0% found this document useful (0 votes)
155 views

Production Part Approval Process PPAP

The document discusses Production Part Approval Process (PPAP), which verifies that a supplier's production process meets a customer's requirements. PPAP consists of 18 elements that must be completed to approve a part, including design documentation, a process flow diagram, measurement systems analysis, and dimensional results. PPAP levels range from submitting basic documents to providing on-site process reviews. Completing a PPAP submission confirms the supplier is capable of consistently producing quality parts that meet the customer's specifications.

Uploaded by

tintucin
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
155 views

Production Part Approval Process PPAP

The document discusses Production Part Approval Process (PPAP), which verifies that a supplier's production process meets a customer's requirements. PPAP consists of 18 elements that must be completed to approve a part, including design documentation, a process flow diagram, measurement systems analysis, and dimensional results. PPAP levels range from submitting basic documents to providing on-site process reviews. Completing a PPAP submission confirms the supplier is capable of consistently producing quality parts that meet the customer's specifications.

Uploaded by

tintucin
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

quality-one.

com /ppap/

Production Part Approval Process (PPAP)


⋮ 10/12/2016

PPAP
– Production Part Approval Process –

⇓ Introduction to PPAP

⇓ What is PPAP

⇓ Why Perform PPAP

⇓ When to Perform PPAP

⇓ How to Perform PPAP

Introduction to Production Part Approval Process (PPAP)


Production Part Approval Process (PPAP) is a valuable tool for establishing confidence in component suppliers and
their production processes. In today’s competitive manufacturing environment controlling cost and maintaining a high
level of quality have become vital to a company’s success. Increasing costs of equipment, materials and labor
combined with expanding world markets have resulted in an increase of outsourced parts. Many component parts are
being outsourced to overseas manufacturers. This often results in longer lead times and larger order quantities.
Therefore it has become imperative to provide quality parts that meet the customer’s requirements the first time and
every time. Initially PPAP was utilized by the automotive and aerospace industries. PPAP is now being utilized by
several industries to improve communication and provide quality products. Within the automotive industry the ultimate
resource for PPAP information is the manual published by the Automotive Industry Action Group (AIAG).

What is Production Part Approval Process (PPAP)


PPAP defines the approval process for new or revised parts, or parts produced from new or significantly revised
production methods. The PPAP process consists of 18 elements that may be required for approval of production level
parts. Not all of the elements are required for every submission. There are five generally accepted PPAP submission
levels. The PPAP manual contains detailed information, guidelines and sample documents useful for completing the
process requirements. The resulting PPAP submission provides the evidence that the supplier has met or exceeded
the customer’s requirements and the process is capable of consistently reproducing quality parts.

Why Perform Production Part Approval Process (PPAP)


The PPAP process verifies that the supplier understands all customer engineering design specifications and
requirements and that the process is capable of consistently producing product meeting those requirements during an
actual production run at the quoted production rate. PPAP and other quality tools continue to be implemented into
more industries; therefore it is important to gain an understanding of the PPAP requirements to remain competitive as
a parts supplier.

When to Perform Production Part Approval Process (PPAP)

1/4
A PPAP is required for any new part submission as well as for approval of any change to an existing part or process.
The customer may request a PPAP at any time during the product life. This demands that the supplier must maintain
a quality system that develops and documents all of the requirements of a PPAP submission at any time.

How to Perform Production Part Approval Process (PPAP)


The process of completing a PPAP submission is fairly complex. This detailed process is a collection of key elements
that must be completed to verify that the production process will produce a quality product. Not all of the elements are
always required for a PPAP submission. The particular requirements of the PPAP are usually negotiated during the
quoting process.

PPAP Levels of Submission

The PPAP submission requirements are normally divided into five classifications or levels, as follows:

Level 1 – Part Submission Warrant (PSW) only submitted to the customer


Level 2 – PSW with product samples and limited supporting data
Level 3 – PSW with product samples and complete supporting data
Level 4 – PSW and other requirements as defined by the customer
Level 5 – PSW with product samples and complete supporting data available for review at the supplier’s
manufacturing location

Elements of PPAP

Below is the list of all 18 elements accompanied by a brief description for each element:

1. Design Documentation
Design documentation shall include both a copy of the customer and the supplier’s drawings. The
documentation should also include a copy of the purchase order. In some cases the supplier is required
to supply documentation of material composition.
The purchase order is used to confirm that the correct part is being ordered and that it is at the
correct revision level.
The design engineer is responsible for verifying that the two drawings match and all critical or key
characteristics have been identified.
Material composition information is required to supply evidence that the material used manufacture
the parts meets the customer’s specific requirements.

2. Engineering Change Documentation


If the PPAP is being required due to a request for a change to a part or product, the documentation
requesting and approving the change must be included in the PPAP package. This documentation
usually consists of a copy of the Engineering Change Notice (ECN), which must be approved by the
customer engineering department.
3. Customer Engineering Approval
When required as part of the PPAP, the supplier must provide evidence of approval by the customer
engineering department.
If required, pre-PPAP samples are ordered by the customer for onsite testing. The samples must be
production intent and ship with a waiver so that testing can be done. When testing is complete, the
test engineers will provide an approval form for inclusion in the PPAP submission.
Note: A copy of a “Temporary Deviation” is normally required to submit parts to the customer prior
to a PPAP approval.

