UNIT-I SEPM Objective Questions

The document contains 37 multiple choice questions about software engineering processes and models. It covers topics like software characteristics, common myths in software development, software lifecycle models (waterfall, spiral, incremental), software quality assurance processes, standards like ISO 9001, and quality factors. The questions have a single correct answer choice for each.

Uploaded by

Raj
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views

UNIT-I SEPM Objective Questions

The document contains 37 multiple choice questions about software engineering processes and models. It covers topics like software characteristics, common myths in software development, software lifecycle models (waterfall, spiral, incremental), software quality assurance processes, standards like ISO 9001, and quality factors. The questions have a single correct answer choice for each.

Uploaded by

Raj
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 11

Department of Information Technology

Year 2020-21
Class: TEIT UNIT-I Sub: SEPM

Q.1. Which statement is correct for software characteristics

a. Software is engineered, not manufactured.

b. Software does not wear out

c. Most software is custom built rather than being assembled from components

d. All of the above.

Ans: D

Q.2. Management level Myths given as-.

a. Using a collection of standards and procedures one can built software.

b. Add more people to meet deadline of the project.

c. If project is outsourced to a third party then all worries of software building are over.

d. All of the above

Ans: D

Q.3. Which statements are/is correct for Practitioners level myths.

a. Once program is running then its over.

b. Working program is the only work product for the software project.

c. Both a and b

d. Even if software requirement s are changing continuously it is possible to accommodate this

changes in the software.

Ans: C

Q.4. Software process is characterized by –

a. Process frame work activities

b. Task set
c. Umbrella activities

d. All of the above

Ans: D

Q.5. In waterfall model software development start and end phases are-

a. Requirement gathering, Design, Coding, Testing, Maintenance.

b. Requirement gathering, Coding, Design, Testing, Maintenance.

c. Requirement gathering, Design, Testing, Coding, Maintenance.

d. Requirement gathering, Testing, Design, Coding, Maintenance.

Ans: A

Q.6. ------- model takes extremely short development cycle.

a. Waterfall model

b. RAID model

c. Spiral Model

d. Concurrent development Model

Ans: B

Q.7. For large or high budget project following model is used.

a. Waterfall model

b. RAID model

c. Spiral Model

d. Concurrent development Model

Ans: C

Q8. The zero defect software can be developed using this model.

a. Waterfall model

b. RAID model

c. Spiral Model
d. Clean room engineering model

Ans: D

Q.9. The technique used to evaluate whether software product fulfill the requirements or condition
imposed on them by standards called.

a. Verification

b. Validation

c. Both a and b

d. None of the above.

Ans: A

Q.10. The technique used to evaluate the final built software product fulfill the customer requirements
are called as-

a. Verification

b. Validation

c. Both a and b

d. None of the above.

Ans: B

Q. 11. Which of the following is/are considered stakeholder in the software process?

a. Customers

b. End-users

c. Project managers

d. All of the above.

Ans: D

Q.12. Software process and improvement are assessed by ____.

a. ISO 9000

b. ISO 9001

c. SPICE (ISO/IEC15504)
d. Both B and C

Ans: D

Q.13. -------finds about 50% to 60% of the defects in software.

a. Verification

b. Validation

c. Both a and b.

d. None of the above

Ans: A

Q.14. Software quality assurance attributes are/is-

a. Correctness

b. Reliability

c. Usability

d. All of the above

Ans: D

Q.15. McCall’s quality factor contain

a. Product Revision

b. Product Transition

c. Product Operation

d. All of the above

Ans: D

Q.16. -----model address minimum criteria to accept quality system and focus on H/w, S/w, Process
material and service.

a. ISO 9001

b. Capability Maturity Model (CMM)

c. Both a and b
d. None of the above

Ans: A

Q.17. Following Major tasks conducted during cleanroom Approach.

a. Requirement gather, design, coding, testing, maintenance.

b. Formal Specification, Increment planning, Req. gathering, BSS, FD, CV, CD, STP, SUT.

c. Customer communication, Planning, risk analysis, engineering, construct and release,

customer evaluation

d. None of the above

Ans: B

Q.18. In waterfall model software development start and end phases are-

a. Requirement gathering, Design, Coding, Testing, Maintenance.

b. Requirement gathering, Coding, Design, Testing, Maintenance.

c. Requirement gathering, Design, Testing, Coding, Maintenance.

d. Requirement gathering, Testing, Design, Coding, Maintenance.

