1. This document is a takeoff sheet for an excavation project. It provides dimensions and calculations to determine the volumes needed for various excavation and backfill tasks. 2. Key items calculated include 51.07 cubic meters for trench excavation, 66.82 cubic meters for total excavation, and 97.12 cubic meters for cartaway/selected fill. 3. Dimensions and calculations are provided for excavation of footings, strap footings, strap beams, a masonry wall, and backfilling around various structures.

Uploaded by

azmera ayele
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views23 pages

Typology F2 Sec2

1. This document is a takeoff sheet for an excavation project. It provides dimensions and calculations to determine the volumes needed for various excavation and backfill tasks. 2. Key items calculated include 51.07 cubic meters for trench excavation, 66.82 cubic meters for total excavation, and 97.12 cubic meters for cartaway/selected fill. 3. Dimensions and calculations are provided for excavation of footings, strap footings, strap beams, a masonry wall, and backfilling around various structures.

Uploaded by

azmera ayele
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

takeoff sheet

Project Date
Location Page
Employer Block no.

timising dimension squaring description item dimension squaring description


A.Sub structure
1.Excavation and earth works 51.07 total volume of trench excavation
1.1 Site clearing top soil the
avdrage depth of 20cm 66.82 total volume of excavation

1.5 Backfill
around footing pad F1
4 5
0.25 cp=2(1.5+1.5)-4*0.25
0.3
1.5
5.40
1 0.25 around strap footing(SF1)
0.55 cp=2(1.6+1.6)-0.25*4
1 13.98 0.74
10.93
152.80 1 6.5
1 5.88 0.25
3.18 deduct 0.55 cp=2(2.15+1.6)-4*0.25
18.70 0.89

134.10 total area of site clearing 2 5 around strap footing (SF2)


0.25 CP=2(1.5+1.5)-4*0.25
1.2.Bulk excavation 0.55
not exceed 1500 mm 1.38
1 12.48
9.43 2 6.3
0.5 0.25 CP=2(2.05+1.6)-4*0.25
58.8432 0.55
1.73
1 5.88
3.18 deduct 1 1.58 for strap beam
0.5 0.5 SB1
9.35 0.4
0.32
49.49 total volume of bulk excavation
2 1.73
1.3.Pit excavation 0.5
assume total length of foundation 0.4
column 2.25 0.69

