HEC-RAS 5.0 Reference Manual-5
HEC-RAS 5.0 Reference Manual-5
Bald Eagle Creek Example Dam Break Study Plan: PMF - Froehlich Breach Parameters 10/28/2008
Bald Eagle Cr. Lock Haven
Legend
680
EG 03JAN1999 0300
WS 03JAN1999 0300
Crit 03JAN1999 0300
Ground
660
640
Elevation (ft)
620
600
580
Figure 14-23. Example of Initial Conditions for a Reservoir and Lateral Structures
connected to Storage Areas.
Low Flow Conditions. Low flows can often be very difficult to model with an unsteady flow
model. Medium to steeper slope streams will often have a pool and riffle sequence at low flow,
and the water surface will generally pass through critical depth at the upper end of the riffle
(bottom of the pool). In addition to this, the depths of water are very shallow. Once the flood
wave begins the water surface will change quickly, and there will be a large change in depth
with respect to distance and time. The leading edge of a dam break flood wave will be very
steep, and can often be a source of model instability as it propagates down the river system.
The finite difference solution to the equations will generally have the most trouble balancing
during the initial dramatic rise at the beginning of the flood wave. The fact that the initial
conditions may be very low flows and depths can make it even more difficult to solve the
equations through those shallow and steep riffle regions.
There are several things the modeler can do to allow the program to solve the equations in a
stable manner in low flow situations. The easiest solution is to increase the base flow for the
initial conditions. This will provide a higher initial depth of water in general, and it may also
drowned out the pool and riffle sequence. A general “rule of thumb” is to start out by trying a
base flow around 1% of the peak flow that will be routed. Increase the base flow if necessary,
but never go above 10% of the peak flow. If you artificially use a base flow that is 10% or more
of the peak, the computed peak flow and stage will be higher than it would have been
otherwise.
14-70
Chapter 14 – Performing a Dam Break Study with HEC-RAS
If you have increased the base flow to a reasonable level, and are still having model stability
problems at the leading edge of the flood wave, then try adding a pilot channel for the reach in
which the model is having stability issues. A pilot channel is an option in which will add some
depth without adding much flow area or conveyance. The pilot channel is an option in HEC-RAS,
and it is only used during low flow, once the cross sections get to some appreciable depth, the
program automatically removes it from the cross section. To learn more about the use of pilot
channels, please review the section on Pilot channels in Chapter 6 of the HEC-RAS User’s
Manual.
One other option that can help stabilize the model during the initial rise of the flood wave, is
turning on the Mixed Flow Regime Option. This option drops the acceleration terms when the
Froude number gets greater than a user defined threshold, which is often the case on the
leading edge of the flood wave.
Additionally, if a boundary condition is ill posed, this can be a source of model instability (i.e.
rating curves with not enough points, or the user entered stages are too low for a given flow
rate; and normal depth boundaries where the user has entered to steep of a slope for the
energy gradeline). In other words, the downstream boundary condition may be causing abrupt
drops or rises in the computed water surface near the location of the boundary condition. An
example of what can happen when using a Normal Depth boundary condition, and entering too
steep of an energy slope is shown in Figure 14-24. In this case, the steep energy slope caused
the program to compute lower stages than appropriate for a given flow, which in turn caused
the model to over steepen the flood wave at the downstream end of the model.
14-71
Chapter 14 – Performing a Dam Break Study with HEC-RAS
Unsteady with smaller event
Geom: Beaver Cr. - bridge Flow :
Beaver Creek Kentw ood
Le ge nd
210
Elevation (ft)
205
200
Figure 14-24. Example model error due to bad downstream boundary condition.
The latest version of HEC-RAS (5.0 or later) now has the ability to perform two-dimensional flow
routing. For a dam break study, the user can model the downstream area entirely with 1D
elements (Cross sections and storage areas); as a combination of 1D and 2D elements (cross
sections, storage areas, and 2D flow areas); or the entire downstream area can be modeled as a
2D flow area.
2D flow areas can be directly connected to storage areas by using a hydraulic structure called a
Storage Area/ 2D Flow Area Hydraulic Connector (“SA/2D Area Conn”). See the example below
in Figure 14-25.
14-72
Chapter 14 – Performing a Dam Break Study with HEC-RAS
In the example shown in Figure 14-25, the storage area is upstream of the 2D flow area, so the
positive flow direction is from the storage area to the 2D flow area. So when defining the
hydraulic structure that connects the two areas, the storage area will be considered the
headwater side, and the 2D flow area will be considered the tailwater side. In the example
shown in Figure 14-25, a storage area is being used to represent a reservoir pool. The hydraulic
connection between the storage area and the 2D flow area is used to model the dam. The 2D
flow area is being used to model the hydraulics of the flow downstream of the dam.
Additionally, the user could model the reservoir pool with a 1D river reach, or a 2D flow area.
Using the approach shown in Figure 14-25, is a very quick way to get a dam break model up and
running. However, modeling the downstream area with a 2D flow area, does not necessarily
14-73
Chapter 14 – Performing a Dam Break Study with HEC-RAS
make this a detailed model. Downstream areas will often have bridges, culverts, roads that are
barriers to flow, levees protecting urban areas, etc… These types of areas require detailed
modeling to get accurate answers, whether you are modeling them as 2D flow areas or 1D river
reaches. Developing a detailed model for the downstream area requires detailed terrain,
hydraulic structure information, and the time to model those areas correctly. If a 2D flow area is
used, it still requires lots of work to make the computational mesh respect all of the barriers to
flow (bridges, culverts, roads, levees, etc…). Developing a detailed computational mesh that
respects all of the flow barriers, and includes all of the hydraulic structures is the most time
consuming part of developing a model, but it is necessary to get good results downstream. If
you do not take the time to do this, and you just throw in a 2D flow area with a nominal grid
size, do not assume you have “accurate” results just because you are doing 2D modeling.
14-74
APPENDIX A
References
Ackers, P., and White, W.R. November 1973. “Sediment Transport: New Approach and
Analysis,” Journal of the Hydraulics Division, American Society of Civil Engineers, Vol. 99, No. HY
11, pp. 2040-2060.
Alonso, Santillana and Dawson. 2008. On the diffusive wave approximation of the shallow water
equations. Euro. J. Appl. Math. 2008, Vol. 19.
American Iron and Steel Institute (AISI), 1980. Modern Sewer Design, Washington D.C.
American Society of Civil Engineers. 1977. “Sedimentation Engineering, “Vito A. Vanoni, ed.,
American Society of Civil Engineers Task Committee, American Society of Engineers, New York.
Amein, M. and Fang, C.S., 1970, "Implicit Flood Routing in Natural Channels,” Journal of the
Hydraulics Division, ASCE, Vol. 96, No. HY12, Proc. Paper 7773, pp. 2481-2500.
Amin, M.I., and Murphy, P.J. August 1981. “Two Bed-Load Formulas: An Evaluation,” Journal of
the Hydraulics Division, American Society of Civil Engineers, Vol. 107, No. HY8, pp. 961-972.
Arcement, G. J., Jr., and V. R. Schneider, 1989. “Guide for Selecting Manning’s Roughness
Coefficient for Natural Channels and Floodplains,” U.S. Geological Survey, Water Supply Paper
2339, 38 p., Washington D.C.
Balzano. 1998. Evaluation of methods for numerical simulation of wetting and drying in shallow
water flow models. Coastal Eng. 1998, 34.
Barkau, R.L., 1981, "Simulation of the Failure of Illinois River Levees," Memo to File, St. Louis
District, Corps of Engineers, St. Louis, MO.
Barkau, R.L., 1982, "Simulation of the July 1981 Flood Along the Salt River," Report for CE695BV,
Special Problems in Hydraulics, Department of Civil Engineering, Colorado State University, Ft.
Collins, CO.
Barkau, R.L., 1985, "A Mathematical Model of Unsteady Flow Through a Dendritic Network,"
Ph.D. Dissertation, Department of Civil Engineering, Colorado State University, Ft. Collins, CO.
Barkau, Robert L., 1992. UNET, One-Dimensional Unsteady Flow Through a Full Network of
Open Channels, Computer Program, St. Louis, MO.
Bathe, K. and Wilson, E.L., 1976, Numerical Methods in Finite Element Analysis, Prentice-Hall,
Inc., Englewood Cliffs, NJ.
A-1
References
Briaud, J., Ting, C., Chen, H., Cao, Y., Han, S., and Kwak, K. (2001) “Erosion Functions Apparatus
for Scour Rate Predictions,” Journal of Geotechnical and Geoenvironmental Engineering, 106-
113.
Brunner, Gary W., August 1994. "Improved Hydraulic Features of the HEC River Analysis
System," presented at the ASCE Hydraulic engineering conference, Buffalo, NY
Brunner, Gary W. and John H. Hunt, 1995. A Comparison of the One-Dimensional Bridge
Hydraulic Routines from: HEC-RAS, HEC-2, and WSPRO, Research Document No. 41, Hydrologic
Engineering Center, U.S. Army Corps of Engineers, September 2009, Davis, CA.
Brunner, Gary W., June 1996. “HEC-RAS (River Analysis System),” presented at the ASCE North
American Water and Environmental Congress, Anaheim, CA.
Brunner, Gary W., June 1996. “Computing Bridge Scour With HEC-RAS,” presented at the ASCE
North American Water and Environmental Congress, Anaheim, CA.
Brunner, Gary W., Mark R. Jensen, and Steven S. Piper, 2000. Unsteady Flow Routing with the
Hydrologic Engineering Center River Analysis System (HEC-RAS), Watershed Management and
Operations Management, ASCE, EWRI, June 2000, Fort Collins, CO.
Brunner, Gary W. and Mark E. Forest, 2002. Unsteady Flow Routing With HEC-RAS – Truckee
River, Joint Federal Interagency Conference, April 2002, Las Vegas, NV
Brunner, Gary W., 2003. Dam and Levee Breaching With HEC-RAS, World Water &
Environmental Resources Congress, ASCE, EWRI, June 2003, Philadelphia, PA.
Brunner, Gary W. and Stanford S. Gibson, 2005. Sediment Transport Modeling in HEC-RAS,
World Environmental & Water Resources Congress, ASCE, EWRI, May 2005, Anchorage, AL.
Brunner, Gary W. and Cameron T. Ackerman, 2012. “HEC-RAS Modeling for Operation of the
Birds Point - New Madrid Floodway, Mississippi River Flood of 2011”, World Environmental &
Water Resources Congress, ASCE, EWRI, May 2012, Albuquerque, NM.
Brunner, Gary W., 2014. Using HEC-RAS for Dam Break Studies, Training Document No. 39,
Hydrologic Engineering Center, U.S. Army Corps of Engineers, August 2014, Davis, CA.
