Operational Control Procedure Handling of Waste Concrete

Waste concrete procedures for a construction project are outlined. Concrete waste should not be dumped and instead can be reused to make temporary structures, floors, or small items like pots or curbstones. Washwater and slurry from cleaning mixers should also not be discharged on the ground but reused or collected and dried before approved disposal. The document provides controls for properly handling concrete waste and washwater/slurry.

Uploaded by

SAMY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views

Operational Control Procedure Handling of Waste Concrete

Waste concrete procedures for a construction project are outlined. Concrete waste should not be dumped and instead can be reused to make temporary structures, floors, or small items like pots or curbstones. Washwater and slurry from cleaning mixers should also not be discharged on the ground but reused or collected and dried before approved disposal. The document provides controls for properly handling concrete waste and washwater/slurry.

Uploaded by

SAMY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

DOC

OPERATIONAL CONTROL PROCEDURE OCP No

Date :

ACTIVITY: Handling of Waste Concrete

Project : Location :

Sub-Contractor: Nature of

work:
Sl. Performed Checked
No. Controls
by by
1 Waste concrete should not be dumped on ground..
Waste concrete can be used for making temporary structure or flooring.
2

Waste concrete can be used for making Small slabs, Curbstones or Flower
3
pots, etc
After washing the transit mixer, the washed out sludge / slurry should not be
4
discharged on ground.
The washed out sludge / slurry can be used for making the flooring or
5
collected in a designated area for drying.
The dried out sludge /slurry must be disposed for land refilling with the
6
consent of local authority.

Prepared By : Approved By :

SE / SS : Project Manager :

Date : Date :