0% found this document useful (0 votes)
98 views

Rebar IPC 1 Agreement 2

This payment certificate provides details of the progress and costs for a construction project. It certifies that the contractor, Hambra P.L.C, is entitled to Birr 101,093.73 for work completed to date. The summary includes the quantity and costs of rebar installed, with a total of 31,690.83 kg of rebar valued at Birr 91,903.39. Retention of 5% is deducted from the amount due, leaving a net payment of Birr 87,308.22 plus VAT of Birr 13,785.51 for a total payment of Birr 101,093.73.

Uploaded by

Abdulfeta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views

Rebar IPC 1 Agreement 2

This payment certificate provides details of the progress and costs for a construction project. It certifies that the contractor, Hambra P.L.C, is entitled to Birr 101,093.73 for work completed to date. The summary includes the quantity and costs of rebar installed, with a total of 31,690.83 kg of rebar valued at Birr 91,903.39. Retention of 5% is deducted from the amount due, leaving a net payment of Birr 87,308.22 plus VAT of Birr 13,785.51 for a total payment of Birr 101,093.73.

Uploaded by

Abdulfeta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

የክፍያ ምስክር ወረቀት 1

PAYMENT CERTIFICATE 1

ሥራው Amount Birr


Project - 4B+G+14 MIXED USE BUILDING ዋናው ውል
ቦታው Main contract 702,180.19
Location - ADDIS ABABA, Atena tera -
የስራ ተቋራጭ Variation works
Contractor - HAMBRA P.L.C ድምር
ንዑስ የስራ ተቋራጭ Sum 702,180.19
Sub-Contractor - Ameneshewa Solomon & friends Small Building Contractors p/s
VAT 15% 105,327.03
ጠቅላላ ድምር
Total sum 807,507.22

አባሪ በሆነው የክፍያ ሰነድ ጥያቄ መሰረት እስከ ዛሬ ድረስ ተቋራጩ የሰራው ሥራና/ያቀረበው ዕቃ

As per the attached statement the value of work executed and/or materials supplied to-date የገንዘቡ ልክ /ብር/
before VAT is Birr 91,903.39 Amount (Birr)
Main Contract 91,903.39
Price adjustment

PREVIOUS PAYMENTS Total 91,903.39


ተቀናሽ
No Date
Before VAT VAT Total Deductions Amount (Birr)
- - 1. አስቀድሞ የተከፈለ
- - Previous payments -
- - 2. መያዣ
- - Retention 5% 4,595.17
3. መቀጫ
Sub-total - - - Penalty
የብረት ግዢ
Rebar Purchase from client
4. የቅድመ ክፍያ
Advance repay (10%)
5. ሌላ
Others
4. የቅድመ ክፍያ
Total 4,595.17
የተጣራ ለተቋራጩ የሚከፈል ገንዘብ
Net Service sum due to the Contractor 87,308.22

VAT Payments
Details Deduction Payables
VAT on Amount of
Work Executed 13,785.51
VAT on Retention -
VAT on Advance
Sub-total - - - Repayment -
VAT on Previous
ADVANCE REPAYMENT payments -
Description Before VAT VAT Total Total Deduction -
Amount of advance taken - -
Advance repaid - - - VAT Payable in this payment 13,785.51
Outstanding adv. - - - Total Payable to the Contractor including
101,093.73
VAT

አባሪ በሆነው የክፍያ ሰነድ ጥያቄ መሰረት እስከ ዛሬ ድረስ ተቋራጩ የሰራው ሥራና/ያቀረበው ዕቃ

We certify that the Contractor is now entitled to the sum of Birr 101,093.73 (One Hundred One Thousand Ninety Three birr and 93/100)
.

