Affidavit - Shiju
Affidavit - Shiju
Hamsakutty Rawther,
Puthenveedu House, Erumeli, Pin:686509, 2) P.H.Shjahan, aged 61 years, s/o
A.B. Hamsakutty Rawther, Puthenveedu House, Erumeli, Pin:686509, 3)
Mohammed Shah, aged 50 years, s/o P.H.Abdul Salam, Puthenveedu House,
Erumeli, Pin:686509, 4) Mohammed Anas, aged 39 years, s/o P.H.Abdul
Salam, Puthenveedu House, Erumeli, Pin:686509, solemnly affirm and declare
the following:
That we intend to construct a building in 1875 Sq. Meters of land in Old Survey
379 and in Re-Survey 67/1-75-6 and 67/1-75-7 in Block No. 27 of Erumeli
South Village of Kanjirapally Taluk, Kottayam District, as per the building
permit and approved plans issued vide Permit Number A4-BA(17635)/2020
dated 17/09/2020 by the Secretary of Erumeli Grama Panchayat to the
construction of said building, the plot has to be levelled by excavation of
2886.11 cubic Meters of ordinary earth from 16.69 Ares of land out of which
2886.11 Cubic Meters of ordinary earth has to be transported outside the
property.
That we will excavate only the quantity mentioned above, and such
excavation work will be carried out in a safe manner without compromising
safety of workers and without causing any damage to public property and in
the event of any accident or causing any damage to the public property on
account of excavation, We ourselves will be responsible for the said act and
shall pay reasonable compensation as may be assessed by any lawful
authority In accordance with the law in force.
That we will construct the building as per the approved building plan and that
the construction of at least the foundation of the building will be completed
within one year of the date of the grant of movement permit for moving
ordinary earth and the same will be intimated to the movement permit issuing
authority.
That in the event of failure to construct at least the foundation of the building
within one year from the date of grant of movement permit, we will pay the
amount demanded by the movement permit issuing authority as per Rule
14(7) of the Kerala Minor Mineral Concessions Rules, 2015.
That in the event of the extraction of ordinary earth more than the quantity
mentioned in the movement permit within or outside the area demarcated for
excavation, we will pay the amount demanded by the movement permit
issuing authority as per Rule 14(8) of the Kerala Minor Mineral Concession
Rules 2015.
We are swearing this affidavit in order to produce before the The District
Geologist, District Office of the Department of Mining and Geology for
obtaining a movement permit for transportation of ordinary earth in
connection with the levelling of plot for construction of building as per the
building permit mentioned above.
We hereby state that whatever is stated herein above is true to the best of our
knowledge, information and belief.
Signature:
Name: 1. P.H.Abdul Salam
2. P.H Shajahan
3. Mohammed Shah
4. Mohammed Anas
Solemnly affirmed and signed before me by the deponents who are personally
known to me at my office at ….on this the ….day of ……2023.