The document outlines a pier work program with details on construction schedules and tasks for 7 piers over several months. It includes information on reinforcement cutting and bending, fixing, shuttering, concreting and deshuttering for pier starters and lifts. The work is broken down by pier and divided into stages with start and end dates.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
15 views
JB Marg Work Program Pier
The document outlines a pier work program with details on construction schedules and tasks for 7 piers over several months. It includes information on reinforcement cutting and bending, fixing, shuttering, concreting and deshuttering for pier starters and lifts. The work is broken down by pier and divided into stages with start and end dates.