ተዘጋጅቷ ል ተረጋግጧል ፀድቋል


Prepared By Certified By Approved By
Project : 4B+G+12 Mixed Use Building
Contractor:-Hambra PLC
Sub-Contractor:Ameneshewa Solomon & friends Small Building Contractors p/s

Total Previous Current Totall


DESCRIPTION OF Conrat Unit Previous Current Total Qty
ITEM Unit Amount Amount amount Amount to-
WORK Qty Price Qty Qty to-date
(Birr) (Birr) (Birr) date (Birr)
A) dia. 6mmplain bar kg -

B) dia.8mm deformed bar kg 2.90 - 9,490.12 9,490.12 - 27,521.36 27,521.36

C) dia.10mm deformed bar


kg 2.90 - 6,596.42 6,596.42 - 19,129.62 19,129.62

D)dia.12mm deformed bar


kg 2.90 - 3,519.08 3,519.08 - 10,205.33 10,205.33

E) dia.14mm deformed bar kg 2.90 - 2,089.86 2,089.86 - 6,060.60 6,060.60

F)dia.16mm deformed bar kg 2.90 - - - - - -

G)dia.20mm deformed bar


kg 2.90 - 9,995.34 9,995.34 - 28,986.48 28,986.48

H)dia.24mm deformed bar


kg 2.90 - - - - - -
TOTAL CARRID TO
SUMMARY……. 31,690.83 31,690.83 - 91,903.39 91,903.39
Project : 4B+G+12 Mixed Used Building
Contractor:-Hambra PLC
Sub-Contractor:Ameneshewa Solomon & friends Small Building Contractors p/s

Sr Dim rebar (Kg)