4 1.5 5.75 Total volume of strap footing


1.5
1.75 Around masonry wall
15.75 total volum of pit excavation 1 23.5
1.00 2(12.05+9.05)-4*1-2(1.55+0.5)-4*(1+0.5)-2(1+0.5-(1.1+0.5)
1.3.Trench excavation 0.80
for strap footing 18.80 m3
SF1
1 1.6 1 23.5
1.6 0.50
1.75 0.80
4.48 2.25-0.5 9.4 deduct
1 2.15 1 0.85
1.6 1.00
1.75 0.8
6.02 0.68 m3
1 1.58 for strap beam 1(SB1) 1 0.85
0.75 1.58=4-(1.65/2)-1.1-0.25-0.25 0.5
1.2 0.8
1.42 0.34 m3
2 1.5 SF2 1 3.65
1.5 1
1.75 0.8
7.88 2.92 m3
2 2.05 1 3.65
1.6 0.5
1.75 0.8
11.48 1.46 m3
2 1.73 strap beam 2 1 3.3
0.75 1
1.2 1.73=4-1.0-(1.55/2)-0.25-0.25 0.8
3.11 2.64 m3
1 3.3
34.39 total volum of trench excavation for strap 0.5
0.8
1.4.2.Masonery wall 1.32 m3
for periferal wall 1 2.3
assume 50cm and 1m deepwall 1
0.8
1 21.1 1.84 m3
1 2(12.05+9.05) 1 2.3
1.05 0.5
22.155 0.8
0.92 m3
1 1.10 axisB-B B/n 1-1 &2-2 13.44 total volume of back fill around masonery
1.00 1.5 Cartaway
1.05 97.12 m3 total volume of cartaway
1.155 1.1=2.45-0.55-0.55-0.25 1.6 50cm selected fill under hard core
1 3.73 B/n axis A-B & 1-2
2.18
axisB-B B/n 2-2 & 3-3 0.5
4.07 m3
1 3.65 3.65=5.25-0.55-0.55-.25-.25 1 3.83 B/n axis B-C &1-2
1.00 1.98
1.05 0.5
3.83 3.79 m3
axis 2-2' B/n B-B &C-C 1 4.85 b/n axis A-B&2-3
3.53
1 3.30 3.3=4.3-0.5-.25-.25 0.5
1.00 8.56 m3
1.05 1 3.83 b/n axis B-C& 2 -2'
3.47 1.7
0.5
Axis 2-2 B/n B-B&C-C 3.26 m3
1 3.83
1 2.53 2.53=4.3-1.65/2-.25-.25-1/2 2.68 b/n axis B-C&2'-3
1.00 0.5
1.05 5.13 m3
2.66 1 3.28
4 1.5 2.55 b/n axis A-A' &3-4
1 0.5
1.05 4.18 m3
6.3 to be deducted for pit on the periffer 28.99 Total volum of hard core in m3
2 concrete work
1 1.6 2.1 lean concrete 5cm tick
1 A. lean concret under F1
1.05 4 1.00
1.68 to be deducted for strap 1 pad from 1.00
perrifery 4.00 m2
2 2.05 1 1.1 B. under strap footing
1 1.1 SF1
1.05 1.21
4.31 to be deducted for strap 2 pad 1 1.65
1.1
2 1.5 1.82
1 1 2.08 for strap beam 1
1.05 0.25
3.15 to be deducted from strap2 0.52
2 1 SF2
16.67 total volume of trench for masonry 1
116.31 total volume of excavation
2.00
2 1.55 2 7.45 GB2
1.1 0.25
3.41 0.4
2 2.23 for strap beam 2 1.49 m3
0.25 1 7.45 GB3
1.12 0.25
c. under msonery wall 0.4
1 40.2 0.75
0.5 1 4.05 GB4
20.10 0.25
9 0.25 0.4
0.25 0.41 m3
0.56 deduct 2 3.6 grade beam of slab edge axis A-A,A'-A' B/N 3-3 &4-4
1 7.2 axis B-B b/n 1-1 &3-3 0.25
0.5 0.4
3.60 0.72 m3
1 4.05 axis 2'-2' b/n B-B &C-C 1 2.3 axis 4-4B/N A-A&B-B
0.5 0.25
2.03 0.4
1 3.75 axis 2-2 b/n A-A&B-B 0.23
0.5 6.16 total volume of concrete for grade beam
1.88 2.2.5 ground floor slab with 0.50m thickness
1 2.55 axis 3-3 b/n A-A &A'-A' 1 3.75 B/N axis A-A&1-2
0.5 2.2
1.28 8.25
1 3.75 axis 2-2 b/n B-B &C-C 1 4.05 B/N axis B-C&1-2
0.5 2.2
1.88 8.91
44.26 Total area of lean concrete 1 5 B/N axis A-B&2-3
2.2 concrete work c25 3.75
4 1.00 2.2.1 footing pad 18.75
1.00 1 4.05 on axis B-C&2-2'
0.25 F1 1.85
1.00 7.49
F1 1 4.05 B/N axis B-C &2'-3
2.2.2 strap footing 2.9
1 1.10 strap footng 1 SF1 11.75
1.10 1 3.35 B/N axis A-A'&3-4
0.55 2.55
0.67 8.54
1 1.65 63.69 total area of lean concrete for ground floor slab
1.10 2.3 Form work
0.55 2.3.1 around footing pad
1.00 m3
16 1.0 F1
1 4.25 0.25
0.25 strap beam 4.00 Total area of form work around footing pad
0.40 2.3.2 strap footing
0.43 m3
4 1.1 strap 1- SF1
2 1.55 0.55
1.1 2.42
0.55 2 1.65
1.88 m3 0.55
3.30 volume of concrete for strap 1 1.82
2 1.55 strap 2 for footing 2 2 1.1
1.1 0.55
0.55 1.21
1.88 m3 2 4.25 strap beam
2 1.1 0.4
1.1 3.40
0.55 2 0.25
1.33 m3 0.4
2 4.25 strap beam 0.20
0.25 8 1 SF2
0.4 0.55
0.85 4.40
3.03 volume of concrete for strap 2 (SF2) 4 1.55
6.33 total volume of concrete for strap 0.55
2.2.3 foundetion column 3.41
4 0.25 C1 4 1.1
0.25 2.25-0.3=1.95m 0.55
1.95 2.42
0.49 m3 4 4.25 for strap beam
6 0.25 strap footing column 0.4
0.25 2.25-.55=1.7 6.80
1.7 4 0.25
0.64 m3 0.4
1.13 total volume of concrete for 0.40
foundation column 26.48 total area of form workfor strap
3 8.55 2.2.4 gread beam
0.25 on axis 1-3 b/n A-C
0.4
2.57 m3
87.09 total volume of concrete
2.3.3.Foundation column

