Public Utilities - Preferred Layout in Footway: General Notes
Public Utilities - Preferred Layout in Footway: General Notes
2. ALL SETTING OUT COORDINATES AND LEVELS ARE BASED ON THE ORDNANCE SURVEY
GPS DATUM AS INDICATED.
3. ALL SETTING OUT DETAILS SHALL BE VERIFIED ON SITE WITH THE ENGINEER. THE ENGINEER
MAY REQUIRE MINOR AMENDMENT TO THE SETTING OUT AND/OR LEVEL DETAILS TO
ENSURE PROPER TIE IN TO THE EXISTING CARRIAGEWAY AND/OR FOOTWAYS.
4. NO PRIVATE SURFACE WATER RUN OFF SHALL DISCHARGE ONTO THE PUBLIC HIGHWAY.
CARRIAGEWAY
5. PRIVATE DRAINAGE AND EXTERNAL WORKS SHALL COMPLY WITH PART H OF THE
BUILDING REGULATIONS AND ALL ASSOCIATED BRITISH STANDARDS (BSEN WHERE
6. ALL WORK WITHIN THE PUBLIC HIGHWAY WILL BE CARRIED OUT IN ACCORDANCE WITH
TELECOMS
CABLE TV
ELEC HV
WATER
7. ALL PROPOSED ADOPTABLE SEWERS (EXCLUDING HIGHWAY DRAINS) AND ALL WORKS
GAS
TO THE EXISTING PUBLIC SEWERS SHALL BE CARRIED OUT STRICTLY IN ACCORDANCE WITH
THE WATER AUTHORITIES ASSOCIATION SPECIFICATION "SEWERS FOR ADOPTION 6TH
EDITION" AND THE REQUIREMENTS OF THE WATER AUTHORITY .
PUBLIC UTILITIES - PREFERRED LAYOUT IN FOOTWAY
NOT TO SCALE 8. ALL GULLIES, GULLY CONNECTIONS AND HIGHWAY DRAINS TO BE CONSTRUCTED IN
ACCORDANCE WITH THE REQUIREMENTS OF NORFOLK COUNTY COUNCIL HIGHWAY
AUTHORITY.
NOTES
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATIONS OF ANY
1. PREFERRED LAYOUT FOR MAINS IN AN 2000mm MINIMUM WIDTH FOOTWAY FOR
EXISTING STATUTORY UTILITIES, ALONG WITH ANY ADOPTABLE AND PRIVATE DRAINAGE
NEW WORKS, (WHERE THIS WIDTH IS TO BE PROVIDED AS PART OF THE APPROVED
THAT MAY BE AFFECTED BY THE PROPOSED WORKS. IDENTIFICATION SHOULD SHOULD BE
LAYOUT).
CARRIED OUT BY MEANS OF EITHER A CAT SCAN OR HAND DUG TRIAL HOLES. ANY
DAMAGE TO EXISTING PLANT OR EQUIPMENT SHALL BE REPAIRED AT THE CONTRACTORS
2. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH NJUG GUIDELINES.
EXPENSE.
3. THE CONTRACTOR'S ATTENTION IS DRAWN TO THE ECONOMIC ADVANTAGES OF
10. SITE CLEARANCE. EXISTING TREES, BUSHES AND SHRUBS SHALL ONLY BE REMOVED,
UTILISING "COMMON-TRENCHING" TECHNIQUES FOR INSTALLATION OF SERVICES IN
INCLUDING GRUBBING UP OF ALL ROOTS, WITH THE PRIOR AGREEMENT OF THE
FOOTWAYS WHEREVER PRACTICABLE.
ENGINEER. TRIMMING AND LOPPING OF EXISTING TREES SHALL ONLY BE CARRIED OUT BY
AN EXPERIENCED TREE SURGEON AND APPROVED BY THE ENGINEER.
4. THE MINIMUM DEPTH OF ANY SERVICE UNDER THE LOCATION OF A PROPOSED NEW
ACCESS SHALL BE 850mm TO THE CROWN OF THE DUCT/PIPE.
11. PRIOR TO COMMENCEMENT OF WORKS PLEASE REFER TO THE PRE-TENDER &
CONSTRUCTION PHASE HEALTH AND SAFETY PLANS FOR FURTHER INFORMATION.
5. THE CONTRACTOR WILL ENSURE THAT THE SERVICE BOXES TO THE PUBLIC UTILITIES
PLANT ARE ORIENTATED SO THAT THEY ARE IN LINE WITH ANY BLOCKWORK AREAS,
AVOID DROPPED KERBS (OF ANY TYPE) AND ARE IN GENERAL STRAIGHT TO THE
KERB LINE.
ELEVATION
CL
CL
CL
IL
DROPPED KERB DETAIL FULL HEIGHT KERB DETAIL EDGING DETAIL KERB DETAIL TIE-IN TO EXISTING CARRIAGEWAY BL
400
150
380
400
A 12.09.14 INCLUDED DETAILS AROUND MANHOLES TH GH
NORFOLK GH TH
24 Nov 2014 DRAWING TITLE CHECKED APPROVED
ADOPTABLE HIGHWAY STANDARD GH GH
DETAILS
TYPICAL SECTION THROUGH TACTILE SLAB DETAIL 20141935 SHEET 1 OF 2
JOB No
633
DO NOT SCALE
DROPPED CROSSING SCALE 1:10
CLIENT DRAWING No REVISION
DAVID WILSON HOMES
SCALE 1:10 ROAD GULLY DETAIL HIGHWAY DRAINAGE CATCHPIT 500/060 A
(NTS)
SCALE 1:20