This document provides a job method statement for replacing the motor for the main gate. It includes: 1) A list of manpower needed for the job including supervisors, foremen, skilled workers, and vendors. 2) A list of required tools and equipment including drilling machines, welding machines, safety tools like barricades and fire extinguishers, and personal protective equipment. 3) Details on the mobilization and preparation process including site visits, equipment inspections, and transferring items to the job site.

Uploaded by

Mohd Khaidir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views3 pages

03 JMS For Replace Gate Motor

This document provides a job method statement for replacing the motor for the main gate. It includes: 1) A list of manpower needed for the job including supervisors, foremen, skilled workers, and vendors. 2) A list of required tools and equipment including drilling machines, welding machines, safety tools like barricades and fire extinguishers, and personal protective equipment. 3) Details on the mobilization and preparation process including site visits, equipment inspections, and transferring items to the job site.

Uploaded by

Mohd Khaidir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

TITLE : JOB METHOD OF STATEMENT FOR MOTOR REPLACEMENT FOR MAIN GATE

DOC NO : OBZA-PT2-JMS003
TARGET DATE : SEPT 1ST 2023

A) List of Manpower
B) Required Tools and Equipment
C) Mobilization
D) Job Steps
E) Attachment (s)

A) List of Manpower

No. PT2
Name Position OGSP Remarks
Induction
1 Mohd Khairil Supervisor Yes Yes -
2 Muhammad Imran Sapuan Foreman Yes Yes -
3 Rosyam Skilled Worker Yes Yes -
4 Firdaus Skilled Worker Yes Yes -
5 Mahadir Skilled Worker Yes Yes -
6 Vendor 1 Vendor forMotor No Yes -
7 Vendor 2 Vendor for Motor No Yes -

B) Required Tools and Equipment

No. Tools Quantity Usage


1 Drilling Machine 1 Set Drill the hole
2 Power Cable c/w industrial socket 1 roll Connecting power supply
3 Spanner set 1 set Transfer debris
4 Grinding Machine 1 set Cutting the material
5 Welding Machine 1 set Welding work

 Machinery

No. Equipment Info Usage

 Safety tools;

No. Tools Qty Usage


1 Barricade As required To barricade work site
2 Fire blanket As required Control the spark
3 Fire entinguisher 1 no Control the fire

 Personal Protective Equipment (PPE);

2. Safety Helmet.
3. Safety Goggles.
4. Protective Gloves.
5. Safety Shoes.
7. Welding Shield

C) Mobilization & Preparation

1. Site Visit (2 days before operation day)


 Supervisor with the team perform site visit to the working area to identify actual
requirement for the work.
 Identify supporting work to execute the work - power supply
 Identify the best method to start the work.
 Identify obstruction and take proper action to eliminate obstruction

2. Preparation of work (2 days before operation day)


 Inspect all electrical equipment
 JSA and JMS approved

3. Mobilization work (1 day before operation day)


 Mobilize equipment, tools and material to the site
 Secure all item at safe place.
 Finalize the manpower – safety induction
 Finalize the documentation – Method of statement, permits and etc
 Final discussion with PT2’s PIC for the operation.
 Transfer all inspected tools, equipment and machinery to the job area.

D) Job Steps

 Applying permit to work


 Power off for the motor system. Perform Lock Out Tag Out (LOTO) system for the power supply to
the motor system.
 Remove existing motor, wiring, gear plate, junction box and other accessories
 Install new motor, junction box and other accessories
 Wiring work to the new motor and junction box.
 For new junction box to use existing cable gland - coming from bottom of the junction box
 Install new gear plate - welding work required
 Touch - up paint and tighten all bolts
 De-LOTO for the motor system.
 Test run
 Housekeeping work
E) Attachment(s) – N/A

Approved By: _________________________

Signature: _________________________

Name: _________________________

Designation: _________________________

Date: _________________________