Brunner, Gary W., Steven S. Piper, Mark R. Jensen, and Ben Chacon, 2015. Combined 1D and 2D
Hydraulic Modeling within HEC-RAS, World Environmental & Water Resources Congress, ASCE,
EWRI, May 2015, Austin, TX.
Barnes, Harry H,, Jr., 1967. “Roughness Characteristics of Natural Channels,” U.S. Geological
Survey, Water Supply Paper 1849, Washington D.C.
Blench, T. , 1970, “Regime Theory Design of Canals with Sand Beds.” Journal of the Irrigation
and Drainage Division, ASCE, Vol. 96, No. IR2, Proc. Paper 7381, pp 205-213.
A-2
Bradley, J.N., 1978. Hydraulics of Bridge Waterways, Hydraulic Design Series No. 1, Federal
Highway Administration, U.S. Department of Transportation, Second Edition, revised March
1978, Washington D.C.
Brownlie, William R., 1981 (Nov). “Prediction of Flow Depth and Sediment Discharge in Open
Channels,” Report No. KH-R-43A, California Institute of Technology, W.M Keck Laboratory of
Hydraulics and Water Resources, Report No. KH-R-43A, November 1981. Pasadena, CA.
Brownlie, Williem R. 1983 (Jul). “Flow Depth in Sand Bed Channels.” Journal of Hydraulic
Engineering. American Society of Civil Engineers, Vol 109, No 7, pp 959-990.
Bureau of Public Roads (BPR), 1965. Hydraulic Charts for the Selection of Highway Culverts,
Hydraulic Engineering Circular No. 5, U.S. Department of Commerce.
Bureau of Reclamation, 1977. Design of Small Dams, Water Resources Technical Publication,
Washington D.C..
Casulli and Stelling. 2010. Semi-implicit subgrid modelling of three dimensional free-surface
flows. Int. J. Numer. Meth. Fluids. 2010.
Casulli. 2008. A high-resolution wetting and drying algorithm for free-surface hydrodynamics.
Int. J. Numer. Meth. Fluids. 2008.
Casulli and Zanolli. 2005. High resolution methods for multidimensional advection-difusion
problems in free surface hydrodynamics. Ocean Modelling. 2005, 10.
Casulli and Zanolli. 2002. Semi-implicit numerical modelling of nonhydrostatic free-surface flows
for environmental problems. Math. Comp. Modelling. 2002, 36.
Casulli and Walters. 2000. An unstructured grid, three-dimensional model based on the shallow
water equations. Int. J. Numer. Meth. Fluids. 2000, 32.
Casulli. 1997. Numerical simulation of three-dimensional free surface flow in isopycnal co-
ordinates. Int. J. Numer. Meth. Fluids. 1997, Vol. 25.
Casulli and Cattani. 1994. Stability, accuracy and efficiency of a semi-implicit method for three-
dimensional shallow water flow. Computers Math. Applic. 1994, Vol. 27.
Casulli and Cheng. 1992. Semi-implicit finite difference methods for three dimensional shallow
water flow. Int. J. Numer. Meth. Fluids. 1992, Vol. 15.
Casulli and Cheng. 1990. Stability analysis of Eulerian-Lagrangian methods for the one-
dimensional shallow water equations. Appl. Math. Modelling. 1990, Vol. 14.
Casulli. 1990. Sami-implicit fiinite difference methods for the two-dimensional shallow water
equations. J. Comp. Physics. 1990, 86.
A-3
References
Chanson, Hubert. 1999. “The Hydraulics of Open Channel Flow.” John Wiley & Sons Inc., New
York.
Chen, Y.H., 1973, "Mathematical Modeling of Water and Sediment Routing in Natural Channels,"
Ph.D. Dissertation, Department of Civil Engineering, Colorado State University, Ft. Collins, CO.
Chen, Y.H. and Simons, D.B., 1979, "A Mathematical Model of the Lower Chippewa River
Network System," Report CER-79 DBS-YHC-58, Department of Civil Engineering, Colorado State
University, Ft. Collins, CO.
Chow, V.T., 1959, Open Channel Hydraulics, McGraw-Hill Book Company, NY.
Colby, B.R. March 1964. “Practical Computations of Bed-Material Discharge,” Journal of the
Hydraulics Division, American Society of Civil Engineers, Vol 90, No. HY2, pp 217-246.
Copeland, Ronald R., and Thomas, William A. 1989. “Corte Madera Creek Sedimentation
Study.” Numerical Model Investigation. US Army Engineer Waterways Experiment Station,
Vicksburg, MS. TR-HL-89-6
Copeland, R. R. and Thomas, W. A. (1992) “Dynamic Sorting and Armoring Algorithm in TABS-1
Numerical Sedimentation Model,” Proceedings, International Seminar on Grain Sorting, Ascona,
Swotzerland, Mitteilungen 117 der Versuchsanstalt für Wasserbau, Hydrologieund Gaziologie,
ETH Zurich, pgs. 359-368.
Cunge, J.A., Holly, F.M., and Verwey, A., 1980, Practical Aspects of Computational River
Hydraulics, Pitman Advanced Publishing Program, Boston, MA.
Einstein, Hans A. 1950. “The Bed Load Function for Sediment Transportation in Open Channels,”
Technical Bulletin 1026, US Department of Agricultural, Soil Conservation Service, Washington,
D.C.
Fasken, G.B., 1963. “Guide for Selecting Roughness Coefficient n Values for Channels,” Soil
Conservation Service, US department of Agriculture, 45 p.
Federal Emergency Management Agency, 1985. Flood Insurance Study Guidelines and
Specifications for Study Contractors, FEMA 37, Washington D.C., September 1985.
Federal Highway Administration, 1984. “Guide for Selecting Manning's Roughness Coefficients
for Natural Channels and Flood Plains,” Report No. FHWA-TS-84-204, McLean, Virginia.
Federal Highway Administration, 1985. Hydraulic Design of Highway Culverts, Hydraulic Design
Series No. 5, U.S. Department of Transportation, September 1985, Washington D.C..
Federal Highway Administration, 1986. Bridge Waterways Analysis Model: Research Report,
Report No. FHWA/RD-86/108, July 1986, Washington D.C..
A-4
Federal Highway Administration, 1990. User’s Manual for WSPRO - A Computer Model for
Water Surface Profile Computations, Publication No. FHWA-IP-89-027, September 1990.
Federal Highway Administration, 1996. Channel Scour at Bridges in the United States,
Publication No. FHWA-RD-95-184, August 1996, Washington D.C.
Fread, D.L., 1974, Numerical Properties of the Implicit Four Point Finite Difference Equations of
Unsteady Flow," NOAA Technical Memorandum NWS Hydro-18, U.S. Department of Commerce,
NOAA, NWS, Silver Spring, MD, 123pp.
Fread, D.L., 1976, "Theoretical Development of an Implicit Dynamic Routing Model," Hydrologic
Research Laboratory, Office of Hydrology, U.S. Department of Commerce, NOAA, NWS, Silver
Spring, MD., presented at Dynamic Routing Seminar, Lower Mississippi River Forecast Center,
Slidell, LA., 13-17 Dec 1976.
French, R.H., 1985, Open-Channel Hydraulics, McGraw-Hill Book Company, New York.
Friazinov, 1970, "Solution Algorithm for Finite Difference Problems on Directed Graphs," Journal
of Mathematics and Mathematical Physics, Vol. 10, No. 2, (in Russian).
Froehlich, D.C., 1989. Local Scour at Bridge Abutments, Proceedings of the 1989 National
Conference on Hydraulic Engineering, ASCE, New Orleans, LA, pp. 13-18.
Froehlich, D.C., 1991. Analysis of Onsite Measurements of Scour at Piers, Proceedings of the
ASCE National Hydraulic Engineering Conference, Colorado Springs, CO.
Gibson, S and Piper, S (2007) “Sensitivity and Applicability of Bed Mixing Algorithms” EWRI ASCE
Water Congress.
Graf, Walter Hans. 1971. “Hydraulics of Sediment Transport.” McGraw Hill, Inc.,
Hager, W. H., 1987. “Lateral Outflow Over Side Weirs”, Journal of Hydraulic Engineering, ASCE,
Vol. 113, No. 4, PP 491-504.
Ham, Pietrzak and Stelling. 2006. A streamline tracking algorithm for semi-Lagrangian advection
schemes based on the analythic integration of the velocity field. J. Comp. Appl. Math. 2006, 192.
Hanson, G.J. (1996) “Investigating Soil Strength and Stress-Strain Indices to Characterize
Erodibility,” Transactions of the American Society of Agricultural Engineers, 39 (3), 883-890.
Hanson, G.J. and Simon, A. (2001) “Erodibility of Cohesive Streambeds in the Loess Area of the
Midwestern USA,” Hydrologic Processes, 15, 23-38.
A-5
References
Hicks, D.M. and P.D. Mason, 1991. Roughness Characteristics of New Zealand Rivers, Water
Resources Survey, DSIR Marine and Freshwater, New Zealand, June 1991.
Hirano, M (1971) “River Bed Degradation with Armoring,” Proceedings of Japan Society of Civil
Engineers, 195, 55-65.
Hromadka, et al. 2010. Manning's equation and two dimensional flow analogs. J. Hydrology.
2010, 389.
Huang, J., Hilldale, R.C., Greiman, B. P. (2006) “Cohesive Sediment Transport,” Erosion and
Sedimentation Manual, U.S. Department of the Interior Bureau of Reclamation, 55p
Hydrologic Engineering Center, 1986. “Accuracy of Computed Water Surface Profiles,” Research
Document 26, U.S. Army Corps of Engineers, Davis CA.
Hydrologic Engineering Center, 1991. HEC-2, Water Surface Profiles, User's Manual, U.S. Army
Corps of Engineers, Davis CA.
Hydrologic Engineering Center, August 1993. HEC-6 Generalized Computer Program. “Scour
and Deposition in Rivers and Reservoirs,” User’s Manual. U.S. Army Corps of Engineers, Davis
CA.
Hydrologic Engineering Center, 1994. HECDSS, User's Guide and Utility Programs Manual, U.S.
Army Corps of Engineers, Davis CA.
Hydrologic Engineering Center, 1995. RD-42, Flow Transitions in Bridge Backwater Analysis, U.S.
Army Corps of Engineers, Davis CA., September 1995
Hydrologic Engineering Center, 1997. UNET, One-Dimensional Unsteady Flow Through a Full
Network of Open Channels, User's Manual, U.S. Army Corps of Engineers, Davis, CA.
Henderson, F.M., 1966, Open Channel Flow, Macmillan Publishing Co., Inc., NY, 523pp.
Iwagaki, Yuichi. 1954. “On the Law of Resistance to Turbulent Flow in Open Rough Channels,”
Proceedings of the 4th Japan National Congress for Applied Mechanics, pp 229-233.
