RTB FP 03 006 Despatch Loading Bin
RTB FP 03 006 Despatch Loading Bin
H H
CONCRETE :
1. ALL CONCRETE WORK SHALL COMPLY WITH THE REQUIREMENTS OF SANS 1200 G.
2.CONCRETE STRENGTH SHALL BE AT 28 DAYS AS FOLLOW :
BLINDING-10 MPa/19mm
PILE CAPS -25 MPa/19mm
FOUNDATIONS -25 MPa/19mm
COLUMNS - 25 MPa/19mm
G WALLS -25 MPa/19mm G
SURFACE BED - 25 MPa/19mm
BEAM AND GROUND BEAM - 25 MPa/19mm
5812
SLABS -25 MPa/19mm
3.CONTRACTOR MUST TAKE LEVELS OF SHUTTERING BEFORE AND AFTER PLACING SLAB
REINFORCING TO CONFIRM SHUTTERING TO BE 100% LEVEL.
4.STRIPPING TIMES OF SHATTERING AND PROPPING SHALL BE IN ACCORDANCE WITH
SANS 1200 G. (MIN 7 DAYS FOR PAN REMOVAL AND 17 DAYS FOR BACK PROPPING.)
250
F A+ MID SPAN-SPAN / 400 F
11. WHERE A SLAB AND BEAM IS CAST MONOLITHICALLY AND THE BEAM DEPTH EXCEEDS
3 TIMES THE SLAB THICKNESS OR THE BEAM IS DEEPER THAN 300mm, THE BEAM MUST
BE VIBRATED A SECOND TIME 1 HOUR AFTER INITIAL SLAB VIBRATION.
E E
1.ALL STRUCTURAL STEEL WORK SHALL BE INSPECTED, FABRICATED AND ERECTED IN ACCORDANCE
WITH SANS 1200 H.
3.WELDS SHALL CONFORM TO SABS 0167-1984 AND ALL SABS 044 SPECIFICATIONS.
4.ALL SPLICES AND CONNECTIONS INCLUDING WELDING, TO BE FULL STRENGTH AND WELDING TO
BE A MINIMUM THICKNESS EQUAL TO PART BEING CONNECTED AT LEAST 4 TIMES THE LENGTH
OF AN ANGLE IF ANGLES ARE USED.
11.WHERE APPLICABLE, GROUT SHALL BE PROVIDED UNDER BASE PLATES BEFORE ANY PRIMARY
LOADS ARE APPLIED TO STRUCTURE.
RUSTENBURG SMELTER
GENERAL NOTES:
1)ALL WELDING TO BE 8mm CONT. FILLET U.O.S.
GENERAL TOLERANCE This drawing is confidential and the property
of
DESCRIPTION A Glencore Merafe Venture Operation
44 Vanadium Street Rustenburg 0299
2) STEELWORK TO BE FABRICATED IN ACCORDANCE WITH SABS 1200-H(HA) NOTE: MACH ABOVE INCL. FABR
South Africa
3) ALL BOLTS TO BE GRADE 8.8 ACCORDING TO SABS 1700 (ISO 4014) THIS DRAWING CAN ONLY BE USED 0.1 0.5 6
Rustenburg Smelter Tel: +27(0) 14 590 6000
Fax: +27(0) 14 590 6002
4) WELDS SHALL CONFORM TO SABS 0167-1984 AND ALL SABS 044 SPECIFICATIONS. FOR WHAT IT HAS BEEN ISSUED Approval Information x
0.2 6 30
0.25
a Glencore Merafe Venture Operation DESPATCH DRAWN D KATEERA 2023-07-29
FOR. THE PROJECT DRAWING 0.3 30 120
0.5 It is subject to return upon demand. No copies may be made of the whole or
5) ALL STRUCTURAL STEEL WORK SHALL BE GRADE S355JR. OR OTHERWISE STATED
6) ROUGH WELDS TO BE GROUNDED SMOOTH TO SABS 044 DEPARTMENT WILL NOT TAKE ANY Tender Manufacture
0.5
0.8
120
315
315
1000
1.5
part thereof and it may not be shown or passed onto any third party or used
directly or indirectly for any other purpose than the manufacture or
LOAD BIN STRUCTURE CHECKED
APPROVED
7) ALL COMPONENTS ARE TO BE FREE FROM BURRS AND SHARP EDGES.
RESPONSIBILITY FOR THIS 1.2 1000 2000
Construction 2 2000 4000
construction of equipment or in the design and installation of the plant to the SCALE
Paper .
A1 SIGNATURE
A 8) MATERIAL SHOWN FOR ONE SUBMERSIBLE PUMP ONLY DRAWING IF IT HASN'T BEEN 3 Size A
AS REQUIRED. 3 4000 8000 . order of
1 2022-10-27 D KATEERA APPROVED BY ENGINEER. DRAWING N SHEET OF REV.
REV DATE DESCRIPTION AUTHOR APPROVED 9) ALL HOLES TO BE DIAMETER 18 UNLESS OTHERWISE STATED
4
5
8000
12000
12000
16000 6 Rustenburg Smelter RTB-FP-03-006
REVISION HISTORY 6 16000 20000
1 2
12 11 10 9 8 7 6 5 4 3 2 DRAWING BASED ON SABS 0111(1993)1