Description
No. Ф8 Ф10 Ф12 Ф14 Ф16 Ф20 Ф24 Ф32 Total
A.Sub structure
1 Ground floor slab 7,231.67 6,168.69 2,662.34 748.88 16,811.58
2 Ground floor Beam 1,847.68 8,742.32 10,589.99
3 1st Basement-Ground floor stair 288.56 85.52 856.74 221.94 1,452.76
4 Ground floor Enterance stair 93.46 213.24 1,027.87 774.13 2,108.69
5 Addtional work 28.76 128.98 313.11 256.96 727.80
Total (A) 9,490.12 6,596.42 3,519.08 2,089.86 - 9,995.34 - - 31,690.83
Project : 4B+G+14 Mixed Use Appartment
Contractor: Hambra Plc.
Sub-Contractor:Ameneshewa Solomon & friends Small Building Contractors p/s
No of No of Total BAR LENGTH IN METER
It.
location shape Dia Length Bar per Membe No of
no
mem. r Bar Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
Ground floor Slab Mesh
1 Long Span
ON AXIS A'-B, b/n axis 4 - 8 10 7.86 213.00 1 213.00 1674
ON AXIS A-B, b/n axis 1 - 4 8 7.76 99.01 1 99.01 768
ON AXIS A-B, b/n axis 1 - 2 8 10.00 20.00 1 20.00 200
ON AXIS A'-A, b/n axis 3 - 4 8 7.76 20.00 1 20.00 155
ON AXIS B-C, b/n axis 1-3,6-8 8 5.86 188.57 1 188.57 1105
ON AXIS B-C, b/n axis 3-4 8 7.99 51.50 1 51.50 411
ON AXIS B-C, b/n axis 4-5 8 7.76 52.00 1 52.00 404
ON AXIS B-C, b/n axis 5-6 8 8.09 50.50 1 50.50 409
ON AXIS C-D, b/n axis 1-3,6-8 8 6.16 168.57 1 168.57 1038
ON AXIS C-D, b/n axis 1-3,6-8 8 8.16 20.00 1 20.00 163
ON AXIS C-D, b/n axis 3-3',6-6' 8 6.16 10.57 1 10.57 65
ON AXIS D-E, b/n axis 1-2 8 7.99 41.36 1 41.36 330
ON AXIS D-E, b/n axis 2-3 8 5.86 53.00 1 53.00 311
ON AXIS D-E, b/n axis 3-7 8 7.99 154.00 1 154.00 1230
ON AXIS E-G', b/n axis 1-2 8 8.64 48.08 1 48.08 415
ON AXIS E-G', b/n axis 2-3 8 5.74 104.50 1 104.50 600
ON AXIS E-G', b/n axis 3-4 8 13.30 135.00 1 135.00 1796
ON AXIS E-G, b/n axis 4-6 10 5.94 73.79 1 73.79 438
ON AXIS G', b/n axis 3-4 8 7.69 73.79 1 73.79 567
ON AXIS D-G, b/n axis 6-8 10 9.81 78.50 1 78.50 770
NEGATIVE BAR
ON AXIS A & b/n axis 1-4 12 4.25 125.20 1 125.20 532
ON AXIS B & b/n axis 1- 8 10 3.70 319.20 1 319.20 1181
ON AXIS C & b/n axis 1-2 10 3.92 40.20 1 40.20 158
ON AXIS C & b/n axis 1-3,6-8 10 3.85 194.00 1 194.00 747
ON AXIS C & b/n axis 4-5 10 4.03 48.00 1 48.00 193
ON AXIS D, b/n axis 1-6 10 3.85 96.50 1 96.50 372
ON AXIS D, b/n axis 6-7 12 4.40 39.33 1 39.33 173
ON AXIS D, b/n axis 7-8 10 4.40 52.00 1 52.00 229
ON AXIS E, b/n axis 2-5 10 3.60 147.00 1 147.00 529
ON AXIS E, b/n axis 5-6 10 3.05 46.00 1 46.00 140
ON AXIS F, b/n axis 6-8 14 5.10 121.56 1 121.56 619.93
short Span
ON AXIS 1-2, b/n axis A-B 8 5.04 54.00 1 54.00 272
ON AXIS 1-2, b/n axis B- E 8 8.64 165.00 1 165.00 1426
ON AXIS 2-3, b/n axis A-C,D-E 8 5.74 162.00 1 162.00 930
ON AXIS 2-3, b/n axis C- D 10 7.86 22.79 1 22.79 179
ON AXIS 2-3, b/n axis C- D 10 9.68 19.21 1 19.21 186
ON AXIS 2-3, b/n axis E- G' 8 7.86 54.44 1 54.44 428
ON AXIS 3-4, b/n axis A-C,D-G 8 5.61 216.00 1 216.00 1212
ON AXIS 4-5, b/n axis A- C,D-G 8 5.64 199.50 1 199.50 1125
ON AXIS 4-5, b/n axis C-D 8 9.81 17.00 1 17.00 167
ON AXIS 5-6, b/n axis A-C,D-G 8 5.50 189.07 1 189.07 1040
ON AXIS 6-7, b/n axis A-F, F-G 8 5.71 198.57 1 198.57 1134
ON AXIS 6-7, b/n axis A-F, F-G 8 9.84 24.50 1 24.50 241
ON AXIS 6-7, b/n axis A-F, F-G 8 7.59 29.00 1 29.00 220
ON AXIS 7-8, b/n axis A-F 12 8.64 236.50 1 236.50 2043
ON AXIS 7-8, b/n axis F-G 8 8.64 16.83 1 16.83 145
NEGATIVE BAR
ON AXIS 2, b/n axis A'- B 10 2.98 47.50 1 47.50 142
ON AXIS 2, b/n axis B- E 10 3.75 150.00 1 150.00 563
ON AXIS 3, b/n axis A-C,D-G 10 3.65 188.00 1 188.00 686
ON AXIS 4, b/n axis A'-C,D-G 10 3.60 175.50 1 175.50 632
ON AXIS 5, b/n axis A'-C,D-G 10 3.50 171.50 1 171.50 600
ON AXIS 7, b/n axis A'-D,E-F 10 3.90 148.50 1 148.50 579
ON AXIS 7, b/n axis A'-D,E-F 12 3.90 64.00 1 64.00 250