Jansen, P.Ph. 1979. “Principles of River Engineering, the Non-Tidal Alluvial River.” Delftse
Uitgevers Maatsschappij, Delft, The Netherlands.
Jarrett, R.D., 1984. “Hydraulics of High Gradient Streams,” A.S.C.E. Journal of Hydraulic
Engineering, Vol. 110, No. 11, November 1984.
Keulegan, Garbis H. 1938. “Laws of Turbulent Flow in Open Channels,” Research Paper RP
1151, National Bureau of Standards, Journal of Research, vol 21: PP 701-741.
Kindswater, C.E. and R.W. Carter 1957. “Discharge Characteristics of Rectangular Thin-Plate
Weirs.” J. Hyd. Div. ASCE, 83, No. HY6, pp 1453-1 to 35.
A-6
King, H.W. and E.F. Brater 1963. Handbook of Hydraulics, Fifth Edition, McGraw Hill Book
Company, New York.
Knapen, A., Poesen, J., Govers, G., Gyssels, G., and Nachtergaele (2007) “Resistance of Soils to
Concentrated Flow Erosion: A Review,” Earth-Science Review, 80, 75-109.
Krone, R. B. (1962) Flume Studies of the Transport of Sediment in Estuarial Shoaling Processes,
Hydrologic Engineering Laboratory, University of California Berkley
Lamb, Crossley and Waller. 2008. A fast two-dimansional floodplain inundation model. Water
Management. 2008, 162.
Lane, E.W., 1953, “Design of Stable Channels.” American Society of Civil Engineers, Transactions,
Paper number 2776, pp 1234-1261.
Laursen, Emmett M., 1958 (Feb). “Total Sediment Load of Streams,” Journal of the Hydraulics
Division, American Society of Civil Engineers, 84(HY1), 1530-1 to 1530-36.
Laursen, E.M., 1960. Scour at Bridge Crossings, ASCE Journal of Hydraulic Engineering, Vol. 89,
No. HY 3.
Laursen, E.M., 1963. An Analysis of Relief Bridges, ASCE Journal of Hydraulic Engineering, Vol.
92, No. HY 3.
Leer. 1979. Towards the ultimate conservative difference scheme. A second-order sequel to
Godunov's method. J. Comp. Physics. 1979, 32.
Liggett, J.A., and Cunge, J.A., 1975, "Numerical Methods of Solution of the Unsteady Flow
Equations," in Unsteady Flow in Open Channels, edited by K. Mahmood and V. Yevjevich, Vol. I,
Chapter 4, Water Resources Publications, Ft. Collins, CO.
Limerinos, J.T. 1970. “Determination of the Manning Coefficient from Measured Bed
Roughness in Natural Channels,” Geological Survey Water-Supply Paper 1898-B, Prepared in
cooperation with the California Department of Water Resources, US Government Printing
Office, Washington DC, 20402.
Lindsey, W.F., 1938. “Typical Drag Coefficients for Various Cylinders in Two Dimensional Flow,”
NACA Technical Report 619.
Livsey, Robert H. 1963. “Channel Armoring Below Fort Randall Dam” Proceedings of the
Federal Inter-Agency Sedimentation Conference, Miscellaneous Publication No. 970. Agricultural
Research Service, U.S. Department of Agriculture. p 469.
McNeil, J., Taylor, C., and Lick, W. (1996) “Measurements of Erosion of Undisputed Bottom
Sediments with Depth, Journal of Hydraulic Engineering,122(6), 316-324
A-7
References
Meyer, et al. 2002. Generalized barycentric coordinates on irregular polygons. Journal of
Graphics Tools. 2002, Vol. 7.
Parker, G. (2008) “Chapter 3: Transport of Gravel and Sediment Mixtures” ASCE Manual of
Practice 120 (in press).
Parker, G. (1991) “Selective Sorting and Abrasion of River Gravel I: Theory,” ASCE Journal of
Hydraulic Engineering, 117(2), 131-149.
Parker, G. (1991) “Selective Sorting and Abrasion of River Gravel II: Applications,” ASCE Journal
of Hydraulic Engineering, 117(2), 131-149.
Partheniades E. 1962. A Study of Erosion and Deposition of Cohesive Soils in Salt Water. Berkeley
PhD Dissertation.
Pathirana, et al. 2008. A simple 2-D inundation model for incorporating flood damage in urban
drainage planning. Hydrol. Earth Syst. Sci. Discuss. 2008, 5.
Proffitt, G.T., and Sutherland, A.J. 1983. “Transport of Non-Uniform Sediments,” Journal of
Hydraulic Research, vol. 21, No. 1, pp. 33-43.
Raudkivi, Arved J. 1998. “Loose Boundary Hydraulics,” A.A. Balkema, Rotterdam, pp 8-28.
Ravens, T. (2007) “Comparison of Two Techniques to Measure Sediment Erodibility in the Fox
River, Wisconsin,” Journal of Hydraulic Engineering, 133(1), 111-115.
Reed, J.R. and A.J. Wolfkill, 1976. “Evaluation of Friction Slope Models,” River 76, Symposium on
Inland Waterways for Navigation Flood Control and Water Diversions, Colorado State University,
CO.
Richardson, E.V., D.B. Simons and P. Julien, 1990. Highways in the River Environment, FHWA-HI-
90-016, Federal Highway Administration, U.S. Department of Transportation, Washington, D.C.
Roberts, J., Jepsen, R., Gotthard, D., Lick, W. (1998) “Effects of Particle Size and Bulk Density on
Erosion of Quartz Particles, ASCE Journal of Hydraulic Engineering, 124(12), 1261-1267.
Russel, Takano and Abramopoulos. 1987. Comparison of horizontal difference schemes for the
shallow water equations on a sphere. Short- and Medium-Range Numerical Weather Prediction.
1987.
Rouse, H. (1965) Engineering Hydraulics, John Wiley & Sons, Inc., 1950, fifth printing, pp. 828-
829.
Rubey, W.W. 1933. “Settling Velocities of Gravel, Sand, and Silt Particles,” American Journal of
Science, 5th Series, Vol. 25, No 148, 1933, pp. 325-338.
Sanford, L. P. and Halka, J.P. (1993) “Assessing the Paradigm of Mutually Exclusive Erosion and
Deposition of Mud, With Examples from Upper Chesapeake Bay,” Marine Geology, 114: 37-57.
A-8
Sanford, L.P. and Maa, J.P. (2001) “A Unified Erosion Formulation for Fine Sediments,” Marine
Geology, 179, 9-23.
Santillana and Dawson. 2010. A local discontinuous Galerkin method for a doubly nonlinear
diffusion equation arising in shallow water modeling. Comp. Meth. Appl. Mech. Eng. 2010, 199.
Santillana and Dawson. 2009. A numerical approach to study the properties of solutions of the
diffusive wave approximation of the shallow water equations. Comput. Geosci. 2009.
Schaffranek, R.W., et al., 1981, "A Model for the Simulation of Flow in Singular and an
Interconnected Network of Channels," Techniques of Water Resources Investigations, Chapter 3,
U.S. Geological Survey, Reston, VA.
Schenk and Gärtner. 2006. On fast factorization pivoting methods for symmetric indefinite
systems. Elec. Trans. Numer. Anal. 2006, 23.
Schenk and Gärtner. 2011. Parallel Sparse Direct and Multi-Recursive Iterative Linear Solvers:
Pardiso User Guide Version 4.1.2. 2011.
Schenk and Gärtner. 2004. Solving unsymmetric sparse systems of linear equations with
PARDISO. J. Future Generation Comp. Systems. 2004, 20(3).
Schenk, Bollhoefer and Roemer. 2008. On large-scale diagonalization techniques for the
Anderson model of localization. SIAM Review. 2008, 50.
Shearman, J. O., 1990. User’s Manual for WSPRO - A computer model for water surface profile
computations, Federal Highway Administration, Publication No. FHWA-IP-89-027, 177 p.
Simons, Daryl B., and Senturk, Fuat. 1992. “Sediment Transport Technology.” Water Resources
Publications, Littleton, Colorado.
Smith, R.H., 1978, "Development of a Flood Routing Model for Small Meandering Rivers," Ph.D.
Dissertation, Department of Civil Engineering, University of Missouri at Rolla, MO.
Streeter, V.L. and Wylie, E.B., 1967, Hydraulic Transients, McGraw-Hill Book Company, NY.
Tayefi, et al. 2007. A comparison of one- and two-dimensional approaches to modelling flood
innundation over complex upland floodplains. Hydrol. Processes. 2007, 21.
Thacker. 1981. Some exact solutions to the non-linear shallow-water wave equations. J. Fluid
Mech. 1981, Vol. 107.
A-9
References
Thomas, W. A., (1982) "Mathematical modeling of sediment movement," Chapter 18 of Gravel
Bed Rivers, Edited by R.D. Hey, J.C. Bathurst and C.R. Thorne, John Wiley & Sons Ltd, 487-508.
Thomas, W. A. (2010) Sedimentation in Stream Networks (HEC 6T): User Manual, 388p
Toffaleti, F.B. 1968. Technical Report No. 5. “A Procedure for Computation of Total River Sand
Discharge and Detailed Distribution, Bed to Surface”, Committee on Channel Stabilization, U.S.
Army Corps of Engineers, November, 1968
Toro-Escobar, C. M., Parker, G., Paola, C. (1996) “Transfer Function for the Deposition of Poorly
Sorted Gravel in Response to Streambed Aggradation,” Journal of Hydraulic Research, 34(1), 35-
53.
Tucci, C.E.M., 1978, "Hydraulic and Water Quality Model for a River Network," Ph.D.
Dissertation, Department of Civil Engineering, Colorado State University, Ft. Collins, CO.
U.S. Army Corps of Engineers, 1965. Hydraulic Design of Spillways, EM 1110-2-1603, Plate 33.
U.S. Army Corps of Engineers, 1990. Hydraulic Design of Spillways, EM 1110-2-1603, US Army
Corps of Engineers, Washington DC.
U.S. Army Corps of Engineers, 1993. HEC 6 Scour and Deposition in Rivers and Reservoirs: User
Manual, 288p.
USACE, 1993, River Hydraulics, Engineer Manual 1110-2-1416, Headquarters, U.S. Army Corps of
Engineers, Washington, DC, October 1993.
US Army Corps of Engineers. 1994. “Channel Stability Assessment for Flood Control Projects,”
EM 1110-2-1418, US Army Corps of Engineers, Washington DC.
US Army Corps of Engineers. 1994. “Engineering and Design – Hydraulic Design of Flood Control
Channels,” EM 1110-2-1601, US Army Corps of Engineers, Washington DC.
