INTERNSHIP REPORT
Submitted by
JAYAPRATHA P R (2001064)
BACHELOR OF ENGINEERING
IN
CIVIL ENGINEERING
APRIL 2023
`
BONAFIDE CERTIFICATE
This is to certify that the Internship Report is the Bonafide Work of JAYAPRATHA
(2001064), who carried out the internship under our guidance in IDEAL CONSTRUCTIONS
,Nagercoil during the period of 31-12-2022 to 14-01-2023 .
Certify that the candidate JAYAPRATHA P R (2001064) was guided by us in the 19INT61
INTERNSHIP viva voce examination held on at Coimbatore Institute of
Technology.
ACKNOWLEDGEMENT
I would like to thank IDEAL CONSTRUCTIONS ,Nagercoil for the internship during
the period of 04.01.2023 - 13.01.2023, which I found very useful and helpful to Gain
knowledge.
With the sense profound gratitude, we acknowledge the spirited guidance and unstinted
help we received from my tutor Mrs.S.Kavitha, M.E, . I thank him for never failing assistance
valuable suggestions to the completion of Internship.
I
`
ABSTRACT
The report then discusses my visit to a ready-mix concrete plant, where I learned about
the process of producing high-quality concrete for construction projects. The report describes the
various stages of the concrete production process working procedures,capacity,.
Overall, this internship experience provided me with valuable insights into the
construction industry and the various processes involved in the construction of a steel structure
factory building. The site visits to the ready-mix concrete plant helped to understand the
importance of quality control and attention to detail in construction projects, and the need for
collaboration and communication among all stakeholders.
II
`
The Company has undertaken and completed many prestigious projects in and around
Tamil Nadu and Kerala and numbers of projects are under construction.The company has the
expertise and experience to develop, design, deliver and maintain the buildings and facilities.
It has dedicated and well experienced workforce teams to timely deliver the project to
the best satisfaction of its esteemed clients. Ideal upgrades with the latest tools and machineries
to deliver the projects effectively and efficiently. The company has been successful over decades
and resulted in number of satisfied customers and organizations.
III
`
TABLE OF CONTENTS
2.8 BRICKWORK 11
3 RMC PLANT 18
3.1 COMPONENTS OF THE PLANT 19
3.1.1 RAW MATERIAL DUMP 20
3.1.2 AGGREGATE SEPERATOR BASIN 21
3.1.3 ELEVATED CONVEYOR BELT 22
3.1.4 AGGREGATE STORAGE HOOPERS 23
IV
`
V
`
LIST OF FIGURES
VI
`
VII
`