16 0.25 foundation column form work


1.95
7.80
24 0.25
1.7
10.20
2.3.4.Grade beam
GB1exterior formwork
2 8.55
0.4
6.84
4 7.8
0.4 GB2 interior formwork
12.48
1 11.5
0.4 GB2 exterior
4.60
2 10.8
0.4 GB2 interior
8.64
1 10.55
0.4 GB3 exterior
4.22
1 11.55
0.4 GB3 interior
4.62
1 10.55
0.4 GB4
4.22
2 4.05
0.4 Grade beam at slab edge
3.24
97.34 m2
total area of form work
takeoff sheet
Project Date
Location Page
Employer Block no.

timising squaring item dimension squaring description


dimension description d) For first floor slab
15 cm thick slab
B.SUPER STRUCTURE b\n axis A & B and axis 1&2
1.CONCRETE WORK 1 3.75
1.1 C-25 reinforced concrete 2.20 8.25 m2
a)In Elevation Columns b\n axis A & B and axis 2&3
12 For ground floor column 1 5.00
0.25 3.75 18.75 m2
0.25 col. Height= 2.88-0.40 b\n axis B&C and axis 1&2
2.48 1.86 1 4.05
m3 2.20 8.91 m2
10 For first floor column b\n axis B&C and axis 2'&3
0.25 1 4.05
0.25 2.90 11.75 m2
2.48 1.55 For balcony's slab portion
3.41 m3 1 8.55 b\n axis A,B&C and axis 1'&1
m3 Total 1.38 11.76 m2
3 b) For first floor beam For corridor slab portion
8.55 on axis 1,2&3 1 1.85
0.25 b\n axis A,B&C 0.95 1.76 m2
0.40 2.57 61.17 m2 Total
2 m3 e) For staircase
7.20 on axis A&B The triangular portion
0.25 b\n axis 1,2&3 14 0.03 0.3
0.40 1.44 0.88 0.18
1 m3 0.33 m3
2.20 on axis C 2 2.45 For stair soffit
0.25 b\n axis 1&2 0.88
0.40 0.22 0.17
1 m3 0.73 m3
2.90 on axis C 1 1.85 For landing
0.25 b\n axis 2'&3 1.00
0.40 0.29 0.17
1 m3 0.31 m3
4.05 on axis 2' 1 1.85 For landing beam
0.25 b\n axis B&C 0.25
0.40 0.41 0.40
4.92 m3 0.19 m3
m3 Total 1.57 m3 Total
3 c) For top tie beam 1.2 Formwork
8.55 on axis 1,2&3 a)In Elevation Columns
0.20 b/n axis A,B&C For ground floor column
0.30 1.54 48 0.25 col. Height= 2.88-0.40
3 m3 2.48 29.76 m2
7.20 on axis A,B&C For first floor column
0.20 b\n axis 1,2&3 40 0.25
0.30 1.30 2.48 24.80 m2
1 m3 54.56 m2 Total
4.05 on axis 2' b) For first floor beam
0.20 b\n axis B&C on axis A ( beam exterior)
0.30 0.24 b\n axis 1,2,3&4
2 m3 1 11.55 P=2*(0.4)+0.25-0.15=0.90
3.60 on axis A&A'(G.floor) 0.90 10.40 m2
0.20 b/n axis 3&4 deduct
0.30 0.432 8 0.25
1 m3 0.25 0.50 m2
2.55 on axis 4 (G.floor)
0.20 b/n axis A&A'
0.30 0.15
3.66 m3
m3 Total
BAR SCHEDULE
No. of bar Total
Location Shape
Length
per
No. of
No. block
Total no. dia 10 dia 12 length
diam
14 dia 16 dia 20 dia 24
m member of Bar dia 6 dia 8
dia mm member mm mm mm mm mm mm Remark
mm mm
SUBSTRUCTURE
F1 12 1.32 14 4 1 73.92
3c,2'c,2c,1c 14 2.02 68 1 1 137.36
14 2.57 20 1 1 51.4
5.05 4 1 1 20.2
4.35 2 1 1 8.70
SF2 1.82 36 2 1 131.04
axis 1&3 2.47 18 2 1 88.92
2.02 26 2 1 105.04
5.05 4 2 1 40.4
4.35 2 2 1 17.4
stirrup on SF1 1.2 19 1 1 22.8
stirrup on SF2 1.2 19 2 1 45.6

