The document provides a detailed checklist for creating engineering drawings for structural steel fabrication. It outlines over 50 individual steps to ensure anchor bolt plans, framing drawings, sections and details, as well as shop drawings for columns and beams are accurately prepared and include all necessary information.

Uploaded by

Hemantha Mysuru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

Detailer Check List (1.0)

The document provides a detailed checklist for creating engineering drawings for structural steel fabrication. It outlines over 50 individual steps to ensure anchor bolt plans, framing drawings, sections and details, as well as shop drawings for columns and beams are accurately prepared and include all necessary information.

Uploaded by

Hemantha Mysuru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Detailer Check List Aniya Engineering Services Pvt. Ltd.

DETAILER CHECK LIST

Study all the job specifications and fabricator requirements / procedures before starting any drawing.
Follow all drawing title block, layers, text & dimensions etc., as per client samples, if not follow
as per standards.

ANCHOR BOLT PLAN


1. Fill title block correctly, project name, owner, contractor, title & drg. no. etc
2. Add all the relevant notes
3. Verify north marking
4. Mark grid nos. correctly
5. Verify building length and width
6. Verify column spacing and column sizes including intermediate columns
7. Verify orientation of columns
8. Verify base plate mark no. anchor bolt sizes, c/c dimensions & hole sizes
9. Verify base details like AB projection, length & footing details.
10. Ensure section markings and details match each other.
11. Verify elevation markings with respect to Design /Architectural drg.
12. Verify special requirements.
13. Note if any discrepancies and cloud them to verify.
14. Mark Rev. no. date and purpose correctly.

FLOOR / ROOF FRAMING (E-SHEETS)


1) Fill title block correctly, project name, owner, contractor, title & drg. no. etc
2) Verify building length and width
3) Verify setbacks if any (like walls, projections canopy etc.,)
4) Verify bay spacing, frame line markings & north marking
5) Indicate column mark nos. floor beam mark nos. & any other members.
6) Show elevations and reference points wherever required.
7) Add enlarged details if required.
8) Show section markings for all the different connections.
9) Show all the floor openings as per Design / Structural drawing
10)Show moment connection symbols as per structural design sheet.
11)Verify Special requirements.
12)Add all the relevant notes.
13) Note if any discrepancies and cloud them to verify.
14)Mark Rev. No. Date and Purpose Correctly.

SECTIONS & DETAILS FRAMING (E-SHEETS)


1. Fill title block correctly, project name, owner, contractor, title & drg no. etc
2. Verify all details as per framing plans.
3. Ensure section marking nos. matches with E-Plans
4. Ensure all elevations & members are as per E-plans
5. Provide weld symbols and clips / shear tabs as per design drg.
6. Add all the relevant notes
7. Note if any discrepancies and cloud them to verify.
8. Mark Rev. no. date and issued for correctly.

Confidential Page 1 of 2 Version No. 1.0 / 01-10-2007


Working copy if printed
Detailer Check List Aniya Engineering Services Pvt. Ltd.

SHOP DRAWINGS
COLUMN
1. Ensure quantity & column mark no.
2. Verify member size and length (over all & cut length)
3. Ensure base plate holes and thickness match with anchor bolt plan
4. Ensure column base and column Top elevation match with E-plans
5. Mark shop identification (like Face towards south etc.,)
6. Ensure weld symbols and sizes IMPORTANT
7. Verify beam connection holes, shear tabs or any other connections.
8. Show hole sizes & slot directions correctly.
9. Verify hole gauges & bolt length.
10. Ensure bracing gusset plates and orientation.
11. Verify shear key requirement & orientation as per design.
12. Verify stiffeners at moment connections as per design.
13. Compare BOM with each mark nos.
14. Verify quantity of Shop bolts / Field bolts (size & length) IMPORTANT
15. Provide special cleaning / painting / galvanizing notes if any.
16. Note if any discrepancies and cloud them to verify.
17. Mark Rev. no. date and purpose correctly.

BEAM
18. Ensure quantity & Rafter mark no.
19. Verify member size and length (over all & cut length)
20. Draw as per E-plan actual slope and orientation.
21. Show plans perpendicular to the main elevation.
22. Show sections wherever required.
23. Show cut backs at both ends.
24. Verify beam connection holes, clip angles & shear tab holes.
25. Show hole sizes & slot directions correctly.
26. Verify hole gauges & bolt length.
27. Verify cope dimensions and requirement.
28. Ensure weld symbols and sizes IMPORTANT
29. Provide sag angle / bracing plates as per E-plans.
30. Provide sections and details wherever required.
31. Ensure elevations of beams (at both ends of beams if sloped).
32. Compare BOM with each mark no.
33. Verify quantity of Shop bolts /field bolts (size & length) IMPORTANT
34. Provide special cleaning / painting / galvanizing notes if any.
35. Note if any discrepancies and cloud them to verify.
36. Mark Rev. no. date and issued for correctly.

ENSURE THE FOLLOWING:


View markings, Detail markings, dimension markings, Grid markings, Reference E-drawing
markings, overlapping of dimensions and texts.
All drawings presentation should be neat clean and should cover all related information.
Always select proper scale to suit the drawing size.

Confidential Page 2 of 2 Version No. 1.0 / 01-10-2007