Ans: A

Q.19.

Is --------Model .

a. Waterfall model

b. RAID model

c. Incremental
d. Concurrent development Model

Ans: C

Q.20. Choose the correct statements from the following.

1. Verification is about process, Standered and guideline.

2. Validation is about Product

a. 1st Statement is correct

b. 2nd Statement is correct

c. 1st and 2nd both Statements are correct

d. Both first and second are wrong

Ans: D

Q.21. Guidelines Step for ISO 9001:2000 are:

a. Support the quality, document the quality management system

b. Satisfy the customer, conduct quality planning

c. Provide quality infrastructure, control product development

d. All of the above

Ans: D

Q.22. ------- model takes extremely short development cycle.

a. Waterfall model

b. RAID model

c. Spiral Model

d. Concurrent development Model

Ans: B

Q.23. Which statement is correct for prescriptive process model.


a. In waterfall model requirement must be clearly understood and define at beginning only.

b. In Spiral model requirement gather can be done in iteration as requirement get changed quite
often.

c. In RAD model requirement must be clearly understood and define.

d. All of the above.

Ans: D

Q.24. Customer level Myths given as-

a. Even if S/W requirements change continuously it is possible to accommodate changes in

S/W.

b. We can start writing the program by using general problem statements only. Later on using

problem description.

c. If project is outsourced to a third party then all worries of software building are over.

d. only first and second statement

Ans: D

Q.25. Following Major tasks conducted during cleanroom Approach.

a. Requirement gather, design, coding, testing, maintenance.

b. Formal Specification, Increment planning, Req. gathering, BSS, FD, CV, CD, STP, SUT.

c. Customer communication, Planning, risk analysis, engineering, construct and release,

customer evaluation

d. None of the above

Ans: B

Q.26. --------process is an adoption of the waterfall model; it targets at developing software in a short
span of time and follow the iterative.

a. Rapid Application Development

b. Incremental model

c. Spiral Model
d. All of the above

Ans: A

Q.27. In waterfall model software development start and end phases are-

a. Requirement gathering, Design, Coding, Testing, Maintenance.

b. Requirement gathering, Coding, Design, Testing, Maintenance.

c. Requirement gathering, Design, Testing, Coding, Maintenance.

d. Requirement gathering, Testing, Design, Coding, Maintenance.

Ans: A

Q.28.

Is --------Model .

a. Waterfall model

b. RAID model

c. Incremental

d. Concurrent development Model

Ans: C

Q.29. For large or high budget project following model is used.

a. Waterfall model

b. RAID model

c. Spiral Model

d. Concurrent development Model

Ans: C
Q30. The formal mathematical proofs required to check the correctness of program in model.

a. Waterfall model

b. RAID model

c. Spiral Model

d. Clean room engineering model

Ans: D

Q.31. SQA activity conducted by SQA group are.

a. Prepare SQA plan for project

b. Participate in the development of the project software process description.

c. Review software engineering activities to verify compliance with software process.

d. All of the above.

Ans: D

Q.32. Verification is for prevention of error and validation is detection of error.

a. True

b. False

Ans: A

Q. 33. Which of the following is classification on software.

a. Application, System software

b. Engineering, embedded, web application software

c. C, C++, and Java software

d. Both first and second

Ans: D

Q.34. Software quality assurance attributes are-

a. Flexibility, testability

b. Portability, Integrity
c. Usability, Correctness

d. All of the above

Ans: D

Q.35. Capability maturity model focus strictly on --------.

a. Software

b. Hardware

c. Process material and service

d. None of the above

Ans: A

Q.36.

Is --------- quality factor diagram.

a. ISO 9001:2000

b. McCall

c. CMM

d. All of the above

Ans: B

Q.37. Guidelines Step for ISO 9001:2000 are:

a. Support the quality, document the quality management system

b. Satisfy the customer, conduct quality planning

c. Provide quality infrastructure, control product development


d. All of the above

Ans: D