8 2.60 244 1 244.00 634

8 2.50 68.00 1 68.00 170


Distribution bar 8 2.40 607.00 1 607.00 1457

8 2.20 150.00 1 150.00 330

8 1.70 50.00 1 50.00 85


Suddel Bar(Kebeleto) 12 1.40 568.00 1 568.00 795

Total length (m) 18308 9998 2998 620 0 0 0


Linear weight Kg/m 0.395 0.617 0.888 1.208 1.578 2.466 3.551
Total weight(Kg) 7231.67 6168.69 2662.34 748.88 0.00 0.00 0.00
Project : 4B+G+14 Mixed Use Appartment
Contractor: Hambra Plc.
Sub-Contractor:Ameneshewa Solomon & friends Small Building Contractors p/s

No of No of Total No BAR LENGTH IN METER


Bar per Member of Bar
It. no location shape Dia Length mem. Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

Ground floor Beam

1 B1, On axis 1 b/n A-G' 0.00


Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 3.90 2.00 1 2.00 8
Negative Bar 20 2.55 3.00 1 3.00 8
20 3.87 3.00 1 3.00 12
20 3.87 3.00 1 3.00 12
20 3.69 3.00 1 3.00 11
20 3.69 3.00 1 3.00 11
20 2.65 1.00 1 1.00 3
Bottom bar 20 6.30 3.00 1 3.00 19
20 12.00 3.00 1 3.00 36
20 2.55 3.00 1 3.00 8
Stirrups 8 1.40 132.08 1 132.08 185

2 B2, On axis 2 b/n A-G' 0.00


Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 3.85 2.00 1 2.00 8
Negative 20 2.55 3.00 1 3.00 8
20 3.69 3.00 1 3.00 11
20 3.87 3.00 1 3.00 12
20 3.87 3.00 1 3.00 12
20 3.69 3.00 1 3.00 11
20 4.02 5.00 1 5.00 20
Bottom bar 20 11.70 3.00 1 3.00 35

20 12.00 3.00 1 3.00 36


20 6.00 3.00 1 3.00 18
Stirrups 8 1.40 203.00 1 203.00 284

3 B3, On axis 3 b/n A-G' 0.00


Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 3.85 2.00 1 2.00 8
Negative Bar 20 2.55 3.00 1 3.00 8
20 3.69 3.00 1 3.00 11
20 3.87 3.00 1 3.00 12
20 3.87 3.00 1 3.00 12
20 3.69 3.00 1 3.00 11
20 3.02 3.00 1 3.00 9
Bottom bar 20 11.70 3.00 1 3.00 35
20 12.00 3.00 1 3.00 36
20 6.00 3.00 1 3.00 18
Stirrups 8 1.40 186.00 1 186.00 260

4 B4, On axis 4 b/n A-G' 0.00


Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 3.85 2.00 1 2.00 8
Negative Bar 20 2.55 3.00 1 3.00 8
20 3.69 3.00 1 3.00 11
20 3.87 3.00 1 3.00 12
20 3.87 3.00 1 3.00 12
20 3.69 3.00 1 3.00 11
20 2.55 3.00 1 3.00 8
Bottom bar 20 11.70 3.00 1 3.00 35
20 12.00 3.00 1 3.00 36
20 6.00 3.00 1 3.00 18
Stirrups 8 1.40 187.00 1 187.00 262

