Pre Commissioning Test Report Control and Protection-Rev-00
Pre Commissioning Test Report Control and Protection-Rev-00
I. GENERAL DETAILS
DETAILS
Project: Sub-Station:
Feeder name: LOA/PO No.:
Make: Type:
Sr. No.: Year of Manufacture:
II. CHECK LISTS OF ELECTRICAL TESTS CARRIED OUT FOR CONTROL & PROTECTION
Performed Test Results
Sl. No. Name of Tests
(Yes/No) (Ok/Not Ok)
1 Individual Relay polarities
2 Functional tests on individual relays
3 Phasor checks of numerical relays
4 Wiring checks as per drawing
5 Checks for control & Protection Scheme
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
All the cable identification tags provided and all cores are provided with
11
Identification ferrules at marshalling box.
Erection completion certificate along with list of outstanding activities
12
reviewed
Note: Details given hereunder is more generic in respect of the basic function of the relay, however if any
other available features in the relay are enabled, details of those functions also will have to be checked and
documented.
Main relays are covered in this document, however, if some other relays are required for system operation,
same may please be added.
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
X [Ohm]
Rg [Ohm]
Time [s]
Trip Time Measurements: on Line Angle 85 deg.(Except for Zone-4)
Make of testing kit :
Date of calibration :
Ambient temperature :
Type of Trip Time
Zone R (Ohm) X (Ohm) Z (Ohm)
Fault (ms)
L1-E
L2-E
L3-E
Zone-1 L1-L2
L2-L3
L3-L1
L1-L2-L3
L1-E
L2-E
L3-E
Zone-1B L1-L2
L2-L3
L3-L1
L1-L2-L3
L1-E
L2-E
L3-E
Zone-2 L1-L2
L2-L3
L3-L1
L1-L2-L3
L1-E
L2-E
L3-E
Zone-3 L1-L2
L2-L3
L3-L1
L1-L2-L3
L1-E
L2-E
Zone-4
L3-E
L1-L2
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
L2-L3
L3-L1
L1-L2-L3
L1-E
L2-E
L3-E
Zone-5 L1-L2
L2-L3
L3-L1
L1-L2-L3
Reach Measurement
(With Tolerance Limit of +/-5%)
R/X Actual & R/X Actual &
Type of Fault R/X Nom. Remarks
Trip Zone Trip Zone
Ph-E (R)
Ph-Ph(R) Reach Check from Z1 to Z2
Ph-E/Ph-Ph (X)
Ph-E (R)
Ph-Ph(R) Reach Check from Z2 to Z3
Ph-E/Ph-Ph (X)
Ph-E (R)
Ph-Ph(R) Reach Check from Z3 to -Z4
Ph-E/Ph-Ph (X)
Ph-E (R)
Ph-Ph(R) Reach Check from Z3 to – Z4
Ph-E/Ph-Ph (X)
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
U>
U>>
Reset Factor
U> Phase-Earth
Phase Pick Up (V) Reset (V) Trip Time Set (Sec) Trip Time Meas. (Sec)
L1-E
L2-E
L3-E
U>> Phase-Earth
Phase Pick Up (V) Reset (V) Trip Time Set (Sec) Trip Time Meas. (Sec)
L1-E
L2-E
L3-E
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Internal Auto Recloser Checked for External Start Initiation thru Binary Inputs as configured: Blocking of
AR as per Binary Input configured checked:
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
7 VD Address
8 Device Address
9 Auxiliary Voltage
10 Nominal Current
11 Nominal Voltage
Transmission line details
SL. NO. Description Parameter Remarks
1 No. of Line Ends
2 Local end Relay No
3 Remote end Relay No
4 Local end CT rated Primary Current
5 Local end CT rated secondary current
6 Remote end CT rated Primary Current
7 Remote end CT rated secondary current
8 Local End Relay Address
9 Remote End Relay Address
10 Line Length
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
L1-E
L2-E
L3-E
L1-L2-L3
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Check Direct Trip send & receive circuit with carrier command.