US Army Corps of Engineers, Waterways Experiment Station. 1998. “SAM Hydraulic Design
Package for Channels User’s Manual,” Vicksburg, MS.
U.S. Bureau of Reclamation (USBR), 1985, Canal Radial Gate Structure Design for Arizona Canal
System, WCPM 11.04.
U.S. Geological Survey, 1953. Computation of Peak Discharge at Contractions, Geological Survey
Circular No. 284, Washington, D.C.
U.S. Geological Survey, 1968. Measurement of Peak Discharge at Width Contractions By Indirect
Methods, Water Resources Investigation, Book 3, Chapter A4, Washington, D.C.
Van Rijn, Leo C. 1984. “Sediment Transport, Part I: Bed Load Transport,” Journal of Hydraulic
Engineering, American Society of Civil Engineers, Vol 110, No. 10, pp 1412-1430.
A-10
Van Rijn, Leo C. 1993. “Principles of Sediment Transport in Rivers, Estuaries, Coastal Seas and
Oceans,” International Institute for Infrastructural, Hydraulic, and Environmental Engineering,
Delft, The Netherlands.
Versteeg and Malalasekera. 2007. An Introduction to Computational Fluid Dynamics: The Finite
Volume Method. 2007.
Villemonte James R. 1947. “Submerged Weir Discharge Studies.” Engineering New Record,
December 15, 1947. pp 54 to 57.
Wang, Zhao and Fringer. 2011. Reconstruction of vector fields for semi-Lagrangian advection on
unstructured, staggered grids. Ocean Modelling. 2011, 40.
Waterways Experiment Station (WES), 1973, Bridge Pier Losses, Section 010-6, Hydraulic Design
Criteria, U.S. Army Corps of Engineers, Vicksburg, MS.
Wilcock, P. R. and Crowe, J. C. (2003) “Surface-based Transport Model for Mixed-Size Sediment”
ASCE Journal of Hydraulic Engineering, 129(2), 120-128.
Wong, M., 2003, Does the bedload equation of Meyer-Peter and Müller fit its own data?,
Proceedings, 30th Congress, International Association of Hydraulic Research, Thessaloniki, J.F.K.
Competition Volume: 73-80.
Wong, M. and Parker, G., (2006) “Reanalysis and Correction of Bed-Load Relation of Meyer-
Peter and Müller Using Their Own Database,” Journal of Hydraulic Engineering, 132(11), 1159-
1168,
Yang, C.T. 1973. “Incipient Motion and Sediment Transport,” Journal of the Hydraulics Division,
American Society of Civil Engineers, Vol. 99, No HY10, October, 1973, pp 1679-1704.
Yang, C.T. 1984. “Unit Stream Power Equation for Gravel,” Journal of the Hydraulics Division,
American Society of Civil Engineers, Vol. 110, No. 12, December 1984, pp1783-1797.
Yang, C.T., Schenggan, Wan, 1991. “Comparison of Selected Bed-Material Load Formulas,”
Journal of Hydraulic Engineering, American Society of Civil Engineers, Vol 117, No. 8, August
1991, pp 973-989.
Yarnell, D.L., 1934. “Bridge Piers as Channel Obstructions,” Technical Bulletin 442, U.S.
Department of Agriculture, Washington D.C.
Yu and Lane. 2006. Urban fluvial flood modelling using a two-dimensional diffussion-wave
treatment, part 1: mesh resolution effects. Hydrol. Processes. 2006, 20.
Yu and Lane. 2006. Urban fluvial flood modelling using a two-dimensional diffussion-wave
treatment, part 2: development of a sub-grid-scale treatment. Hydrol. Processes. 2006, 20.
A-11
Appendix B Flow Transitions in Bridge Backwater Analysis
APPENDIX B
1
4
Contraction Reach
CR
Lc
A B 2
C D
Typical flow transition
pattern
Le Expansion Reach
B-1
Appendix B Flow Transitions in Bridge Backwater Analysis
The data used in this study consisted of 3 actual bridge sites and 76 idealized bridge sites. The
field data had certain hydraulic characteristics in common. All had wide, heavily vegetated
overbanks, with Manning’s n values from 0.07 to 0.24, and slopes between 2.5 feet/mile and 8.0
feet/mile. To extend the scope and general applicability of the study, it was decided to create a
large number of two-dimensional models (using RMA-2, King, 1994) of idealized floodplain and
bridge geometries. Figure B-2 shows a typical cross section for the idealized cases. The overall
floodplain width was constant at 1000 feet. The main channel n value was constant at 0.04.
The other pertinent parameters were systematically varied as follows:
1000 feet
Pier
b
4
10 feet 1
2
Bridge Embankment
50 feet
In addition to the systematic variation of these parameters, eleven additional cases were
created which had vertical abutments rather than spill-through abutments, six cases were
developed which had asymmetric rather than symmetric bridge obstructions, and four more
cases were studied which were enlarged-scale and reduced-scale versions of four of the
standard cases. A total of 97 idealized models were created.
Once the data were collected for all of the idealized models, they were analyzed with the aid of
the statistical analysis program STATGRAPHICS (STSC, 1991). The goals of the statistical analysis
were to compile summary statistics and develop regression relationships for the parameters of
B-2
Appendix B Flow Transitions in Bridge Backwater Analysis
interest where possible. Table B-1 lists the summary statistics for the four parameters of
interest.
Variable Le Lc Ce Cc
Sample size 76 76 76 76
The regression relationships were required to express Le, Lc, Ce, and Cc as functions of
independent hydraulic variables which could be easily evaluated by the users of a one-
dimensional model such as HEC-RAS. Some of the independent variables used in the regression
analysis, such as discharge, slope, and roughness, had been set in defining each case. The other
variables, such as Froude numbers, discharge distributions, velocities, depths, and conveyances,
were evaluated from the HEC-RAS models, which had been developed for each case. The raw
independent variables were then entered into a spreadsheet. In the spreadsheet other
variables were created as ratios and multiples of some of the raw variables.
After the spreadsheet of independent variables was complete, it was saved as an ASCII text file,
which was in turn converted into a STATGRAPHICS data file. Only the cases with symmetric
openings and spill-through abutments were included in the regression analyses. Those cases
which had asymmetric openings or vertical abutments, were later compared with the
corresponding symmetric, spill-through cases.
B-3
Appendix B Flow Transitions in Bridge Backwater Analysis
The results from the two-dimensional flow models did not always indicate the presence of large-
scale flow separations or eddy zones downstream of the bridge. Their presence corresponded
with the larger values of Le. For many of the cases there was no significant separation evident
in the results. In sensitivity tests, the presence or absence of eddy zones was not sensitive to
the eddy viscosity coefficient value. Likewise, eddy viscosity settings did not have an
appreciable effect on Le.
It was found that the ratio of the channel Froude number at Section 2 to that at Section 1
(Fc2/Fc1) correlated strongly with the length of the expansion reach. Regression equations
were developed for both the expansion reach length and the expansion ratio. The equations are
presented later in this appendix. Both equations are linear and contain terms involving the
Froude number ratio and the discharge. The equation for expansion length also includes the
average obstruction length in one term. To use these regression equations in the application of
a one-dimensional model will usually require an iterative process since the hydraulic properties
at Section 2 will not be known in advance. The effort involved in this process will not be large,
however, because the method will usually converge rapidly.
The value of the Froude number ratio reflects important information about the relationship
between the constricted flow and the normal flow conditions. It is in effect a measure of the
degree of flow constriction since it compares the intensity of flow at the two locations. Since
these Froude numbers are for the main channel only, the value of Fc1 also happens to reflect to
some extent the distribution of flow between the overbanks and main channel.
There was no support from these investigations for the WSPRO concept of the expansion reach
length being proportional to or equal to the bridge opening width.
B-4
Appendix B Flow Transitions in Bridge Backwater Analysis
Because the mean and median values of the contraction ratios were both around 1:1, there is
some support from this study for the rule of thumb which suggests the use of a 1:1 contraction
ratio. There is no support, however, for the concept of the contraction reach length being equal
to or proportional to the bridge opening width.
Expansion Coefficients
Regression analysis for this parameter was only marginally successful. The resulting relationship
is a function of the ratio of hydraulic depth in the overbank to that in the main channel for
undisturbed conditions (evaluated at Section 1). Perhaps more interesting are the summary
statistics, which indicate lower values for this coefficient than the traditional standard values for
bridges.
Contraction Coefficients
Owing to the nature of this data (69 out of 76 cases had the minimum value of 0.10), a
regression analysis was not fruitful. Like the expansion coefficients, the prevailing values are
significantly lower than the standard recommended values.
Vertical-Abutment Cases
For these data there was no major effect on the transition lengths or the coefficients due to the
use of vertical rather than spill-through abutments. The exceptions to this statement were
three vertical-abutment cases in the narrow-opening class for which square corners were used.
The square-cornered abutments were a deliberate attempt to model a very severe situation.
Because the RMA-2 program, or any two-dimensional numerical model for that matter, is not
well-formulated to handle such drastic boundary conditions, no general conclusions should be
drawn from these cases about actual field sites having such a configuration.
B-5
Appendix B Flow Transitions in Bridge Backwater Analysis
In applying these recommendations, the modeler should always consider the range of hydraulic
and geometric conditions included in the data. Wherever possible, the transition reach lengths
used in the model should be validated by field observations of the site in question, preferably
under conditions of high discharge. The evaluation of contraction and expansion coefficients
should ideally be substantiated by site-specific calibration data, such as stage-discharge
measurements just upstream of the bridge. The following recommendations are given in
recognition of the fact that site-specific field information is often unavailable or very expensive
to obtain.
B-6
Appendix B Flow Transitions in Bridge Backwater Analysis
The ranges in Table B-2, as well as the ranges of other parameters to be presented later in this
appendix, capture the ranges of the idealized model data from this study. Another way of
establishing reasonable ranges would be to compute statistical confidence limits (such as 95%
confidence limits) for the regression equations. Confidence limits in multiple linear regression
equations have a different value for every combination of values of the independent variables
(Haan, 1977). The computation of these limits entails much more work and has a more
restricted range of applicability than the corresponding limits for a regression, which is based on
only one independent variable. The confidence limits were, therefore, not computed in this
study.
Extrapolation of expansion ratios for constriction ratios, slopes or roughness ratios outside of
the ranges used in this table should be done with care. The expansion ratio should not exceed
4:1, nor should it be less than 0.5:1 unless there is site-specific field information to substantiate
such values. The ratio of overbank roughness to main-channel roughness provides information
about the relative conveyances of the overbank and main channel. The user should note that in
the data used to develop these recommendations, all cases had a main-channel n value of 0.04.