Stair beam On axis 4 b/n C-D 0.00

Top bar 20 7.45 2.00 1 2.00 15

Negative Bar 20 2.78 3.00 1 3.00 8

20 2.78 3.00 1 3.00 8

Bottom bar 20 6.65 3.00 1 3.00 20

Stirrups 8 1.40 41.00 1 41.00 57


Stair beam FB-1,FB-2 On axis 4-5
b/n C-D 0.00
Top bar 20 3.95 8.00 2 16.00 63

BOTTOM 20 3.15 7.00 2 14.00 44

5
B5, On axis 5 b/n A-G 0.00
Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 11.20 2.00 1 2.00 22
20 3.00 2.00 1 2.00 6
Negative Bar 20 2.55 3.00 1 3.00 8
20 3.69 3.00 1 3.00 11
20 3.87 3.00 1 3.00 12
20 3.87 3.00 1 3.00 12
20 3.14 3.00 1 3.00 9
20 2.00 3.00 1 3.00 6
Bottom bar 20 11.70 3.00 1 3.00 35
20 12.00 3.00 1 3.00 36
20 4.35 3.00 1 3.00 13
Stirrups 8 1.40 173.85 1 173.85 243
Stair beam B5, On axis 5 b/n C-
6
D 0.00
Top bar 20 7.45 2.00 1 2.00 15
Negative Bar 20 2.78 3.00 1 3.00 8
20 2.78 3.00 1 3.00 8
Bottom bar 20 6.65 3.00 1 3.00 20
Stirrups 8 1.40 41.00 1 41.00 57

7 B6, On axis 6 b/n A-G 0.00


Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 11.20 2.00 1 2.00 22
20 3.00 2.00 1 2.00 6
Negative Bar 20 2.55 3.00 1 3.00 8
20 3.69 3.00 1 3.00 11
20 3.87 3.00 1 3.00 12
20 3.87 3.00 1 3.00 12
20 3.14 3.00 1 3.00 9
20 2.47 3.00 1 3.00 7
Bottom bar 20 11.70 3.00 1 3.00 35
20 12.00 3.00 1 3.00 36
20 4.35 3.00 1 3.00 13
Stirrups 8 1.40 173.08 1 173.08 242
8 B7, On axis 7 b/n A-F 0.00
Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 11.10 2.00 1 2.00 22
Negative Bar 20 2.55 3.00 1 3.00 8
20 3.69 3.00 1 3.00 11
20 3.87 3.00 1 3.00 12
20 4.40 5.00 1 5.00 22
20 3.13 5.00 1 5.00 16
Bottom bar 20 11.70 3.00 1 3.00 35
20 6.40 3.00 1 3.00 19
20 7.65 5.00 1 5.00 38
Stirrups 8 1.40 178.92 1 178.92 250
9 B8, On axis 8 b/n A-F 0.00
Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 11.10 2.00 1 2.00 22
Negative Bar 20 2.55 2.00 1 2.00 5
20 3.69 2.00 1 2.00 7
20 3.87 2.00 1 2.00 8
20 4.40 3.00 1 3.00 13
20 3.13 3.00 1 3.00 9
Bottom bar 20 11.70 3.00 1 3.00 35
20 6.40 3.00 1 3.00 19
20 7.65 4.00 1 4.00 31
Stirrups 8 1.40 181.85 1 181.85 255
10 On axis A b/n 1-8 0.00
Top bar 20 4.00 2.00 1 2.00 8

