03 JMS For Replace Gate Motor
03 JMS For Replace Gate Motor
DOC NO : OBZA-PT2-JMS003
TARGET DATE : SEPT 1ST 2023
A) List of Manpower
B) Required Tools and Equipment
C) Mobilization
D) Job Steps
E) Attachment (s)
A) List of Manpower
No. PT2
Name Position OGSP Remarks
Induction
1 Mohd Khairil Supervisor Yes Yes -
2 Muhammad Imran Sapuan Foreman Yes Yes -
3 Rosyam Skilled Worker Yes Yes -
4 Firdaus Skilled Worker Yes Yes -
5 Mahadir Skilled Worker Yes Yes -
6 Vendor 1 Vendor forMotor No Yes -
7 Vendor 2 Vendor for Motor No Yes -
Machinery
Safety tools;
2. Safety Helmet.
3. Safety Goggles.
4. Protective Gloves.
5. Safety Shoes.
7. Welding Shield
D) Job Steps
Signature: _________________________
Name: _________________________
Designation: _________________________
Date: _________________________