Foundation column
on SF1axis 1A,column
Total length (m)
Unit weight(Kg/m)
Total weight (Kg)

BAR SCHEDULE
No. of bar Total length m
Length No. of Total no.
Location Shape dia per No. block dia 6 dia 8 dia 10 dia 12 dia 14 dia 16 dia 20 dia 24
m member of Bar
mm member mm mm mm mm mm mm mm mm Remark
SUPER STRUCTURE
1st Floor Beam
TFB-1 on axis 1 & b/n A-C 16 9.20 2 1 1 2 18.40
TFB-1 on axis 1 & b/n A-C 16 2.85 3 1 1 3 8.55
TFB-1 on axis 1 & b/n A-C 16 4.20 3 1 1 3 12.60
TFB-1 on axis 1 & b/n A-C 16 4.50 4 1 1 4 18.00
TFB-1 STIRRUP (b) on axis A-B 8 1.20 14 2 1 28 33.60
TFB-1 STIRRUP (b) on axis B-C 8 1.20 14 2 1 28 33.60
TFB-1 STIRRUP (a) on axis A-B 8 1.20 7 1 1 7 8.40
TFB-1 STIRRUP (a) on axis B-C 8 1.20 8 1 1 8 9.60
TFB-2 on axis 2 & b/n A-C 16 9.20 2 1 1 2 18.40
TFB-2 on axis 2 & b/n A-C 16 2.85 1 1 1 1 2.85
TFB-2 on axis 2 & b/n A-C 16 4.20 3 1 1 3 12.60
TFB-2 on axis 2 & b/n A-C 16 4.50 2 1 1 2 9.00
TFB-2 STIRRUP (b) on axis A-B 8 1.20 14 2 1 28 33.60
TFB-2 STIRRUP (a) on axis B-C 8 1.20 22 1 1 22 26.40
TFB-2 STIRRUP (a) on axis A-B 8 1.20 7 1 1 7 8.40
TFB-3 on axis 3& b/n A-C 16 9.20 2 1 1 2 18.40
TFB-3 on axis 3& b/n A-C 14 2.85 1 1 1 1 2.85
TFB-3 on axis 3& b/n A-C 16 8.50 2 1 1 2 17.00
TFB-3 STIRRUP (a) on axis A-B 8 1.20 20 1 1 20 24.00
TFB-3 STIRRUP (a) on axis B-C 8 1.20 22 1 1 22 26.40
TFB-4 on axis A & b/n 1-3 16 8.60 2 1 1 2 17.20
TFB-4 on axis A & b/n 1-3 14 2.55 2 1 1 2 5.10
TFB-4 on axis A & b/n 1-3 16 2.65 2 1 1 2 5.30
TFB-4 on axis A & b/n 1-3 16 5.45 2 1 1 2 10.90
TFB-4 on axis A & b/n 1-3 14 5.45 2 1 1 2 10.90
TFB-4 STIRRUP (a) on axis 1-2 8 1.20 12 1 1 12 14.40
TFB-4 STIRRUP (a) on axis 2-3 8 1.20 10 1 1 10 12.00
TFB-4 STIRRUP (c) on axis 2-3 8 1.20 12 2 1 24 28.80
TFB-5 on axis B & b/n 1-3 20 8.60 2 1 1 2 17.20
TFB-5 on axis B & b/n 1-3 20 2.55 3 1 1 3 7.65
TFB-5 on axis B & b/n 1-3 14 2.65 2 1 1 2 5.30
TFB-5 on axis B & b/n 1-3 20 5.45 5 1 1 5 27.25
TFB-5 on axis B & b/n 1-3 20 2.20 2 1 1 2 4.40
TFB-5 STIRRUP (a) on axis 1-2 8 1.20 6 1 1 6 7.20
TFB-5 STIRRUP (b) on axis 1-2 8 1.20 8 2 1 16 19.20
TFB-5 STIRRUP (d) on axis 2-3 8 1.20 17 2 1 34 40.80
TFB-5 STIRRUP (a) on axis 2-3 8 1.20 10 1 1 10 12.00
TFB-6 on axis C & b/n 1-2 14 3.35 2 1 1 2 6.70
TFB-6 on axis C & b/n 1-2 14 2.65 2 1 1 2 5.30
TFB-6 STIRRUP (a) on axis 1-2 8 1.20 12 1 1 12 14.40
TFB-7 on axis C & b/n 2'-3 14 4.05 2 1 1 2 8.10
TFB-7 on axis C & b/n 2'-3 14 3.35 2 1 1 2 6.70
TFB-7 STIRRUP (a) on axis 2'-3 8 1.2 16 1 1 16 19.20
TFB-8 on axis 2' & b/n B-C 14 5.20 2 1 1 2 10.40
TFB-8 on axis 2' & b/n B-C 14 4.50 3 1 1 3 13.50
TFB-8 on axis 2' & b/n B-C 14 1.90 1 1 1 1 1.90
TFB-8 STIRRUP (a) on axis b/n 2'-3 8 1.20 22 1 1 22 26.40