For significantly higher or lower main-channel n values, the n value ratios will have a different
meaning with respect to overbank roughness. It is impossible to determine from the data of this
study whether this would introduce significant error in the use of these recommendations.
When modeling situations which are similar to those used in the regression analysis (floodplain
widths near 1000 feet; bridge openings between 100 and 500 feet wide; flows ranging from
5000 to 30000 cfs; and slopes between one and ten feet per mile), the regression equation for
the expansion reach length can be used with confidence. The equation developed for the
expansion reach length is as follows:
F
Le = − 298 + 257 c 2 + 0.918 L obs + 0.00479 Q
Fc1 (B-1)
When the width of the floodplain and the discharge are smaller than those of the regression
data (1000 ft wide floodplain and 5000 cfs discharge), the expansion ratio can be estimated by
B-7
Appendix B Flow Transitions in Bridge Backwater Analysis
Equation B-2. The computed value should be checked against ranges in Table B-1. Equation B-2
is:
Le F
ER = = 0.421 + 0.485 c 2 + 0.000018 Q (B-2)
L obs Fc1
When the scale of the floodplain is significantly larger than that of the data, particularly when
the discharge is much higher than 30,000 cfs, Equations B-1 and B-2 will overestimate the
expansion reach length. Equation B-3 should be used in such cases, but again the resulting value
should be checked against the ranges given in Table B-1:
Le F
ER = = 0.489 + 0.608 c 2
L obs Fc1 (B-3)
The depth at Section 2 is dependent upon the expansion reach length, and the Froude number
at the same section is a function of the depth. This means that an iterative process is required
to use the three equations above, as well as the equations presented later in this chapter for
contraction reach lengths and expansion coefficients. It is recommended that the user start
with an expansion ratio from Table B-1, locate Section 1 according to that expansion ratio, set
the main channel and overbank reach lengths as appropriate, and limit the effective flow area at
Section 2 to the approximate bridge opening width. The program should then be run and the
main channel Froude numbers at Sections 2 and 1 read from the model output. Use these
Froude number values to determine a new expansion length from the appropriate equation,
move Section 1 as appropriate and recompute. Unless the geometry is changing rapidly in the
vicinity of Section 1, no more than two iterations after the initial run should be required.
When the expansion ratio is large, say greater than 3:1, the resulting reach length may be so
long as to require intermediate cross sections, which reflect the changing width of the effective
flow area. These intermediate sections are necessary to reduce the reach lengths when they
would otherwise be too long for the linear approximation of energy loss that is incorporated in
the standard step method. These interpolated sections are easy to create in the HEC-RAS
program, because it has a graphical cross section interpolation feature. The importance of
interpolated sections in a given reach can be tested by first inserting one interpolated section
and seeing the effect on the results. If the effect is significant, the subreaches should be
subdivided into smaller units until the effect of further subdivision is inconsequential.
When the conditions are within or near those of the data, the contraction reach length
regression equation (Equation B-4) may be used with confidence:
2 0.5
F Q n
Lc = 263 + 38.8 c 2 + 257 ob − 58.7 ob + 0.161 L obs
Fc1 Q nc (B-4)
Where: _Lobs = average length of obstruction as described earlier in this chapter, in feet
Qob = the discharge conveyed by the two overbanks, in cfs, at the approach section
(Section 4)
nob = the average Manning n value for the overbanks at Section 4, and
In cases where the floodplain scale and discharge are significantly larger or smaller than those
that were used in developing the regression formulae, Equation B-4 should not be used. The
recommended approach for estimating the contraction ratio at this time is to compute a value
from Equation B-5 and check it against the values in Table B-3:
2 0. 5
F Q nob
CR = 1.4 − 0.333 c 2 + 1.86 ob − 0.19 n
Fc1 Q c (B-5)
B-9
Appendix B Flow Transitions in Bridge Backwater Analysis
As with the expansion reach lengths, the modeler must use Equations B-4 and B-5 and the
values from Table B-2 with extreme caution when the prototype is outside of the range of data
used in this study. The contraction ratio should not exceed 2.5:1 nor should it be less than 0.3:1.
Expansion Coefficients
The analysis of the data with regard to the expansion coefficients did not yield a regression
equation, which fit the data well. Equation B-6 was the best equation obtained for predicting
the value of this coefficient:
D F
C e = − 0.09 + 0.570 ob + 0.075 c 2
Dc Fc1 (B-6)
Where: Dob = hydraulic depth (flow area divided by top width) for the overbank
at the fully- expanded flow section (Section 1), in feet, and
It is recommended that the modeler use Equation B-6 to find an initial value, then perform a
sensitivity analysis using values of the coefficient that are 0.2 higher and 0.2 lower than the
value from Equation B-6. The plus or minus 0.2 range defines the 95% confidence band for
Equation B-6 as a predictor within the domain of the regression data. If the difference in results
between the two ends of this range is substantial, then the conservative value should be used.
The expansion coefficient should not be higher than 0.80.
Contraction Coefficients
The data of this study did not lend itself to regression of the contraction coefficient values. For
nearly all of the cases the value that was determined was 0.1, which was considered to be the
minimum acceptable value. The following table presents recommended ranges of the
contraction coefficient for various degrees of constriction, for use in the absence of calibration
information.
B-10
Appendix B Flow Transitions in Bridge Backwater Analysis
B-11
Appendix C Computational Difference Between HEC-RAS and HEC-2
APPENDIX C
n n n n
1 2 ch 3
A1 A2
P2 A3 P A P A P A5 P A6 P A P A8
P
1
3 4 4 ch ch 5 6 7 7
P
8
K =K +K +K +K K =K +K +K +K
lob 1 2 3 4 rob 5 6 7 8
K ch
C-1
Appendix C Computational Difference Between HEC-RAS and HEC-2
n n2 nch n3
1
A1 P1 A P A P A P
2 2 ch ch 3 3
K lob = K 1 + K K rob = K 3
2
K ch
Difference (feet)
-0.02 -0.01 0.0 0.01 0.02 Total
C-2
Appendix C Computational Difference Between HEC-RAS and HEC-2
The results from these comparisons do not show which method is more accurate, they only
show differences. In general, it is felt that the HEC-RAS default method is more commensurate
with the Manning equation and the concept of separate flow elements. The default method in
HEC-RAS is also more consistent, in that the computed conveyance is based on the geometry,
and not on how many points are used in the cross section. Further research, with observed
water surface profiles, will be needed to make any final conclusions about the accuracy of the
two methods.
(1) The supercritical flow regime has been specified by the user.
(2) The calculation of critical depth has been requested by the user.
(3) The current cross section is an external boundary cross section and critical depth must
be determined to ensure the user-entered boundary condition is in the correct flow
regime.
(4) The Froude number check for a subcritical profile indicates that critical depth needs to
be determined to verify the flow regime of the computed water surface elevation.
(5) The program could not balance the energy equation within the specified tolerance
before reaching the maximum number of iterations.
The HEC-RAS program has two methods for calculating critical depth: a "parabolic" method and
a "secant" method. The HEC-2 program has one method, which is very similar to the HEC-RAS
“parabolic” method. The parabolic method is computationally faster, but it is only able to locate
a single minimum energy. For most cross sections there will only be one minimum on the total
energy curve; therefore, the parabolic method has been set as the default method for HEC-RAS
(the default method can be changed from the user interface). If the parabolic method is tried
C-3
Appendix C Computational Difference Between HEC-RAS and HEC-2
and it does not converge, then the HEC-RAS program will automatically try the secant method.
The HEC-RAS version of the parabolic method calculates critical depth to a numerical accuracy of
0.01 feet, while HEC-2's version of the parabolic method calculates critical depth to a numerical
accuracy of 2.5 percent of the flow depth. This, in its self, can lead to small differences in the
calculation of critical depth between the two programs.
In certain situations it is possible to have more than one minimum on the total energy curve.
Multiple minimums are often associated with cross sections that have breaks in the total energy
curve. These breaks can occur due to very wide and flat overbanks, as well as cross sections
with levees and ineffective flow areas. When the parabolic method is used on a cross section
that has multiple minimums on the total energy curve, the method will converge on the first
minimum that it locates. This approach can lead to incorrect estimates of critical depth, in that
the returned value for critical depth may be the top of a levee or an ineffective flow elevation.
When this occurs in the HEC-RAS program, the software automatically switches to the secant
method. The HEC-RAS secant method is capable of finding up to three minimums on the energy
versus depth curve. Whenever more than one minimum energy is found, the program selects
the lowest valid minimum energy (a minimum energy at the top of a levee or ineffective flow
elevation is not considered a valid critical depth solution).
Given that HEC-RAS has the capability to find multiple critical depths, and detect possible invalid
answers, the final critical depth solutions between HEC-2 and HEC-RAS could be quite different.
In general the critical depth answer from the HEC-RAS program will always be more accurate
than HEC-2.
The HEC-2 program requires the user to use one of two possible methods, the special bridge
routine or the normal bridge routine. The data requirements for the two methods are different,
and therefore the user must decide a prior which method to use.
Differences between the HEC-2 and HEC-RAS bridge routines will be addressed by discussing the
two HEC-2 bridge methodologies separately.
C-4
Appendix C Computational Difference Between HEC-RAS and HEC-2
1. The HEC-2 special bridge routines use a trapezoidal approximation for
low flow calculations (Yarnell equation and class B flow check with the
momentum equation). The HEC-RAS program uses the actual bridge
opening geometry for all of the low flow methodologies.
2. Also for low flow, the HEC-2 program uses a single pier (of equivalent
width to the sum total width of all piers) placed in the middle of the
trapezoid. In the HEC-RAS software, all of the piers are defined
separately, and the hydraulic computations are performed by evaluating
the water surface and impact on each pier individually. While this is
more data for the user to enter, the results are much more physically
based.
3. For pressure flow calculations, HEC-2 requires the net flow area of the
bridge opening. The HEC-RAS software calculates the area of the bridge
opening from the bridge and cross section geometry. Because of the
potential error involved in calculating the bridge opening area by hand,
differences between the programs may occur for pressure flow
calculations.
4. The HEC-RAS software has two equations that can be used for pressure
flow. The first equation is for a fully submerged condition (i.e. when
both the upstream side and downstream side of the bridge is
submerged). The fully submerged equation is also used in HEC-2. A
second equation is available in HEC-RAS, which is automatically applied
when only the upstream side of the bridge is submerged. This equation
computes pressure flow as if the bridge opening were acting as a sluice
gate. The HEC-2 program only has the fully submerged pressure flow
equation. Therefore, when only the upstream side of the bridge is
submerged, the two programs will compute different answers for
pressure flow because they will be using different equations.
