1.3
Coating factor β= 1.0
Reinforcing size factor γ= 1.0
Lightweight aggregate
λ= 1.0
Concrete Factor
Required:
Size of footing
Size & number of rebars
Development length of the square ftg.

x = (L/2)-(a/2)-d DL+LL
d

a
W
b

y
D
d

L L

1.) Dimension of square footing


y= 2100 mm
Steel covering c= 75 mm
Assume total depth d= 400 mm
d= 325 mm

Page 1 Sqr-Ftg -F3


Effective soil pressure: qeff = SBC - (d*Cwt)-(Swt*y)
qeff = 71.58 Kpa

Area required: A= (DL+LL) / qeff


A= 2.425 sq.m.
L= 1.557 m
Use L = 1.6 m
Ultimate upward soil pressure: qu = (1.2DL+1.6LL)/A
qu = 86.31 Kpa

L/2 = 0.800 m.
a/2 = 0.25 m.
x= 0.225 m.

Check Beam Shear: Vu = qu * x * L


x = (L/2)-(a/2)-d Vu = 31.073 KN
d
Φ= 0.75
Vu = 1/6 Φ (fc')^.5 L d
a
31.073 0.910 d
d= 34.15 < 325 OK
W
b

Check Punching Shear:


X= (a+d) = 0.825 m
4X = 3300.000 mm
2 2
Vu = (L +X )*qu
a+d Vu = 162.21 KN
a
162213.55 N
b+d

Vu =
W

(Φ (fc')^.5 * 4X d) / 3
b

162213.55 3753.52 d
d= 43.22 < 325 OK

Use 1.6 m x 1.6 m


Square Footing

Page 2 Sqr-Ftg -F3


2.) Reinforcement of square footing

x' =(L/2)-(a/2) x' =(L/2)-(a/2)

W
b

d
L L
qu

x' = 0.550 m
Mu = (qu * L * x')* x'/2 fy = 415 Mpa
Mu = 20.888 KN.m fc' = 20.7 Mpa
Φ= 0.9 L= 1600 d= 325 mm
2
Mu = Φ fc' L d ω (1-.59ω)
20887625 = 3.148E+09 ω(1-.59ω)
ω(1-.59ω) = 0.006634
2
( 1 ω − 0.59 ω = 0.006634 ) / 0.59
2
1.69492 ω − 1 ω - 0.011244 = 0
2
Quadratic ω - 1.69492 ω + 0.011244 = 0
Eqaution: ω 0.006660
=
ω = ( ρ fy ) / fc'
ρ = 0.00033
ρ min = 1.4 / fy ρ min = 0.0033735
Use: ρ min
As required: As = ρ min L d
2
As = 1754.217 mm

Try Using : 16 mm Φ As = 201.0624 sq.mm.


As N = 1754.217 sq.mm.
N= 8.72 pcs Use 9 pcs Bothways 0.18
As Furnished = 1809.5616 sq.mm. > 1754.217 sq.mm. m. spacing
Use 1.6 X 1.6 X 0.4
F3 Square Footing

Page 3 Sqr-Ftg -F3


Project: SP5 DAVID INC.
ISOLATED SQUARE FOOTING F4
DATA :
Width of column a = 500 mm
Width of column b = 500 mm
Dead Load DL = 255.49 KN
Live Load LL = 68.57 KN
Depth of footing D= 2.5 m.
Alowable soil pressure SBC = 115 Kpa. 2,401.82 psf
3
Soil Weight Swt. = 16.2 KN/m
Conc.Weight Cwt. = 23.5 KN/m3
Conc. Comp. Strength fc' = 20.7 Mpa 3,002.28 psi
Steel yield Strength fy = 415 Mpa 60,190.68 psi
Rebars location factor α= 1.3
Coating factor β= 1.0
Reinforcing size factor γ= 1.0
Lightweight aggregate
λ= 1.0
Concrete Factor
Required:
Size of footing
Size & number of rebars
Development length of the square ftg.

x = (L/2)-(a/2)-d DL+LL
d

a
W
b

y
D
d

L L

1.) Dimension of square footing


y= 2000 mm
Steel covering c= 75 mm
Assume total depth d= 500 mm
d= 425 mm

Page 1 Sqr-Ftg -F4


Effective soil pressure: qeff = SBC - (d*Cwt)-(Swt*y)
qeff = 70.85 Kpa

Area required: A= (DL+LL) / qeff


A= 4.574 sq.m.
L= 2.139 m
Use L = 2.2 m
Ultimate upward soil pressure: qu = (1.2DL+1.6LL)/A
qu = 86.01 Kpa

L/2 = 1.100 m.
a/2 = 0.25 m.
x= 0.425 m.

Check Beam Shear: Vu = qu * x * L


x = (L/2)-(a/2)-d Vu = 80.422 KN
d
Φ= 0.75
Vu = 1/6 Φ (fc')^.5 L d
a
80.422 1.251 d
d= 64.28 < 425 OK
W
b

Check Punching Shear:


X= (a+d) = 0.925 m
4X = 3700.000 mm
2 2
Vu = (L +X )*qu
a+d Vu = 342.71 KN
a
342705.64 N
b+d

Vu = (Φ (fc')^.5 * 4X d) / 3
W
b

342705.64 4208.50 d
d= 81.43 < 425 OK

Use 2.2 m x 2.2 m


Square Footing

2.) Reinforcement of square footing

Page 2 Sqr-Ftg -F4


x' =(L/2)-(a/2) x' =(L/2)-(a/2)

W
b

d
L L
qu

x' = 0.850 m
Mu = (qu * L * x')* x'/2 fy = 415 Mpa
Mu = 68.358 KN.m fc' = 20.7 Mpa
Φ= 0.9 L= 2200 d= 425 mm
Mu = Φ fc' L d2 ω (1-.59ω)
68358352.3 = 7403096250 ω(1-.59ω)
ω(1-.59ω) = 0.009234
( 1 ω − 0.59 ω2 = 0.009234 ) / 0.59
2
1.69492 ω − 1 ω - 0.015650 = 0
2
Quadratic ω - 1.69492 ω + 0.015650 = 0
Eqaution: ω = 0.009285
ω = ( ρ fy ) / fc'
ρ = 0.00046
ρ min = 1.4 / fy ρ min = 0.0033735
Use: ρ min
As required: As = ρ min L d
As = 3154.217 mm2

Try Using : 20 mm Φ As = 314.16 sq.mm.


As N = 3154.217 sq.mm.
N= 10.04 pcs Use 11 pcs Bothways 0.20
As Furnished = 3455.76 sq.mm. > 3154.217 sq.mm. m. spacing