Total length (m)


Unit weight(Kg/m)
Total weight (Kg)
BAR SCHEDULE
No. of bar Total length m
Length No. of Total no.
Location Shape per No. block dia 6 dia 8 dia 10 dia 12 dia 14 dia 16 dia 20 dia 24
m member of Bar
dia mm member mm mm mm mm mm mm mm mm Remark
SUPER STRUCTURE
1st Floor slab
1st Floor slab b/n axis A-B & 1'-3 8 10.92 20 1 1 20 218.4
1st Floor slab b/n axis B-B' & 1'-3 8 10.92 6 1 1 6 65.52
1st slab b/n axis B'-C & '1-2 8 4.92 17 1 1 17 83.64
1st slab b/n axis B'-C & 2'-3 8 5.41 17 1 1 17 91.97
1st slab b/n axis A-C & 1-1' 8 8.52 8 1 1 8 68.16
1st slab b/n axis A-C & 1-2 8 11.09 12 1 1 12 133.08
1st slab b/n axis A-B & 2-2' 8 5.47 12 1 1 12 65.64
1st slab b/n axis A-C & 2'-3 8 11.09 16 1 1 16 177.44
1st Floor slab b/n axis A-C & 1-1' 12 2.42 62 1 1 62 150.04
1st Floor slab b/n axis A-B & '2-2' 10 2.55 20 1 1 20 51.00
1st Floor slab b/n axis B-B' & 1-2 8 2.85 12 1 1 12 34.20
1st Floor slab b/n axis B-B' & 2'-3 10 2.85 21 1 1 21 59.85
Stair Case
In staircase & landing on sec.A-A & B-B No 1 8 0.85 7 2

Total length (m)


Unit weight(Kg/m)
Total weight (Kg)
BAR SCHEDULE
No. of bar Total length m
Length No. of Total no.
Location Shape per No. block dia 6 dia 8 dia 10 dia 12 dia 14 dia 16 dia 20 dia 24
m member of Bar
dia mm member mm mm mm mm mm mm mm mm Remark