5. When using the HEC-2 special bridge routines, it is not necessary for the
user to specify low chord information in the bridge table (BT data). The
bridge table information is only used for weir flow in HEC-2. When HEC-
2 special bridge data is imported into HEC-RAS, the user must enter the
low chord information in order to define the bridge opening. This is due
to the fact that the trapezoidal approximation used in HEC-2 is not used
in HEC-RAS, and therefore the opening must be completely defined.
2. The HEC-2 Normal bridge method utilizes six cross sections. HEC-RAS
uses only four cross sections in the vicinity of the bridge. The two cross
sections inside the bridge are automatically formulated from the cross
sections outside the bridge and the bridge geometry. In general, it is
common for HEC-2 users to repeat cross sections through the bridge
opening (i.e. the cross sections used inside the bridge were a repeat of
the downstream section). If however, the HEC-2 user entered
completely different cross sections inside the bridge than outside, the
HEC-RAS software will add two additional cross sections just outside of
the bridge, in order to get the correct geometry inside of the bridge.
This however gives the HEC-RAS data set two more cross-sections than
the original HEC-2 data set. The two cross sections are placed at zero
distance from the bridge, but could still cause some additional losses
due to contraction and expansion of flow. The user may want to make
some adjustments to the data when this happens.
3. In HEC-2 the stationing of the bridge table (BT Records) had to match
stations on the ground (GR data). This is not required in HEC-RAS. The
stationing of the data that makes up a bridge (ground, deck/roadway,
piers, and abutments) does not have to match in any way, HEC-RAS will
interpolate any points that it needs.
C-6
Appendix C Computational Difference Between HEC-RAS and HEC-2
1. HEC-2 can only perform culvert calculations for box and circular culvert
shapes. HEC-RAS can handle the following shapes: box; circular pipe;
semi-circle; arch; pipe arch, vertical ellipse; horizontal ellipse; low
profile arch; high profile arch; and ConSpan.
2. HEC-RAS also has the ability to mix the culvert shapes, sizes, and all
other parameters at any single culvert crossing. In HEC-2 the user is
limited to the same shape and size barrels.
3. HEC-RAS has the ability to use two roughness coefficients inside the
culvert barrel (one for the top and sides, and one for the bottom). This
allows for better modeling of culverts that have a natural bottom, or
culverts that were designed for fish passage.
C-7
Appendix C Computational Difference Between HEC-RAS and HEC-2
surface (HEC-2 method 5); a change in energy (HEC-2 method 6); or
both parameters at the same time (new feature).
C-8
Appendix C Computational Difference Between HEC-RAS and HEC-2
6. HEC-RAS has the following new cross section properties not found in
HEC-2: blocked ineffective flow areas; normal ineffective flow areas can
be located at any station (in HEC-2 they are limited to the main channel
bank stations); blocked obstructions; and specification of levees.
7. In HEC-RAS the user can enter up to 500 points in a cross section. HEC-2
has a limit of 100.
C-9
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
APPENDIX D
Schneider et al. (USGS, 1977) tabulated average streamline lengths for various approach section
locations and various degrees of constriction. These results are not directly applicable in this
model because they are derived for symmetric constrictions in channel reaches having uniform,
homogeneous flow conveyance characteristics. Even if the exact-solution algorithms were
developed for non-symmetric, non-homogeneous conditions, the computer resource
requirements for an exact solution are too great to warrant inclusion in the model. Therefore, a
simplified computational technique was developed and incorporated into the model to compute
average streamline length.
Schneider et al., defined the optimum location of the approach section as:
b
Lopt = φ (D-1)
π (1 − m′)
Where Lopt is the distance, in ft, between the approach section and the upstream face of the
bridge opening, b is the bridge-opening width, and m' is the geometric contraction ratio
computed by:
D-1
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
b
m′ = 1 − (D-2)
B
Where B is the top width, in ft, of the approach section flow area. The Φ term in equation D-1 is
computed by:
1 8 3 1 1
φ= ln 2 + 8 − − ε 8 + 8ε 2 − 3ε − − ln ε − (D-3)
2 ε ε ε ε
ε = 1 + δ + δ 2 + 2δ (D-4)
2
δ = (D-5)
b
tan 2 1 − π
2 B
Lopt is located in a zone of nearly one-dimensional flow, thus satisfying the basic requirements of
the one-dimensional energy equation.
The simplified computational technique varies depending upon the relative magnitudes of Lopt
and b. To introduce the technique, discussion is limited to the ideal situation of a symmetric
constriction with uniform, homogeneous conveyance. For such conditions only one-half of the
valley cross-section is required. This one-half section is divided into ten equal conveyance
stream tubes between edge of water and the centerline at both the Lopt location and the
upstream face of the bridge. Equal-conveyance stream tubes are equivalent to equal-flow
stream tubes for one-dimensional flow. Figure D-1 illustrates a case with a small geometric
contraction ratio. Lopt is less than b for lesser degrees of constriction. Since Lopt is located in a
zone of nearly one-dimensional flow, the streamlines are essentially parallel between the
approach section and the Lopt location. Between Lopt and the bridge opening the
corresponding flow division points are connected with straight lines. The effective flow length
used by the model is the average length of the ten equal-flow stream tubes computed by:
D-2
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-1 Definition sketch of assumed streamlines for relatively low degree of contraction.
D-3
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
1 10 (S + S11 )
Lav = ∑
10 i = 2
Si + 1
2
(D-5)
Where i indicates the streamline number and s is the individual streamline length. Although the
straight-line pattern is a gross simplification of the actual curvilinear streamlines, the computed
Lav values are less than 2 percent smaller than the exact solution for small geometric
contraction ratios.
Figure D-2 illustrates a relatively high degree of geometric contraction. Simply connecting the
flow division points of the Lopt and bridge sections does not result in representative lengths for
those streamlines furthest away from the opening.
b
y 2 = 2b x + (D-6)
2
This parabola has its focus at the edge of water and its axis in the plane of the upstream face of
the bridge. Positive x and y distances are measured from the edge of water towards the stream
centerline and upstream from the plane of the bridge, respectively. For portions of the section
where Lopt is upstream from this parabola, the parallel streamlines are projected to the
parabola and then a straight line connects this projected point with the corresponding flow
division point in the bridge opening. Flow division points of the Lopt section at or downstream
from the parabola are connected directly to their corresponding flow division point for the
bridge opening. Only the distances between the approach and the cross section just upstream
of the bridge opening are used to compute Lav with equation D-5. This process generally
produces results that are within 5 percent of the exact solution. For very severe constrictions
(i.e., m' = 0.95), the differences are closer to 10 percent.
The non-uniform conveyance distribution in the approach reach is represented by defining the
stream tubes on a conveyance basis. The model determines the horizontal stationing of 19
interior flow division points that subdivide both the Lopt and bridge sections into 20 tubes of
equal conveyance. Asymmetric constrictions with nonuniform conveyances are analyzed by
treating each half of the reach on either side of the conveyance midpoints separately, then
averaging the results. Lav for each side provides the conveyance-weighted average streamline
length. Figure D-3 illustrates a typical asymmetric, nonuniform conveyance situation.
D-4
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-2 Definition sketch of assumed streamlines for relatively high degrees of
contraction.
D-5
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
D-6
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Coefficient of Discharge
The coefficient of discharge, as defined by Matthai and used in this model, is a function of
bridge geometry and flow characteristics. Matthai's report presents detailed instructions for
computing the coefficient of discharge for the four most common types of bridge openings. It is
not practical to reproduce that entire report herein, but the following paragraphs summarize
the procedures as adapted to this model. All of the key figures from Matthai's report, the
tabular values and equations used to determine the coefficient of discharge, and a discussion of
the minor modifications made to Matthai's procedures are presented in this appendix. Bridge
openings are classified as one of four different types depending upon characteristics of
embankment and abutment geometry. Regardless of opening type, the first step is to
determine a base coefficient of discharge, C', which is a function of (1) a channel contraction
ratio and (2) a ratio of flow length through the bridge, L, to the bridge-opening width, b. The
channel contraction ratio is
Kq
m = 1− (D-7)
K1
Where Kq is the conveyance of a portion of the approach section (based on projecting the bridge
opening width up to the approach section) and K1 is the total conveyance of the approach
section. The definition of the L and b terms for the length ratio depends upon the opening type.
The definition sketches below define these terms for each opening type. The final coefficient of
discharge, C, is computed by multiplying C' by a series of adjustment factors to account for
variations in geometry and flow from the base conditions used to derive C'. The number of
parameters for which adjustment factors are required depends partially upon the opening type.
Following is a summary description of the opening types and the adjustment factors that are
unique to each:
● Type 1 openings have vertical embankments and vertical abutments with or without
wingwalls. The discharge coefficient is adjusted for the Froude number (kF) and also for
wingwall width (kw) if wingwalls are present or for entrance rounding (kr) if there are no
wingwalls.
● Type 2 openings have sloping embankments and vertical abutments and do not have
wingwalls. The discharge coefficient is adjusted on the basis of the average depth of flow at the
abutments (ky).
● Type 4 openings have sloping embankments, vertical abutments, and wingwalls. The
discharge coefficient is adjusted depending upon the wingwall angle (kθ).
D-7
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
In addition to the above adjustment factors, which are dependent upon opening type, there are
adjustment factors for piers or piles (kj) and spur dikes (ka, kb, kd) that may be applied to all
opening types. The relationships used to compute all of the above adjustment factors are shown
below.
Figures D-4 through D-7 are definition sketches of the four types of openings for which Matthai
defined the coefficient of discharge. Figures D-8 through D-18 are the relationships defining the
base coefficient of discharge and the factors used to adjust for nonstandard conditions. Except
for type 1 openings, different curves are required for different embankment slopes. Most of
these relationships are incorporated into HEC-RAS in the form of digitized values. The digitized
values are shown in tabular form at the end of this appendix. Table D-1 cross-references the
figures and tables pertaining to the base coefficient of discharge. Table D-2 cross-references
those figures and tables pertaining to the various adjustment factors.
Generally each of the relationships are incorporated into HEC-RAS in the form of three arrays.
Two one-dimensional arrays contain values of the two independent variables (the abscissa of
the relationship and the family of curves), and a two-dimensional array contains the
corresponding values of the dependent variable. Exceptions to this form of representation are
discussed in the following paragraphs.
The type 1 opening Froude number adjustment (fig. D.8(b)) is adequately expressed in equation
form as:
and
Where F is the Froude number with an arbitrary upper limit of F = 1.2 for the adjustment. The
average depth adjustment for a type 3 opening with 2 to 1 embankment slope is determined by
the following equations:
and
y a + yb
where y = with y = 0.30 as an upper Limit.
2b
The type 4 opening wing wall adjustment factor, kθ, is computed using slopes of the family of
curves (figs. D.15 and D.16). The equation for specified m-values is:
D-8
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Where WW is the wing wall angle and Skθ is the appropriate slope from tables D.16 or D.18. kθ
is obtained by interpolation for intermediate m-values.