20 12.00 2.00 1 2.00 24

20 12.00 2.00 1 2.00 24


20 12.00 2.00 1 2.00 24

20 3.15 2.00 1 2.00 6

Negative Bar 20 2.68 4.00 1 4.00 11

20 3.74 4.00 1 4.00 15

20 3.63 2.00 1 2.00 7

20 3.59 2.00 1 2.00 7

20 3.50 2.00 1 2.00 7

20 3.57 2.00 1 2.00 7


20 3.82 2.00 1 2.00 8
20 2.63 2.00 1 2.00 5
Bottom bar 20 6.40 6.00 1 6.00 38
20 11.35 3.00 1 3.00 34
20 11.05 3.00 1 3.00 33
20 12.00 3.00 1 3.00 36
Stirrups 8 1.40 343.00 1 343.00 480
11 On axis B b/n 1-8 0.00
Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 3.15 2.00 1 2.00 6
Negative Bar 20 2.68 4.00 1 4.00 11
20 3.74 4.00 1 4.00 15
20 3.63 2.00 1 2.00 7
20 3.59 2.00 1 2.00 7
20 3.50 2.00 1 2.00 7
20 3.57 2.00 1 2.00 7
20 3.82 2.00 1 2.00 8
20 2.63 2.00 1 2.00 5
Bottom bar 20 6.40 6.00 1 6.00 38
20 11.35 3.00 1 3.00 34
20 11.05 3.00 1 3.00 33
20 12.00 3.00 1 3.00 36
Stirrups 8 1.40 340.00 1 340.00 476
On axis C b/n 1-8 0.00
Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 4.00 2.00 1 2.00 8
Negative Bar 20 2.63 2.00 1 2.00 5
20 3.74 2.00 1 2.00 7
20 3.63 2.00 1 2.00 7
20 3.59 2.00 1 2.00 7
20 3.50 2.00 1 2.00 7
20 3.57 2.00 1 2.00 7
20 3.82 2.00 1 2.00 8
20 2.63 2.00 1 2.00 5
Bottom bar 20 11.85 3.00 1 3.00 36
20 11.25 3.00 1 3.00 34
20 5.65 3.00 1 3.00 17
20 12.00 3.00 1 3.00 36
Stirrups 8 1.40 330.00 1 330.00 462

stair beam On axis C' b/n 4-5 0.00


Top bar 20 6.45 4.00 1 4.00 26
Bottom bar 20 5.65 3.00 1 3.00 17
Stirrups 10 1.40 43.50 1 43.50 61
On axis D b/n 1-8 0.00
Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 4.00 2.00 1 2.00 8
Negative Bar 20 2.68 2.00 1 2.00 5
20 3.74 2.00 1 2.00 7
20 8.99 3.00 1 3.00 27
20 8.77 3.00 1 3.00 26
20 3.82 2.00 1 2.00 8
20 2.63 2.00 1 2.00 5
Bottom bar 20 11.90 3.00 1 3.00 36
20 11.25 4.00 1 4.00 45
20 5.65 4.00 1 4.00 23
20 12.00 3.00 1 3.00 36
Stirrups 8 1.40 336.00 1 336.00 470
On axis D b/n 3''-4,5-5' 0.00
Top bar 20 3.35 3.00 1 3.00 10
20 3.10 3.00 1 3.00 9
Bottom bar 20 2.55 3.00 1 3.00 8
20 2.30 3.00 1 3.00 7
Stirrups 8 1.40 15.85 1 15.85 22
8 1.40 17.77 1 17.77 25
On axis E b/n 1-6 0.00
Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 12.00 2.00 1 2.00 24
20 2.53 2.00 1 2.00 5
Negative Bar 20 2.63 2.00 1 2.00 5
20 3.74 2.00 1 2.00 7
20 3.63 2.00 1 2.00 7
20 3.59 2.00 1 2.00 7
20 3.50 2.00 1 2.00 7
20 2.46 2.00 1 2.00 5
Bottom bar 20 6.35 3.00 1 3.00 19
20 11.35 3.00 1 3.00 34
20 11.05 3.00 1 3.00 33
Stirrups 8 1.40 196.88 1 196.88 276
On axis F b/n 6-8 0.00
Top bar 20 10.15 2.00 1 2.00 20
20 3.95 2.00 1 2.00 8
Negative Bar 20 2.24 2.00 1 2.00 4
20 3.82 2.00 1 2.00 8
20 2.63 2.00 1 2.00 5
Bottom bar 20 11.70 3.00 1 3.00 35
Stirrups 8 1.40 77.00 1 77.00 108
On axis G b/n 4-6 0.00
Top bar 20 8.60 2.00 1 2.00 17
20 4.00 2.00 1 2.00 8
Negative Bar 20 2.17 2.00 1 2.00 4
20 3.50 2.00 1 2.00 7
20 2.48 2.00 1 2.00 5
Bottom bar 20 10.99 3.00 1 3.00 33
Stirrups 8 1.40 73.15 1 73.15 102
On axis G' b/n 1-4 0.00
Top bar 20 4.00 2.00 1 2.00 8
20 12.00 2.00 1 2.00 24
20 3.65 2.00 1 2.00 7
Negative Bar 20 2.63 2.00 1 2.00 5
20 3.74 2.00 1 2.00 7
20 3.63 2.00 1 2.00 7
20 2.57 2.00 1 2.00 5
Bottom bar 20 6.35 3.00 1 3.00 19
20 11.35 3.00 1 3.00 34
Stirrups 8 1.40 113.77 1 113.77 159
Total length (m) 4678 61 0 0 0 3545 0
Linear weight Kg/m 0.395 0.617 0.888 1.208 1.578 2.466 3.551
Total weight(Kg) 1847.68 37.58 0.00 0.00 0.00 8742.32 0.00
Project : 4B+G+14 Mixed Use Appartment
Contractor: Hambra Plc.
Sub-Contractor:Ameneshewa Solomon & friends Small Building Contractors p/s

