0% found this document useful (0 votes)
38 views4 pages

23kb0101 Contract

23KB0101

Uploaded by

Tan Cobong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
38 views4 pages

23kb0101 Contract

23KB0101

Uploaded by

Tan Cobong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 4
Department of Public Works and Highways Contract ID 23KB0101, Contract Name 1 Access Road Leading to Kipilas Falls, Kitaotao, Bukidnon (Package I) Location of the Contract —:_Kitaotao, Bukidnon CONTRACT AGREEMENT ~ Bukic DPWH - Bukidnon 2nd District 23 MY mg Engineering Office: THIS AGREEMENT, made this day of ____ between Department of Public Works and Highways (DPWH) Bukidnon Second District Engineering Office herein called the "Entity" and Vicente T. Lao Construction with the main office address at KM 12, Diversion Road, Panacan, Davao City hereinafter called the "Contractor", WIRGINAG? SATOCAIL Disticl Engineer WHEREAS, the Entity is desirous that the Contractor execute 23KB0101 - Access Road Leading to Kipilas Falls, Kitaotao, Bukidnon (Package 1) Kitaotao, Bukidnon hereinafter called "the Works" and the Entity has accepted the Bid for NinetyFive Million Four Hundred Sixty One Thousand Eight Hundred Sixty Nine Pesos and 10/100 Centavos (Php. '95,461,869.10) by the Contractor for the execution and completion of such Works and remedying of any defects therein. ( VICENTE 7/ LAO CONSTRUCTION NOW THIS AGREEMENT WITNESSETH AS FOLLOWS: 1, In this Agreement, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to. VICENTE T. LAO General Manager 2. The following documents as required by the 2016 revised Implementing Rules and Regulations of Republic Act No. 9184 shall be deemed to form and be read ‘and construed as part of this Agreement, viz.: ‘a. Philippine Bidding Documents (PBDs); i, Drawings/Plans; i. Specifications; . Bill of Quantities (BOQ); iv. General and Special Conditions of Contract; /. Supplemental or Bid Bulletins, if any; ‘WITNESSES: b. Winning bidder's bid, including the Eligibility requirements, Technical and Financial Proposals, and all other documents or statements submitted; AEYNALD IETERIO Chief, Con¢ruffon Section 23KB0101 Contract Duration 270 Calendar Days Tem Wa Deserpton Quantiy | unt [Unk Pree | Tota ost rovision of 4x4 Pick Up Type 4120) [serice Veit forthe Engineeron | 9.000] mo | 1502.0] 14220050 re Renal as a A1s@) [Erinces on Me OMe forthe Too] ts | 093552) 009582 BERLYN P. ‘AO B.5__ [Project Billboard / Signboard 3.000 | each 6,679.05| 20,037.15 ‘Accountant I B.8(1) [Traffic Management 9.000 | mo 22,428.00) 201,852.00 2.72) Empat Stay and Heath 1000] | 23059360] 23359300 83 |Neizaton/Denobizaton 000 | is | sesso] 355,530.00 100(1)_[earng ane Grboing 3aw0 | ra | 2057130) 71568159 23K80101 Page 1 of 4 Contract ID Contract Name Location of the Contract DPWH - Bukidnon 2nd District Engineering Office: VIRGIYA| IL District Engineer ICENTET. LAO General Manager WITNESSES: REYNALD' TERIO ‘Shiet, Conskucifan Section SERLYN P. GANA Accountant i Department of Public Works and Highways 23KB0101 ‘Access Road Leadi to Kipilas Falls, Kitaotao, Bukidnon (Package 1) Kitaotao, Bukidnon CONSTRUCTION Fava tara aes Sa scopes [TR 000] en] 177035) ——«mavaso 020) [sptisGormon Ecartion | w978200 [eum] Baza] Ta 758.0 veann uc BxcaFON GMT 200 cum _206ae| __—_o39.80 norte om aa 2 2 om oe iesm[Gam| weal 7assoe Ether roxce [AEE FEN ORI |Teorsoo cum] ass] aeenaavo7 rescye bate Prenton one 3erz9| sam] som) __norzeiaue 200(1) [Aggregate Subbase Course 4,259.190 | Cum 1,789.00) 7,619,690.91 Paton Gen concer auicn prveene(Onenrores 015m | 1s40000|sam| 214138) 39%n13920 Ithk (14 days) pattand Conon GCE aiscat overt Omens) 