0% found this document useful (0 votes)
52 views1 page

Ebs1-Fsfa11-Sapn-Dwpr-1007-D00-Typical Details Concrete Protection Slab

1. The document provides specifications for reinforced concrete protection slabs for a high pressure pipeline. 2. Dimensions are in millimeters. The words "HIGH PRESSURE PIPELINE" shall be cast in 80mm high letters in three locations per slab. 3. Concrete must have a minimum density of 2320kg/m3 and compressive strength of 25 MPa after 28 days.

Uploaded by

Asaad Adnan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

Ebs1-Fsfa11-Sapn-Dwpr-1007-D00-Typical Details Concrete Protection Slab

1. The document provides specifications for reinforced concrete protection slabs for a high pressure pipeline. 2. Dimensions are in millimeters. The words "HIGH PRESSURE PIPELINE" shall be cast in 80mm high letters in three locations per slab. 3. Concrete must have a minimum density of 2320kg/m3 and compressive strength of 25 MPa after 28 days.

Uploaded by

Asaad Adnan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES:

1. ALL DIMENSION IN MILLIMETERS.


2. THE WORDS "HIGH PRESSURE PIPELINE" SHALL BE
CAST INTO SLAB IN LETTERS AT LEAST 80mm
HIGH AND AT THREE LOCATION PER SLAB.
BE OR 3. CONCRETE TO HAVE A MINIMUM DENSITY OF 2320kg/m3

T O T AND A COMPRESSIVE STRENGTH OF 25 MPa AT 28 DAYS.

S RA C
E
EY ONT
T G C
I N Y S T
I F F B C A
L G N E -
S I R
D E P
BE
T O
A B
SL
75
0

H
IG
E
0

H
0

LI
15 .

P
R
E

E
IP
N

S
I

S
M

U
R

R
U

E
S

P
S

IP
E

E
R
P

LI
k
H

N
0
IG

E
30
H

M m
H
E 0m
100

S
E
IR 15
H

W F
IG

#9 R O
H

m E
P

Y
R

0m LA
E

8th.6.2022
S
S

x NE
U
R

15
O
E
P
IP
E
LI
N
E

Date Sign:
REINFORCED CONCRETE Code I Information only Submission - Accepted
Code R Rejected – Major Comments – Data Provider to revise and re-submit.
PROTECTION SLAB Work should NOT proceed in the affected areas until comments are
resolved.

Code C Comments Returned – Data provider to revise and re-submit for the
further review.
DIA. 12 LIFTING EYE Code A Accepted – Approved – No further submission required
Client: EPCC CONTRACTOR :

EBS OILFIELD PROJECT

MESH PROJECT TITLE:


Provision of Flow lines and OHTL EPCC Project

CONTRACT NO. : 031-SC-21


DOCUMENT NUMBER : EBS1-FSFA11-SAPN-DWPR-1007-D00
V=1.5X0.75X0.1=0.1125M3 DETAIL -A DOCUMENT TITLE :

M=0.1125X2320=261kg TYPICAL DETAILS


CONCRETE PROTECTION SLAB

D00 25.05.22 ISSUE FOR APPROVAL Bharat Yousef Ahmed Hythem


REV Date Issue Status Draw By Checked By Reviewed By Approved By
Scale : 1:1 Paper size A1 SH: 1 OF 1

You might also like