0% found this document useful (0 votes)
41 views

Acbc PSD

This document summarizes test results for bitumen content and particle size distribution of an asphalt concrete binder course sample taken from CH 47+812.5 to CH 48+412.5 LHS (CH48+312.5) fast lane on January 3, 2021. Bitumen content was determined to be 4.69% which meets the specification of 4.84 ± 0.2%. Particle size distribution testing found the sample to comply with job mix and JKR specification limits.

Uploaded by

Kmy Gyo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Acbc PSD

This document summarizes test results for bitumen content and particle size distribution of an asphalt concrete binder course sample taken from CH 47+812.5 to CH 48+412.5 LHS (CH48+312.5) fast lane on January 3, 2021. Bitumen content was determined to be 4.69% which meets the specification of 4.84 ± 0.2%. Particle size distribution testing found the sample to comply with job mix and JKR specification limits.

Uploaded by

Kmy Gyo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DETERMINATION OF BITUMEN CONTENT AND

PARTICLE SIZE DISTRIBUTION


Project Sampling Date : 01 / 03 / 2021

Location CH 47+812.5 to CH 48+412.5 LHS (CH48+312.5)fast lane(1st layer) Testing Date : 01 / 03 / 2021

Section Name

Type of Mix : ACB 28 - BINDER COURSE (S1) Sources

BITUMEN CONTENT SIEVE ANALYSIS


Sive Size weight cum % Specification Limit
No Description (mm) retained(g) % Retained Passing Lower Upper Lower Upper

A Mass of Test Portion 1376.3 JOB MIX JKR


SPEC SPEC
37.5mm Nil Nil 100.0 100 100 100 100
B Mass of filter Ring 18.0 28.0mm Nil Nil 100.0 100 100 80 100
20.0mm 225.6 17.2 82.8 78.5 88.5 72 93
14.0mm 158.7 12.1 70.7 65.3 75.3 58 82
C Mass of Dried Filter Ring After Extraction 20.2 10.0mm 101.0 7.7 63.0 57.1 67.1 50 75
5.0mm 215.1 16.4 46.6 43.6 53.6 36 58
64.5 3.35mm 76.1 5.8 40.8 37.1 45.1 30 52
D Mass of Dried Extracted Aggregate 1309.6 1.18mm 185.0 14.1 26.7 21.9 29.9 18 38
1311.8 425um 137.7 10.5 16.2 13.8 19.8 11 25
150um 86.6 6.6 9.6 6.6 12.6 5 14
E Gain in Filter mass C-B 2.2 75um 55.1 4.2 5.4 3.7 7.7 3 8

PAN 70.8 5.4


F Bitumen Content By mass A - (D+E)100 4.69 P
of Total Mix (%) A
Specification 4.84 ± 0.2 % JKR/SPJ/1988(T-4.3.3)
0.075

0.425
37.5

0.150

14.0

20.0

28.0
1.18

3.35

10.0
5.0

100.0
95.0
90.0
85.0
80.0
75.0
70.0
65.0
60.0
% Passing

55.0
50.0 ACTUAL
45.0 GRADING
40.0
35.0
30.0
25.0
20.0
15.0
JOB MIX
10.0
SPEC
5.0
0.0
0.01 0.1 1 10 100
B.S Sieve Size

Witness By: Verified by :


* GBC/001

Ref. No : NAGA/QC/025
Rev 00

You might also like