Total BAR LENGTH IN METER


No of
It. no location shape Dia Length No of No of
Bar per Member Bar
mem. Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
D) 1st basement -Ground floor 0.00
1st flight 12 3.51 16.00 1 16.00 56
1st flight 12 6.53 16.00 1 16.00 104
1st flight 12 1.37 16.00 1 16.00 22
1st flight 12 1.20 16.00 1 16.00 19
1st flight 12 2.05 16.00 1 16.00 33
1st flight 8 1.03 8.00 10 80.00 82
1st flight 8 1.47 40.00 1 40.00 59
1st flight 8 1.47 10.00 1 10.00 15
STAIR 1A
2nd flight 12 2.57 16.00 1 16.00 41
2nd flight 12 7.96 16.00 1 16.00 127
2nd flight 12 1.37 16.00 1 16.00 22
2nd flight 12 1.20 16.00 1 16.00 19
2nd flight 12 2.13 16.00 1 16.00 34
2nd flight 8 1.03 8.00 10 80.00 82
2nd flight 8 1.47 40.00 1 40.00 59
2nd flight 8 1.47 10.00 1 10.00 15
0.00
1st flight 12 3.28 16.00 1 16.00 52
1st flight 12 6.28 16.00 1 16.00 100
1st flight 12 1.37 16.00 1 16.00 22
1st flight 12 1.20 16.00 1 16.00 19
1st flight 12 2.05 16.00 1 16.00 33
1st flight 8 1.03 8.00 10 80.00 82
1st flight 8 1.47 40.00 1 40.00 59
STAIR 2A 1st flight 8 1.47 10.00 1 10.00 15
2nd flight 12 4.04 16.00 1 16.00 65
2nd flight 12 7.74 16.00 1 16.00 124
2nd flight 12 1.37 16.00 1 16.00 22
2nd flight 12 1.20 16.00 1 16.00 19
2nd flight 12 1.88 16.00 1 16.00 30
2nd flight 8 1.03 8.00 10 80.00 82
2nd flight 8 1.47 40.00 1 40.00 59
Axis 5/C-E 2nd flight 8 1.47 10.00 1 10.00 15
Landing
Top bar 20 13.05 2 1 2.00 26
Bottom bar
Distribution 20 12.00 3 1 3.00 36
bar 20 2.78 3 1 3.00 8
20 3.87 3 1 3.00 12
20 2.65 3 1 3.00 8
Stirrups a 10 1.40 99 1 99.00 139
Stirrups b 8 1.40 76 1 76.38 107
Total length (m) 731 139 965 0 0 90 0
Linear weight Kg/m 0.395 0.617 0.888 1.208 1.578 2.466 3.551
Total weight(Kg) 289 86 857 0 0 222 0
Project : 4B+G+14 Mixed Use Appartment
Contractor: Hambra Plc.
Sub-Contractor:Ameneshewa Solomon & friends Small Building Contractors p/s

It. No of Bar No of BAR LENGTH IN METER


Location Shape Dia Length Total No of Bar
no per mem. Member Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

