UNIT-I SEPM Objective Questions
UNIT-I SEPM Objective Questions
Year 2020-21
Class: TEIT UNIT-I Sub: SEPM
c. Most software is custom built rather than being assembled from components
Ans: D
c. If project is outsourced to a third party then all worries of software building are over.
Ans: D
b. Working program is the only work product for the software project.
c. Both a and b
Ans: C
b. Task set
c. Umbrella activities
Ans: D
Q.5. In waterfall model software development start and end phases are-
Ans: A
a. Waterfall model
b. RAID model
c. Spiral Model
Ans: B
a. Waterfall model
b. RAID model
c. Spiral Model
Ans: C
Q8. The zero defect software can be developed using this model.
a. Waterfall model
b. RAID model
c. Spiral Model
d. Clean room engineering model
Ans: D
Q.9. The technique used to evaluate whether software product fulfill the requirements or condition
imposed on them by standards called.
a. Verification
b. Validation
c. Both a and b
Ans: A
Q.10. The technique used to evaluate the final built software product fulfill the customer requirements
are called as-
a. Verification
b. Validation
c. Both a and b
Ans: B
Q. 11. Which of the following is/are considered stakeholder in the software process?
a. Customers
b. End-users
c. Project managers
Ans: D
a. ISO 9000
b. ISO 9001
c. SPICE (ISO/IEC15504)
d. Both B and C
Ans: D
a. Verification
b. Validation
c. Both a and b.
Ans: A
a. Correctness
b. Reliability
c. Usability
Ans: D
a. Product Revision
b. Product Transition
c. Product Operation
Ans: D
Q.16. -----model address minimum criteria to accept quality system and focus on H/w, S/w, Process
material and service.
a. ISO 9001
c. Both a and b
d. None of the above
Ans: A
b. Formal Specification, Increment planning, Req. gathering, BSS, FD, CV, CD, STP, SUT.
customer evaluation
Ans: B
Q.18. In waterfall model software development start and end phases are-
Ans: A
Q.19.
Is --------Model .
a. Waterfall model
b. RAID model
c. Incremental
d. Concurrent development Model
Ans: C
Ans: D
Ans: D
a. Waterfall model
b. RAID model
c. Spiral Model
Ans: B
b. In Spiral model requirement gather can be done in iteration as requirement get changed quite
often.
Ans: D
S/W.
b. We can start writing the program by using general problem statements only. Later on using
problem description.
c. If project is outsourced to a third party then all worries of software building are over.
Ans: D
b. Formal Specification, Increment planning, Req. gathering, BSS, FD, CV, CD, STP, SUT.
customer evaluation
Ans: B
Q.26. --------process is an adoption of the waterfall model; it targets at developing software in a short
span of time and follow the iterative.
b. Incremental model
c. Spiral Model
d. All of the above
Ans: A
Q.27. In waterfall model software development start and end phases are-
Ans: A
Q.28.
Is --------Model .
a. Waterfall model
b. RAID model
c. Incremental
Ans: C
a. Waterfall model
b. RAID model
c. Spiral Model
Ans: C
Q30. The formal mathematical proofs required to check the correctness of program in model.
a. Waterfall model
b. RAID model
c. Spiral Model
Ans: D
Ans: D
a. True
b. False
Ans: A
Ans: D
a. Flexibility, testability
b. Portability, Integrity
c. Usability, Correctness
Ans: D
a. Software
b. Hardware
Ans: A
Q.36.
a. ISO 9001:2000
b. McCall
c. CMM
Ans: B
Ans: D