0% found this document useful (0 votes)
153 views

PUMP Testing Sheet

This document is a testing sheet for electrical equipment that includes test results and repair work details. It records information such as the customer, equipment details, test measurements before and after surge tests, comments on inspection results, winding details, and signatures to verify work completed such as dismantling, rewinding, testing, and installation. The equipment was inspected, tested, rewound as needed, and reinstalled after repair work was performed.

Uploaded by

Alan Tan Y R
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
153 views

PUMP Testing Sheet

This document is a testing sheet for electrical equipment that includes test results and repair work details. It records information such as the customer, equipment details, test measurements before and after surge tests, comments on inspection results, winding details, and signatures to verify work completed such as dismantling, rewinding, testing, and installation. The equipment was inspected, tested, rewound as needed, and reinstalled after repair work was performed.

Uploaded by

Alan Tan Y R
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Job No.

:_______________

Start Date: _____________

TESTING SHEET Completion Date:______________


CUSTOMER: DATE RECEIVED
EQUIPMENT: DATE DELIVERED
HP VOLT-STATOR AMP PH CLASS FRAME
KW VOLT-ROTOR AMP HZ MODEL
KVA VOLT-EXC AMP RPM TYPE S/N

TEST RESULTS
PHYSICAL INSPECTION BEFORE AFTER
M SURGE M SURGE
COM / ASSEMBLED ( ) ohm ohm
ohm TEST ohm TEST
STATOR
COMPLETE LOOSE ( )
R-Y

STATOR ONLY ( )
Y-B

ROTOR ONLY ( )
B-R

COUPLING / PULLEY ( )
R-N/E

FAN / HUB / KEY ( )


Y-N/E

BEARING ( )
B-N/E
CLEANLINESS ROTOR TO E

WINDING EXC/ST TO E
CONDITION
BEARING EXC/ROT TO E
CONDITION
SINGLE PHASE MOTOR STARTING COIL

CAPACITOR_____________uF RUNNING COIL


_____________ volt

CURRENT INJECTION TEST (AMPS): R____________ Y____________ B____________ VOLT__________


NO LOAD RUNNING AMPS: R____________ Y____________ B____________ VOLT__________

COMMENTS:_____________________________________________________________________________________

_______________________________________________________________________________________________

______________________________________________________________________________________________

_______________________________________________________________________________________________

_______________________________________________________________________________________________

_______________________________________________________________________________________________
ORIGINAL REWIND TO

NUMBER SLOTS

NUMBER COILS

NUMBER TRUNS/COILS

WIRE SIZE

GROUPING

NUMBER LEADS

TOTAL WT OF COILS (KG)

VERIFIED BY DATE:

THE FOLLOWING WORKS WERE CARRIED OUT ON THE UNIT

OVERHAUL
REWINDING
DISMANTLE UNIT FROM SITE
STEAM/ CHEMICAL CLEANING
REWINDING OF STATOR
REWINDING OF ROTOR
NO LOAD AND STATIC TEST
DYNAMIC BALANCE TEST
ADDITIONAL REPAIRS
PARTS RENEW
OTHERS

CONNECTION

Dismantled Rewind By: Installed By: Tested By:


By:
___________ ___________ ___________
___________ ___________ ___________ ___________
___________ _ _ _
_
Date: Date: Date: Date:
___________ ___________ ___________ ___________
_______ _______ _______ _______

You might also like