Method Statement
Method Statement
Cross-channel grids must be inserted between main channel grids, flush cut, and
secured to longitudinal channels.
All exposed acoustical ceiling unit surfaces must be level and flush, with all seams
straight and true.
Light fixtures and other components must be cut and fitted neatly.
Before entering the area of operation, all staff will go through the health and safety
introduction. Employees will only be provided access permissions when they have
completed their induction.
Access and egress onto the rear of any vehicle or trailer will be through a ladder
fastened to the truck or trailer’s side.
Prior to beginning any job on site, all staff must get a safety induction/training.
Job supervisors must have a pre-job STARRT/TBT meeting to inform workers
about job-specific dangers.