4. Design Failure Mode and Effects Analysis


Design Failure Mode and Effects Analysis (DFMEA) is a cross-functional activity that examines design
risk by exploring the possible failure modes and their effects on the product or customer and their
probability to occur. These failure modes can include:
Product malfunctions
Reduced performance or product life
Safety and Regulatory issues
The DFMEA is a living document that should be reviewed and updated throughout the product life cycle.
5. Process Flow Diagram
The Process Flow Diagram outlines the entire process for assembling the component or final assembly in
a graphical manner. The process flow includes incoming material, assembly, test, rework and shipping.
6. Process Failure Mode and Effects Analysis
Process Failure Mode and Effects Analysis (PFMEA) reviews all of the steps in the production process to
identify any potential process quality risk and then document the applied controls. The PFMEA is also a

2/4
living document and should be updated even after the product is in normal production.
7. Control Plan
The Control Plan is an output from the PFMEA. The Control Plan lists all product Special Characteristics
and inspection methods required to deliver products that continually meet the customer quality
requirements.
8. Measurement System Analysis Studies
Measurement System Analysis (MSA) studies will include Gage Repeatability & Reproducibility (GR&R)
studies on measurement equipment used during assembly or quality control checks. Calibration records
for all gages and measurement equipment must be included.
9. Dimensional Results
Dimensional layout of sample parts is required to validate the product meets the print specifications. The
samples should be randomly selected from a significant production run usually at least 30 pieces. Each
dimension on the drawing is measured on the final assembly to make sure that it falls within specification.
The results are recorded in a spreadsheet and included within the PPAP submission.
10. Records of Material / Performance Tests
This element should contain a copy of the Design Verification Plan and Report (DVP&R). The DVP&R is
a summary of every validation test performed on the part. It should list each and every test performed, a
description of how the test was performed, and the results of each test.
This section may also include copies of all the certification documents for all materials (steel, plastics,
etc.) listed on the prints. The material certification shall show compliance to the specific call on the print.
11. Initial Process Studies
Initial process studies will be done on all the production processes and will include Statistical Process
Control (SPC) charts on the critical characteristics of the product. These studies demonstrate that the
critical processes are stable, demonstrate normal variation and are running near the intended nominal
value.
12. Qualified Laboratory Documentation
Qualified laboratory documentation consists of the industry certifications for any lab that was involved in
completing validation testing. This could be for an in-house test lab or any offsite contracted test facilities
that were used for validation or material certification testing.
13. Appearance Approval Report
The Appearance Approval Inspection (AAI) is applicable for components affecting appearance only. This
report verifies that the customer has inspected the final product and it meets all the required appearance
specifications for the design. The appearance requirements could include information regarding the color,
textures, etc.
14. Sample Production Parts
Sample production parts are sent to the customer for approval and are typically stored at either the
customer or supplier’s site after the product development is complete. A picture of the production parts is
usually included in the PPAP documentation along with documentation regarding the location that the
parts are being stored.
15. Master Sample
A master sample is a final sample of the product that is inspected and signed off by the customer. The
master sample part is used to train operators and serves as a benchmark for comparison to standard
production parts if any part quality questions arise.
16. Checking Aids
This is a detailed list of checking aids used by production. It should include all tools used to inspect, test
or measure parts during the assembly process. The list should describe the tool and have the calibration
schedule for the tool. Checking aids may include check fixtures, contour, variable and attribute gages,
models or templates.
MSA may be required for all checking aids based on customer requirements.
17. Customer Specific Requirements
This element of the submission package is where any special customer requirements are contained. For
bulk materials, the customer specific requirements shall be recorded on the “Bulk Material Requirements
Checklist”.
18. Part Submission Warrant
The Part Submission Warrant (PSW) form is a summary of the entire PPAP submission. A PSW is
required for each of part number unless otherwise stated by the customer. The PSW includes:
The reason for submission (design change, annual re-validation, etc.)
The level of documents submitted to the customer
Declaration of part conformity to customer requirements
A section provided for any required explanation or comments
Supplier authorized person signature along with contact information
An area for the customer to indicate disposition of the PPAP

3/4
The PPAP process is a detailed and lengthy process. The PPAP package includes documentation of various multiple
cross-functional tools and documents the ability of the supplier to meet all customer requirements. PPAP provides
customers adequate information to validate that all areas of the design and production processes have been
reviewed thoroughly to ensure that only high quality products will be allowed to ship to the end customer.

PPAP Submission
Levels

PPAP Submission Levels

Learn More About Production Part Approval Process (PPAP)


Quality-One offers Quality and Reliability Support for Product and Process Development through Consulting, Training
and Project Support. Quality-One provides Knowledge, Guidance and Direction in Quality and Reliability activities,
tailored to your unique wants, needs and desires. Let us help you Discover the Value of PPAP Consulting,
PPAP Training or PPAP Project Support.

4/4

You might also like