Certain adjustments presented by Matthai were not incorporated into the WSPR0 bridge
methodology. The skew adjustment was omitted because WSPR0 always computes the flow
area normal to the flow for skewed bridge openings. An adjustment for submerged flow was
also omitted because the FHWA methodology is used to compute pressure flow when girders
are significantly submerged. The Froude number adjustment for type 4 openings with 2 to 1
embankment slope was intentionally omitted for reasons of consistency. There is no similar
adjustment for type 4 openings with 1 to 1 embankment slopes, and the adjustment is rather
minor. Matthai also applied an adjustment for eccentricity, which is a measure of unequal
conveyances on left and right overbanks of the approach section. This factor was not included in
WSPR0 on the bases that (1) it is a very minor adjustment, and (2) the effective flow length
accounts for conveyance distribution.
D-9
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-4 Definition sketch of type 2 opening, sloping embankments without wing
walls (after Matthai)
D-10
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-5 Definition sketch of type 2 opening, sloping embankments without wing
walls (after Matthai)
D-11
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-6 Definition sketch of type 3 opening, sloping embankments and sloping
abutments (spill through) (after Matthai)
D-12
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-7 Definition sketch of type 4 opening, sloping embankments and vertical
abutments with wing walls (after Matthai)
D-13
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-1 Cross-reference of Figures and Tables pertaining to the base coefficient of discharge.
1 to 1 D-10 D-6
2
2 to 1 D-11 D-8
1 to 1 D-12 D-10
3 1 2 to 1 D-13 D-12
2 to 1 D-14 D-14
1 to 1 D-15 D-15
4
2 to 1 D-16 D-17
D-14
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
D-15
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-9 Wingwall adjustment factors for type 1 openings (after Matthai).
D-16
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
D-17
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-11 Coefficients for type 2 openings, embankment slope 2 to 1 (after Matthai).
D-18
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
D-19
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
D-20
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-13 Coefficients for type 3 openings, embankment slope 1-1/2 to 1 (after
Matthai).
D-21
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
D-22
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
D-23
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-17 Adjustment factors for piers or piles, all opening types (after Matthai)
D-24
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Figure D-18 Adjustment factors for spur dikes, all opening types (after Matthai)
D-25
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-3 Base coefficient of discharge, C’, for type 1 opening, with or without wing walls
Table D-4 Variation of adjustment factor, kr, for type 1 opening with entrance rounding
r/b
D-26
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-5 Variation of adjustment factor, k0, for type 1 opening with wing walls (fig. D-9).
w/b
D-27
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-6 Base coefficient of discharge, C’, for type 2 opening, embankment slope 1 to 1
m
0.0 0.1 0.3 0.5 0.8 1.0
0.0 1.00 0.92 0.845 0.805 0.755 0.745
0.2 1.00 0.955 0.88 0.83 0.775 0.765
0.4 1.00 0.97 0.91 0.85 0.795 0.79
L/b 0.6 1.00 0.975 0.925 0.87 0.81 0.805
0.8 1.00 0.98 0.94 0.895 0.835 0.825
1.0 1.00 0.985 0.95 0.91 0.855 0.845
1.5 1.00 0.988 0.96 0.93 0.885 0.88
2.0 1.00 0.99 0.965 0.94 0.905 0.90
m is the channel contraction ratio.
Table D-7 Variation of adjustment factor, ky, for type 2 opening, embankment slope
1 to 1
(ya + yb)/2b is the ratio of average depth at the abutments to bridge-opening width.
D-28
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-8 Base coefficient of discharge, C’, for type 2 opening, embankment slope 2 to 1
Table D-9 Variation of adjustment factor, ky, for type 2 opening, embankment slope 2 to 1
(ya + yb)/2b is the ratio of average depth at the abutments to bridge-opening width.
D-29
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-10 Base coefficient of discharge, C’, for type 3 opening, embankment slope1 to 1
Table D-11 Variation of adjustment factor, ky, for type 3 opening, embankment slope 1 to 1.
(see fig. D-12).
x/b
0.00 0.08 0.12 0.16 0.20 0.25
0.0 1.00 1.09 1.13 1.14 1.14 1.14
L/b 0.2 1.00 1.11 1.155 1.16 1.16 1.16
0.5 1.00 1.135 1.19 1.20 1.20 1.20
x/b is the ratio of "unwetted" abutment length to bridge-opening width.
D-30
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-12 Base coefficient of discharge, C’, for type 3 opening, embankment slope 1-1/2 to 1
Table D- 13 Variation of adjustment factor, kx, for type 3 opening, embankment slope 1-1/2 to 1
D-31
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-14 Base coefficient of discharge, C’, for type 3 opening, embankment slope 2 to 1
Table D- 15 Base coefficient of discharge, C’, for type 4 opening, embankment slope 1 to 1
D-32
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
m
Skθ
0.1 0.00057
0.2 0.001
0.4 0.002
0.6 0.00343
0.8 0.00413
1.0 0.00483
Table D- 16 Slopes of family of curves for determining adjustment factor, k0, for wing wall
Table D-17 Base coefficient of discharge, C’, for type 4 opening, embankment slope 2 to 1
m
0.0 0.1 0.3 0.5 0.8 1.0
0.0 1.00 0.93 0.80 0.705 0.67 0.67
0.2 1.00 0.95 0.855 0.765 0.725 0.725
0.4 1.00 0.97 0.895 0.815 0.78 0.78
L/b 0.6 1.00 0.985 0.925 0.845 0.805 0.805
0.8 1.00 0.99 0.94 0.87 0.825 0.825
1.0 1.00 0.995 0.95 0.89 0.85 0.85
1.5 1.00 0.995 0.965 0.91 0.88 0.88
2.0 1.00 1.00 0.97 0.925 0.89 0.89
D-33
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-18 Slopes of family of curves for determining adjustment factor, k0, for wing wall
m
Skθ
0.1 0.00243
0.2 0.00283
0.4 0.00373
0.6 0.00467
0.8 0.00557
1.0 0.00667
D-34
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Table D-20 Adjustment factor, kj, for piles (see fig. 17).
j
0.00 0.04 0.08 0.12 0.16 0.20
.76 1.00 0.902 0.81 0.71 0.615 0.52
k j for .80 1.00 0.92 0.841 0.761 0.684 0.605
j=.1 .90 1.00 0.961 0.921 0.88 0.842 0.802
1.0 1.00 1.00 1.00 1.00 1.00 1.00
D-35
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
Ld/b
0.0 0.2 0.4 0.6 1.0 1.5
Ld/b
0.0 0.2 0.4 0.6 1.0 1.5
Ld/b
0.0 0.2 0.4 0.6 1.0 1.5
0.2 1.00 1.09 1.18 1.25 1.27 1.27
m 0.4 1.00 1.08 1.16 1.22 1.24 1.24
0.6 1.00 1.07 1.14 1.18 1.21 1.21
0.8 1.00 1.06 1.12 1.16 1.18 1.18
Ld/b_d
0.0 0.5 1.0 1.5 2.0 2.8
D-36
Appendix D Computational of the WSPRO Discharge Coefficient and Effective Flow Length
0.6 1.00 0.94 0.94 1.00 1.05 1.00
0.8 1.00 0.89 0.88 0.945 1.01 1.00
Table D-21 Adjustment factors for spur dikes (see fig. D-18).
D-37
Appendix E Sediment Transport Functions-Sample Calculations
APPENDIX E
Constants
Acceleration of gravity, ft/s2 g = 32.2
Solution
*note: Ackers-White required the use of d35 as the representative grain size for
computations in their original paper. In the HEC-RAS approach, the median grain size
will be used as per the 1993 update. The overall d50 is used for the hiding factor
computations.
Hiding Factor from Profitt and Sutherland has been added for this procedure, but will be
included as an option in HEC-RAS.
Computations are updated as per Acker's correction in Institution of Civil Engineers
Water Maritime and Energy, Dec 1993.
E-1
Appendix E Sediment Transport Functions-Sample Calculations
1
d gr = d si g ⋅ (s − 1) 3
ν2
d gr = 15.655
Shear velocity u
1 if d gr ≤ 1
n = (1 − .056 ⋅ log(d gr )) if 1 < d gr ≤ 60 n = 0.331
0 if d gr > 60
0.23
+ 0 . 14 if d ≤ 60
A = d gr gr
A = 0.198
0.17 otherwise
1− n
u star
n
V
Fgr = ⋅ Fgr = 0.422
g ⋅ d si ⋅ (s − 1) D
32 ⋅ log α ⋅ d
si
2
u star
θ= θ = 2.612
g ⋅ (s − 1)d 50
E-2
Appendix E Sediment Transport Functions-Sample Calculations
1.1 if θ ≤ 0.04
(2.3 − 30 ⋅ θ ) if 0.04 < θ ≤ 0.045
dRatio = dRatio = 0.45
(1.4 − 10 ⋅ θ ) if 0.045 < θ ≤ 0.095
0.45 otherwise
d si
HFRatio = HFRatio = 2.222
dAdjust
Fgr
Check = Check = 2.522
A
6.83 + 1.67 if d gr ≤ 60
m = d gr m = 2.106
1.78 otherwise
0 if m > 6
Check = Check = 2.522
Check otherwise
E-3
Appendix E Sediment Transport Functions-Sample Calculations
( ) ( ( ))
2.79⋅log d gr − 0.98 log d gr 2 −3.46
if d gr ≤ 60
C=
10 C = 0.0298
0.025 otherwise
m
Fgr
G gr = C ⋅ − 1 G gr = 0.072
A
G gr sd si
X = n X = 6.741 x 10-5
u
D star
V
G = γ wQX G = 21.027
Gs =
86400
⋅G Gs = 908
2000
Check to make sure particle diameter and mobility functions are not too low,
if Check > 1
Gs =
Gs
Gs = 908
0 otherwise
E-4
Appendix E Sediment Transport Functions-Sample Calculations
Input Parameters
Slope S = 0.0001
Solution
Bed level shear stress
o,
τ = γ w ⋅ D ⋅ S τ = 0.143
df =
(− 69.07 ⋅ dsi + 1.0755 ⋅ d si + 0.000007
2
) if d si ≤ 0.00591
d f = 2.13 × 10 −3
(0.1086 ⋅ dsi )
0.6462
otherwise
E-5
Appendix E Sediment Transport Functions-Sample Calculations
Sediment discharge lb/s,
3
τ 2
g s = 0.05 ⋅ γ w ⋅ s ⋅ V 2 ⋅
df
⋅ ⋅B g s = 32.82
g ⋅ (s − 1) (γ w ⋅ s − γ w ) ⋅ d f
Gs = gs ⋅
86400
Gs = 1418
2000
E-6
Appendix E Sediment Transport Functions-Sample Calculations
Input Parameters
Temperature, F T = 55 Average Velocity, ft/s V = 5.46
γ w = 62.385
Constants
Acceleration of gravity, ft/s2 g = 32.2
Solution
*Note: the difference between the final result presented here and the result in SAM is
due to
the method for determining fall velocity. Rubey is used here, whereas SAM
computes a
value based on a drag coefficient determined from Reynolds number. Calculation
routine taken from SAM.
