Material Schedule of Two Storey Building
Material Schedule of Two Storey Building
B. EARTHWORKS
Site Clearing and Excavations 1 Lot 11,100.00
Ground Leveling and Backfills 200 m3 60,000.00
G. FINISHES 4,796,450.00