3 OK/ NOT OK
Verify counter advancement in each channel
i. Auto-reclose Scheme: (Checks applicable for distance protection scheme with auto re-closure
function as well)
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Ch-1 Code-I……… Ch-1 Code-2 ……… Ch-2 Code-I ……… Ch-2 Code-2 ………
SL. NO. CHECK DESCRIPTION STATUS
1 Check individual Code Transfer to be as per scheme OK / NOT OK
2 Ch-1 Code-I OK / NOT OK
3 Ch-1 Code-2 OK / NOT OK
4 Ch-1 Code-3 OK / NOT OK
5 Ch-2 Code-I OK / NOT OK
6 Ch-2 Code-2 OK / NOT OK
7 Ch-2 Code-3 OK / NOT OK
Check if signal through One code is not transferred to another at Remote
8 OK / NOT OK
end
v. CB Troubles
SL. NO. CHECK DESCRIPTION STATUS
Check whether All relays are given elaborative nomenclatures. If not, Paste
1 OK / NOT OK
descriptions (CB LOW Air/Oil pressure, Pole discrepancy etc.)
Check Operations of individual Relays by actuating initiating Contacts from
2 OK / NOT OK
field
3 Check facia/Event Logger Input Contacts for the same OK / NOT OK
i. Differential Protection
SL. NO. CHECK DESCRIPTION STATUS
CT secondary Circuitry Checked & Diff current is Nil by Primary Injection for
1 OK / NOT OK
all Phases
2 Check connection of stabilizing resistance & metrosil (wherever applicable) OK / NOT OK
Check CT Circuits so that summation of same phases (R-R, Y-Y, B-B) is taking
3 place (Sometimes R-B & B-R summations are observed due to wrong OK / NOT OK
Wirings)
If fed from Turret CT’s from both sides of Phase Windings. Check Operate
4 OK / NOT OK
Value/Reset Value/Operate Timing for all phases
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
i.
Check Metering circuit along with Transducers first by secondary injection and there by
primary injection with Standard Voltage & Currents (as per scheme)
SL. NO. CHECK DESCRIPTION STATUS
With Voltmeter Selector switch at various positions
1 OK / NOT OK
R-Y Y-B B-R RN YN BN
2 With Ammeter selector switch at various positions OK / NOT OK
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
RYB
3 MW /MVAR Meters OK / NOT OK
4 Check metering circuits with Primary injection for each phase Separately OK / NOT OK
5 Check for frequency Meters OK / NOT OK
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Synchronizing socket pin configuration must be same for trolly and control
7 OK / NOT OK
panel for all bays
Voltage selection: Verify operating as well as resetting logic (both logic
8 OK / NOT OK
should be mutually inverted)
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
IX. OTHERS
i. OLTC/RTCC for Power Transformer
SL. NO. CHECK DESCRIPTION STATUS
OLTC Operation checked from OK / NOT OK
Local Panel OK / NOT OK
1
Remote Panel OK / NOT OK
Control Panel OK / NOT OK
2 Tap Position Display OK / NOT OK
Correct Tap position display at local panel & at remote display with OK / NOT OK
3
respective OLTC indicator.
4 All Indicating lamps checked OK / NOT OK
5 Tap Position Discrepancy Trip OK / NOT OK
Master/Follower scheme Checked for
6 Master : Transformer-1 OK / NOT OK
Master : Transformer-2 OK / NOT OK
7 Check auto supply changeover feature for OTLC/Transformer (If available) OK / NOT OK
ii. General
SL. NO. CHECK DESCRIPTION STATUS
Many a time, different Auxiliary voltages are used. So Conscious effort is to
1 be put to keep all voltage contacts of relay & other component isolated from OK / NOT OK
each other
In case any changes are to be made in terminal designation, corresponding
2 OK / NOT OK
change in ferruling
In each & every panel & Marshalling Boxes/Kiosks, CT & CVT Circuits must be
3 OK / NOT OK
provided with Disconnecting stud type terminals
4 20% spare TB’s provided in all types OK / NOT OK
5 Close Interlock of CB: In case trip relay is energized, Close command not OK / NOT OK
Sheet No
Document No.
F04(PRJ(SOL)-P-01)/6-1 PRE-COMMISSIONING TEST REPORT FOR
Revision No. 00 CONTROL & PROTECTION PANEL
Date: 30-12-2020
iii. Document regarding spares equipment, O&M manuals etc available at site.
YES NO
iv. After modification, if any, “As built Drawings” are available at site.
YES NO
Sheet No