Enterance Stair
ON AXIS 1/B-C 14 9.28 54 1 54.00 501.12
14 1.26 49 1 49.00 61.79
14 2.71 49 1 49.00 132.89
14 1.27 49 1 49.00 62.38
RISER 14 1.27 73 1 73.00 92.71
10 4.80 52 1 52.00 249.60
SB1, On axis1 b/n B-C 1 0.00
Top bar 20 5.66 7 1 7.00 39.62
Bottom bar 20 4.76 6 1 6.00 28.56
Stirrups 8 1.10 48 1 48.00 52.80
SB2, On axis1 b/n B-C 1 0.00
Top bar 20 6.66 7 1 7.00 46.62
Bottom bar 20 5.86 6 1 6.00 35.16
Stirrups 8 1.10 57 1 57.00 62.70
SB3, On axis1 b/n B 1 0.00
Top bar 20 7.16 7 1 7.00 50.12
Bottom bar 20 5.86 6 1 6.00 35.16
Stirrups 8 1.10 57 1 57.00 62.70
SB4, On axis1 b/n C 1 0.00
Top bar 20 7.16 7 1 7.00 50.12
Bottom bar 20 4.76 6 1 6.00 28.56
Stirrups 8 1.10 48 1 48.00 52.80
SHEAR WALL ON AXIS 1,b/n axis B-C

main bar 12 1.50 50.00 2 100.00 150.00


distribution bar on axis A axis 1-4 10 4.80 10.00 2 20.00 96.00
stirup 8 1.40 4.00 1 4.00 5.60

Total length (m) 237 346 150 851 0 314 0

Linear weight Kg/m 0.395 0.617 0.888 1.208 1.578 2.466 3.551
Total weight(Kg) 93.46 213.24 133.20 1027.87 0.00 774.13 0.00
Project : 4B+G+14 Mixed Use Appartment
Contractor: Hambra Plc.
Sub-Contractor:Ameneshewa Solomon & friends Small Building Contractors p/s

It. No of Bar No of Total No BAR LENGTH IN METER


Location Shape Dia Length
no per mem. Member of Bar Ø8
Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

Ground Floor extended Stair landing slab


and beam
1 BEAM @ Axis D'-D /3"-4 & 5-5'
Top bar 20 3.35 5 4 20 67.00
Bottom bar 20 3.10 3 4 12 37.20
Stirrups a 8 1.40 13 4 52 72.80
EXTENDED LANDING SLAB MESH @
Axis D'-D /3"-4 & 5-5'
Top bar 10 1.70 13 2 26 44.20
Bottom bar 10 1.70 13 2 26 44.20
Top bar 10 1.40 12 2 24 33.60
2 Lift-hook beam
10 3.18 3 2 6 19.08
10 2.88 2 2 4 11.52
stirrup 10 0.98 19 2 38 37.24
3 CANTILIBER REWORK
14 4.80 54 1 54.00 259.2
On axis G'-G/7-8
8 2.40 4 2 8 19.20
10 1.20 54 1 54
Submerged BEAM @ Axis A'-A/1-4
Top bar 20 3.00 2 4 8 24.00
Bottom bar 20 3.00 2 4 8 24.00
Stirrups a 8 1.40 17 4 68 95.20
Submerged BEAM @ Axis G'-G/1-4
Top bar 20 2.50 2 3 6 15.00
Bottom bar 20 2.50 2 3 6 15.00
Stirrups a 8 1.40 10 3 30 42.00
Submerged BEAM @ Axis G'-G/1-4
Top bar 20 3.50 2 1 2 7.00
Bottom bar 20 3.50 2 1 2 7.00
Stirrups a 8 1.40 13 1 13 18.20
Total length (m) 73 209 0 259 0 104 0
Linear weight Kg/m 0.395 0.617 0.888 1.208 1.578 2.466 3.551
Total weight(Kg) 28.76 128.98 0.00 313.11 0.00 256.96 0.00