Total length (m)


Unit weight(Kg/m)
Total weight (Kg)
Item Description Unit Qty
A. SUBSTRUCTURE (MAIN BULDING)
1.EXCAVATION AND EARTH WORK
1.1 clear and remove top soil to averege depth of 20 cm m²
1.2 Bulk excavation in ordinary soil Not excedindg 150cm from reduced level m³

1.3 Trench excavation in ordinary soil for masonery foundation a depth of 150cm from m³
reduced level

1.4 Excavation for isolated footing foundation from sripped ground level to a depth not m³
exceeding 150cm including working space allowance
1.5 Cart away surplus excavated maerials from the site as per he Engineer instruction m³

1.6 selected mateial fill around isolated footing foundation&trench excavated from out side m³
of site well ram & compact in layer not exceeding 20cm thick

1.7 25cm thick basaltic or equivaltnt stone hard core well rolled, consolidated and blinded m²
with crushed stone

1.8 Fill under hard core with imported selected material from out side wel rolled and m³
compact in layers not exceeding 20 cm
1.9 20mm thick chipwood or styrafom expanstion joint b/n slab and beam ml

TOTAL CARRID TO SUMMARY

2.CONCRET WORK
2.1 50 mm lean concret, quality c-5, 150 Kg of cement /m³ under:
a) Footing m²

2.2 Reinforced concret quality C-25 ,360 kg of cement/m³ filled in tof foarm work and
vibrateed around rod reinforcement
a)In footing pad m³
b) In Foundation column m³
c)In gread bream m³
d) In 15 cm thick ground floor slab m³
e) In entrance steps m³
Provide ,cut and fx in position swn zigba wood or seel
2.3
foarmwork which ever
a) Footing pad m²
b) Foundation column m²
c) gread beam m²
e) In entrance steps m³
2.4 Mild steel reinforcement according to structural drawings. prace inccldes cuting,
bendeing ,placing in position and tying wire.
a) dia 8 mm plain bar Kg
b) dia 10 mm deformed bar Kg
c) dia 12mm deformed bar Kg
d) dia 14 mm deformed bar Kg
e) dia 16 mm deformed bar Kg
f) dia 20mm deformed bar Kg
TOTAL CARRID TO SUMMARY
3. MASONERY WORKS
50cm thick trachytic or equivalnet stone masonary foudation below NGL bedded and
3.1 jointed in cement sand mortar 1:3

TOTAL CARRID TO SUMMARY


B.SUPER STRUCTURE
1.CONCRETE WORK
C-25 reinforced concrete wit a minimum cement content of 360 kg/m³ to be poured in
1.1 to formwork around renforcmet bar (unless otherwise described foarmwork and
reinforcment measured separetly)

a)In elevation columns m³


b)In 1st floor beam m³
c)In Top tie beam m³
d) In 15cm thick 1st floor and roof slab m³
e) In stair case m³
1.2 Provide cut on size and fix in position sawn zigba wood wood or eqivalent formwork to:
a) elevation columns m²
b) floor beam m²
b) In Top tie beam m²
c) 15cm thick 1st floor and roof slab m²
g) stair case m²
supply annd fix reiinforcment steel bars ,price includes cutting ,bending and placing in
1.3 position and tying wires

a) dia 8 mm plain bar Kg


b) dia 10 mm deformed bar Kg
c) dia 12 mm deformed bar Kg
d) dia 14 mm deformed bar Kg
e) dia 16mm deformed bar Kg
f) dia 20 mm deformed bar Kg
TOTAL CARRID TO SUMMARY
2.BLOCK WORK
2.1 20 cm thick H.C.B wallbedded in cement morter 1:3 both side left for plastering m²
2.2 m²
10 cm thick H.C.B wall bedded in cement morter 1:3 both side left for plastering
TOTAL CARRID TO SUMMARY
3 ROOFING
supply and fix Dcra roof cover on 7x5cm zigba wood purlin placed c/c 40cm spacing
3.1 Truss members and purlins re to be mesured sparetly

3.3 supply and fix G-28 sheet metal gutter with development length of 145 cm ,price shall ml
include joint fixture and all accoorging to the detail drawing provided
TOTAL CARRID TO SUMMARY
4.CARPENTERY & JOINERY
40mm thick flush typee wood door finised on both side
with mahogan lapping degs all round including solid fram
4 .1
and sub frame coated in three coats of varnish paint.