Because the grain distribution is reduced to standard grade sizes representing each
present
grade class, the d84 will equal the standard grade size, dsi, in this procedure.
d 84 = d si
E-7
Appendix E Sediment Transport Functions-Sample Calculations
3
1
0.0472 ⋅ V 2 ⋅ (3.5 ⋅ d 84 ) 4
R' = 3
R' = 14.189
(g ⋅ S) 4
R’ = 15.248
FNRP = 5.195 × 10 −4
E-8
Appendix E Sediment Transport Functions-Sample Calculations
V + 5 ⋅ u*'
DFNRP = DFNRP = 0.972
2.0 ⋅ u*' ⋅ R'
FNRP
RPRI 2 = R '+ RPRI 2 = 15.249
DFNRP
R' if ∆R ≤ 0.001
R' =
RPRI 2 otherwise
R ' = 15.248
τb = D ⋅γ w ⋅ S τ b = 0.143
1.16667
d
RRP = si RRP = 2.187 × 10 −5
R
E-9
Appendix E Sediment Transport Functions-Sample Calculations
∗
Dimensionless bed shear stress τ b ,
τ 'b
τ b* =
γ w ⋅ (s − 1) ⋅ d si
τ b* = 0.398
θ * = 0.647 ⋅ τ b* + 0.0064
τ cr =
[θ *
⋅ γ w ⋅ (s − 1) ⋅ d si ] if τ b* ≤ 0.05
τ cr = 9.315 × 10 −3
[0.039 ⋅ γ w ⋅ (s − 1) ⋅ d si ] otherwise
τ' b
TFP = −1 TFP = 9.214
τ cr
Fall velocity ω ,
E-10
Appendix E Sediment Transport Functions-Sample Calculations
2 36 ⋅ ν 2 36 ⋅ ν 2
F1 = + − F1 = 0.725
3 g ⋅ d si 3 ⋅ (s − 1) g ⋅ d si 3 ⋅ (s − 1)
ω = F1 ⋅ (s − 1) ⋅ g ⋅ d si ω = 0.255
u*'
SF = SF = 0.870
ω
[7.04 ⋅10 15
⋅ (SF )
22.99
]
if SF ≤ 0.225
Ψ = (40.0 ⋅ SF ) if 0.225 < SF ≤ 1.0 Ψ = 34.804
(40 ⋅ SF 1.843
) if SF > 1.0
E-11
Appendix E Sediment Transport Functions-Sample Calculations
Meyer-Peter Muller Sediment Transport Function
by Vanoni (1975), and Schlichting’s Boundary Layer Theory, 1968
Input Parameters
Temperature, F T = 55 Average Velocity, ft/s V = 5.46
Constants
Solution
Shear velocity u,
u* = g ⋅ D ⋅ S u* = 0.272
u* ⋅ d 90 Rs = 63.189
Rs =
ν
Schlichting’s B coefficient, Bcoeff
E-12
Appendix E Sediment Transport Functions-Sample Calculations
2
2.82843
f '= f’ = 9.565 X 10-3
BCoeff − 3.75 + 2.5 ⋅ ln 2 ⋅ D
d
90
f' V
RKR = ⋅ RKR = 0.695
8 g⋅D⋅S
3
2
(RKR )2 ⋅ γ w ⋅ D ⋅ S − 0.047 ⋅ (γ w ⋅ s − γ w ) ⋅ d si
3
gs = 1 2 ⋅B g s = 7.073
γ γ ⋅ s −γw
3 3
0.25 ⋅ w ⋅ w
g γw ⋅s
86400
Gs = gs ⋅ Gs = 306
2000
E-13
Appendix E Sediment Transport Functions-Sample Calculations
Toffaleti Sediment Transport Function
by Vanoni, for single grain size
Input Parameters
Slope, S = 0.0001 Temperature, F T = 55
Constants
Solution
k s = d 65 k s = 2.57 × 10 −3
2
u '*try
r' = r’ = 12.298
g⋅S
E-14
Appendix E Sediment Transport Functions-Sample Calculations
V
u '* =
5.75 ⋅ log12.27 ⋅ r '
k s
Check u '* = 0.199
2
u '*try
r' = r’ = 8.87
g⋅S
11.6 ⋅ v
δ '= δ ' = 9.026 × 10 −4
u '*try
ks ks
Check = Check = 2.847 = 2.847
δ' δ'
V
if Check < 5 Smooth
r '⋅u '*try
u '* = 5.75 ⋅ log 3.67 ⋅
ν
u '* otherwise Rough
E-15
Appendix E Sediment Transport Functions-Sample Calculations
ks
Φ= Φ = 2.847 Φ = 3.416
δ'
V
if 0.1 < Φ < 10
r '⋅x
u '* = 5.75 ⋅ log12.27 ⋅
k s
u '* otherwise
11.6 ⋅ v ks
δ '= Φ= Φ = 3.416
u '* δ'
E-16
Appendix E Sediment Transport Functions-Sample Calculations
u '* = 0.203
****Note: Einstein’s method for determining u’* was compared with Toffaleti’s graphical
approach.
Results showed that the two methods are in acceptable agreement, with differences on
the order
of less than 3%. Einstein’s approach was selected for its established reputation and its
relative
simplicity.
Toffaleti coefficients, A and k4,
(10 ⋅ν )
1
5 3
A factor = Afactor = 0.54
10 ⋅ u '*
(9.5987 ⋅ A factor
−1.5445
) if A factor ≤ 0.5
(39.079 ⋅ A factor
0.481
) if 0.5 < A factor ≤ 0.66
A = (221.85 ⋅ A ) if 0.66 < A factor ≤ 0.72
4.660
factor A = 29.065
48 if 0.72 < A factor ≤ 1.3
(22.594 ⋅ A factor
2.872
) if A factor > 1.3
(10 )
1
⋅ν 3
5
k 4 Factor = ⋅ 105 ⋅ S ⋅ d 65 K4Factor = 0.014
10 ⋅ u '*
Ak 4 = A ⋅ k 4
E-17
Appendix E Sediment Transport Functions-Sample Calculations
16 if Ak 4 〈 16
Ak 4 = Ak4 = 29.065
Ak 4 if Ak 4 ≥ 16
More Coefficients,
wi = 0.340
zi =
wi ⋅V zi = 7.76
cz ⋅ R ⋅S
(1.5 ⋅ nV ) if z i < n V
zi = 7.76
zi =
zi otherwise
g ssLi =
0.600 ⋅ p i
5 5
g ssLi = 6.473
TT ⋅ Ak 4 3 d si 3
⋅
0.00058
2
V
g ssLi
Mi = Mi = 2.948 X 10-10
R 1+ nV −0.756⋅ zi
− (2 ⋅ d si ) V
1+ n −0.756⋅ zi
11.24
1 + nV − 0.756 ⋅ zi
Concentration,
Mi
C Li = CLi = 1.425 X 10-18
43.2 ⋅ pi ⋅ (1 + nV ) ⋅ V ⋅ R 0.756⋅zi −nV
E-18
Appendix E Sediment Transport Functions-Sample Calculations
−0.756⋅ zi
2 ⋅ d si C 2 d = 75.536
C2 d = C Li ⋅
R
C Li if C 2d < 100
100
C Li = −0.756⋅ zi
if C 2d ≥ 100 CLi = 1.425 X 10-18
2 ⋅ d si
R
[
M i = C Li ⋅ 43.2 ⋅ pi ⋅ (1 + nV ) ⋅ V ⋅ R 0.756⋅zi −nV ] Mi = 2.948 X
-10
10
Bed Load Transport,
g sbi = M i ⋅ (2 ⋅ d si )
(1+ nV −0.756 zi )
g sbi = 30.555
Lower Layer Transport,
R
0.244⋅z i R 1+ n V − zi R 1+ n V − z i
⋅ −
11.24 2.5 11.24
g ssMi = M i ⋅ gssMi = 5.674 X
1+ n V − zi
10-1
Upper Layer Transport,
R
0.244⋅z i
R
0.5⋅z i R V
1+ n −1.5⋅z i
⋅ ⋅ R (1+ n V −1.5⋅z i ) −
11.24 2.5 2.5
g ssUi = M i ⋅ gssUi = 1.72 X
1 + n V − 1. 5 ⋅ z i
10-15
Total Transport per Unit Width,
E-19
Appendix E Sediment Transport Functions-Sample Calculations
Yang Sediment Transport Function
by Yang, from ASCE Journal of Hydraulics, Oct 1973, Dec 1984
Input Parameters
Slope, S = 0.0001
u* = g ⋅ R ⋅ S u * = 0.185
2 36 ⋅ν 2 36 ⋅ν 2
F1 = + −
3 g ⋅ d si 3 ⋅ (s − 1) g ⋅ d si ⋅ (s − 1)
3
F1 = 0.725
ω = F1 ⋅ (s − 1) ⋅ g ⋅ d si ω = 0.255
Shear Reynold’s Number,
u* ⋅ d si Rs = 32.717
Rs =
ν
Critical Velocity, ft/s,
E-20
Appendix E Sediment Transport Functions-Sample Calculations
2.5
ω ⋅ + 0.66 if 0 < R s < 70 Vcr = 0.606
Vcr = u ⋅d
log * si − 0.06
ν
(ω ⋅ 2.05) if R s ≥ 70
Log of Concentration,
ω ⋅ d si u
5.435 − 0.286 ⋅ log − 0.457 ⋅ log * ...
ν ω if d si < 0.00656 Sand
ω
⋅ d si u V ⋅ S Vcr ⋅ S
+ 1.799 − 0.409 ⋅ log − 0.314 ⋅ log * ⋅ log −
ν ω ω ω
log C t =
ω ⋅ d si u
6.681 − 0.633 ⋅ log − 4.816 ⋅ log * ...
ν ω
if d si ≥ 0.00656 Gravel
+ 2.784 − 0.305 ⋅ log ω ⋅ d si − 0.282 ⋅ log u * ⋅ log V ⋅ S − Vcr ⋅ S
ν ω
ω ω
log Ct = 1.853
Concentration, ppm
C t = 10 log Ct Ct = 71.284
Sediment Discharge, lb/s
γ w ⋅ Q ⋅ Ct
G= G = 22.235
1000000
E-21