020m | 16854300|sqm| 303813] 51.205 55846 Ithk (14 days) TOAGe Rerorng sea Gadewe) | ways wg | 9255] sas Social Gna 2055076 aan seazi0| cum] ro2srae] 161520608 Pe Gives = 90 mm do Ca sone Pea sza0o] im | saarae] __sisarss Die canes =m seacas Fre a Reteioized Teo cry Rcecoed Ter 71700|sam| non] _7onaez00 Retecorze Tcmoposic crag [etecered Teena ve2aia|sam|aairsil_zaipe2s TOTAL AMOUNT 35,869.70 Bid form, including all the documents/statements contained in the Bidder's bidding envelopes, as annexes, and all other documents submitted (e.g., Bidder's response to request for clarifications on the bid), including corrections to the bid, if any, resulting from the Procuring Entity's bid evaluation; Performance Security: d. Notice of Award of Contract and Bidder’s conforme thereto; and e. Other contract documents that may be required by existing laws and/or the Procuring Entity concerned in the PBDs. Winning bidder agrees that additional contract documents of information prescribed by the GPPB that are subsequently required for submission after the contract execution, the Notice to Proceed, Variation Orders, and Warranty Security, shall likewise form part of the Contract. In consideration for the sum of NinetyFive Million Four Hundred Sixty One Thousand Eight Hundred Sixty Nine Pesos and 10/100 Centavos (Php. 95,461,869.10) or such other sums as may be ascertained, Vicente T. Lao Construction agrees to Access Road Leading to Kipilas Falls, Kitaotao, Bukidnon (Package 1) Kitaotao, Bukidnon in accordance with his/her/its Bid. 23KB0101 Page 2 of 4 Department of Public Works and Highways Contract ID : 23KB0103 Contract Name + Access Road Leading to Ki Location of the Contract itaotao, Bukidnon las Fe itaotao, Bukidnon (Package I) 4. ‘The Department of Public Works and Highways (DPWH) Bukidnon Second District Engineering Office agrees to pay the above-mentioned sum in accordance with the terms of the Bidding, IN WITNESS whereof the parties thereof have caused this Agreement to be executed the day and year first before written, PROCURING ENTITY: CONTRACTOR: Represented by: Represented by: Witnessed by: Account TIT Engifed} 111 Chief, Finance Section Chief, Constjudfion Section 23KB0101 Page 3 of 4 Contract 1D Contract Name Location of the Contract Department of Public Works and Highways : 23KB0101 Access Road Leading to Kiy Kitaotao, Bukidnon las Falls, Kitaotao, Bukidnon (Package I) DPWH - Bukidnon 2nd District Engineering Office: VIRGIRAC. BATOCAIL Distrift Engineer VICENTE T. (AO CONSTRUCTION Aged General Manager, WITNESSES: REYNALD( JETERIO Chief, Const{uctfin Secton BERLYN P. Teamao ‘Accountant Il REPUBLIC OF THE PHILIPPINES ACKNOWLEDGEMENT Before me, as the Notary Public for and within the Municipality of Don Carlos, Bukidnon personally appeared VIRGINIA G, BATOCAIL,, District Engineer, representing the Republic of the Philippines — DPWH Bukidnon Second District Engineering Office, with Residence Certificate No. 16579813 issued on January 03, 2023 at Pinamaloy, Don Carlos, Bukidnon and VICENTE T. LAO, General Manager representing Vicente T. Lao Construction with TIN No. known to me to be the same persons who executed the foregoing CONTRACT AGREEMENT and who acknowledged to me that the same is their free act and deed for and in behalf of the parties they represent This instrument, consisting of FOUR (4) pages, including this page on which this acknowledgment is written, has been signed by the contracting parties and their instrumental witnesses on each and every page hereof. 23 MAY 103 WITNESS MY HAND AND NOTARIAL SEAL this __ day of at Don Carlos, Bukidnon. Series of 2023 23KB0101 Page 4 of 4

You might also like