The lock sahll be cylinderical lock,


a) D-01 Size : 700 x 2100 mm. No
b) D-02 Size : 800 x 2100 mm. No
supply and amount Ø 10 cm euquliptus truss according
4.2 to the given drawing .price includes anchoragee bar,metal
bands and wo coats of anti termite paint.
a)upper and lower chord ml
b) vertical and diagonal members ml
4.3 50x70 mm zigba Wooden Purlin ml

4.4 supply and fix 7x5cm zigba battens ml

4.4 m²
supply and fix 8mm thick chhipwood ceiliing fixed to 4x5cm supply

and fix flush type built in cupboard semi solid core acedexternally wiith best quality
4.5 play wood and internally with normal play wood fed to vertical and horizontal timber
bracing .Edge slipped with a hard wood timber
a) BC1 size:2900x2380x600mm pcs
b) BC1 size:2900x1650x600mm pcs

4.6 supply and fx kitchen cabinet made of hard wood frame covered with white formica top
with shelves and best quality cylinderical lock with handel coomplete work including
all the necessary iron mongery
a)size 480 x60/50x90/60 pcs
TOTAL CARRID TO SUMMARY
5. METAL WORK
All door and winows are manufactured from aluminum
profile frames.All works should be cut and assembled to
the size& shape of the door and window schedule any
necesity like water guidance metal specially to external
windows.price includes approved type cylinderical lock by Architect
5.1 DOOR
D-01 size 90x2650 No.
D-01 size 80x2100 No.
D-01 size 70x2100 No.
5.2 Windows
w1 - Size2650x3000 mm No.
W2 - Size1500x1200 mm No.
W3- Size1500x1600 mm No.
W4- Size1000x1600 mm No.
W5- Size800x600 mm No.
W6- Size1000x1200 mm No.
W7 - Size1800x1200 mm No.
W8- Size740x540 mm No.
W9- Size1440x540 mm No.
W10- Size3000x940 mm No.
W11 - Size2400x1800 mm No.
No.
5.3 Aluminum Window Door
WD-01 Size2400x2700 mm No.
TOTAL CARRID TO SUMMARY

6. PAVING AND FLOORING


6.1 Provide 5cm thick cement screeed above RCC floor slab m²
6.2 supply and fix 30x30 cm PVC floor tile m²
supply and fix terazzo floor tile around enterance cement and sand mix 1:3 ratio with m²
6.3 approprate adhes
6.4 supply and fix 10cm high ceramic tile skirting stuck to wall with approprate adhesive m²
TOTAL CARRID TO SUMMARY
7.FINISHING
Apply three coat of plastering in cement mortar (1:3). Price shall include pre cleaning
7.1 and preparation of the surface
Price shall include pre cleaning and preparation of the surface
a) internal wall finish two coats of plastering and one coat of gypsum m²
b) Apply two coat of plastering to external wall , beam and column to recive quariz m²
wall paint
7.2 Ditto like item no 7.1 but , concrete ceiling and stair soffit plastering m²
7.3 Ditto ,but two coats of plastering to receive glazed m²
ceramic wall tile m²
7.4 apply three coat of plastering to external HCB wall surface m²

TOTAL CARRID TO SUMMARY


8.PANTIG
9.1 Apply three coats of plastic emulsion paint to internal plasterd wall surface m²
9.2 Ditto but conctere soffit and stair case m²
9.3 Apply three coats of plastic emulsion paint to external plasterd wall surface m²
apply quartez paint
9.GLAZING
9.1 supply and fix 4mm thickclear glass to window and doors
TOTAL CARRID TO SUMMARY
Rate Amount

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0

0
0

0
0
0

You might also like