Homework3-Phung Gia Bao - or - 2153213

1) The document presents solutions to several optimization problems involving binary integer programming (BIP). 2) For problem 12.1-1, the optimal solution is to build factories in cities SF and SD, and a warehouse in SD for a total NPV of $17 million. 3) Other problems cover topics such as assigning tasks to employees, project selection, and production planning. Integer programming and solver tools are used to find optimal solutions meeting given constraints.

Uploaded by

BẢO PHÙNG GIA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views35 pages

Homework3-Phung Gia Bao - or - 2153213

1) The document presents solutions to several optimization problems involving binary integer programming (BIP). 2) For problem 12.1-1, the optimal solution is to build factories in cities SF and SD, and a warehouse in SD for a total NPV of $17 million. 3) Other problems cover topics such as assigning tasks to employees, project selection, and production planning. Integer programming and solver tools are used to find optimal solutions meeting given constraints.

Uploaded by

BẢO PHÙNG GIA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 35

TRƯỜNG ĐẠI HỌC BÁCH KHOA

ĐẠI HỌC QUỐC GIA TP HỒ CHÍ MINH

-----🙞🙜🕮🙞🙜-----

HOMEWORK 3

SUBJECT

INTRODUCTION TO OPERATION RESEARCH

CLASS CC01 --- HK 222

Instructor: Assoc. Prof. Ho Thanh Phong

NAME MSSV
Phùng Gia Bảo 2153213

Hồ Chí Minh city – 2023


PROBLEM 12.1-1

SOLUTION

Solution:

a) Decision Variables:

xj = 1 if factory is built , j = 1,2,3

0 if factory is not built

yj = 1 if factory is built , j = 1,2,3

0 if factory is not built

Objective Function:

Maximize Z = 8 x 1+ 5 x 2 +7 x 3+ 6 y 1+ 4 y 2 +5 y 3
Constraints:

6 x 1+ 3 x 2 + 4 x 3+5 y 1 +2 y 2+ 3 y 3 ≤ 10

y1 + y2 + y3 ≤ 1

y 1−x 1 ≤ 0

y 2−x 2 ≤0

y 3−x 3 ≤ 0

xj, yj are binary variables.

b & c) Table in Excel:

+ We call “Solver” to solve the problem:


Result:
Therefore, the total NPV is maximized at $17 million when factories are built in
cities SF and SD, and the warehouse is built in SD.

PROBLEM 12.1-2
SOLUTION

a) Mj = 1 if j does marketing,
0 if j does not do marketing

Cj = 1 if j does cooking,

0 if j does not do cooking

Dj = 1 if j does dishwashing,

0 if j does not do diswashing

Lj = 1 if j does laundry,

0 if j does not do laundry

For j = E (Eve), S (Steven).

+ Formulate a BIP as shown below:

Minimize T = 4.5ME + 7.8 CE + 3.6DE + 2.9LE + 4.9MS + 7.2CS + 4.3DS + 3.1LS

ME + CE + DE + LE = 2

MS + CS + DS + LS = 2

ME + MS = 1; CE + CS = 1

DE + DS = 1; LE + LS = 1

ME, MS, CE, CS, DE, DS, LE, LS binary.

b - c)
Result:
Therefore, the optimal solution is:

- Eve will do Marketing and Dishwashing

- Steven will do Cooking and Laundry

- Total hours spent will be 18.4 hours.


PROBLEM 12.1-3.

SOLUTION

a) Formulate a BIP as shown below:


Maximize Z = a + 1.8b + 1.6c + 1.8d +1.4e

Subject to

6 a+ 12b +10 c+ 4 d +8 e ≤20

b & c)
Call “solver” to solve the problem:

Result:
PROBLEM 12.1-4.

SOLUTION

a) Formulate a BIP model


Maximize Z = 15X1 + 12X2 + 16X3 + 18X4 + 9X5 + 11X6

S.t:

38X1 + 33X2 + 39X3 + 45X4 + 23X5 + 27X6 <= 100


X1 + X2 <= 1
X3 + X4 <= 1
X3 <= X1 + X2
X4 <= X1 + X2

b) Solution by POM-QM

the Maximum Value will be 40 and Investing in Opportunity 1, 3, 5


PROBLEM 12.1-6.

SOLUTION

a) Formulate an IP model

Maximize Z =130X1 + 150X2


3.2X1 + 2.4X2 <= 16
2X1 + 3X2 <= 15
X1, X2 Integer

b) Graphical approach to solve by POM-QM


c) Solution

The solution is X2 = 5, and the Maximum Value is 750.


PROBLEM 12.3-1.

SOLUTION

a) Formulate a mixed BIP model

M is a very large number


Maximize Z = 70y1 - 50000x1 + 60y2 - 40000x2 + 90y3 - 70000x3 + 80y4 - 60000x4;
x1 + x2 + x3 + x4 <= 2;
x3 <= x1 + x2;
x4 <= x1 + x2;
5y1 + 3y2 + 6y3 + 4y4 <= 6000 + Mx5;
4y1 + 6y2 + 3y3 + 5y4 <= 6000 + M(1-x5);
y1 <= Mx1;
y2 <= Mx2;
y3 <= Mx3;
y4 <= Mx4;
x1, x2, x3, x4 binary.

b) Solution by Lingo

The Maximun Profit will be 80000 with the 2000 Product 2 are produced.
PROBLEM 12.3-2.

SOLUTION
|x 1−x 2|=0 → x 1−x 2=0 ;

|x 1−x 2|=3 → x 1−x 2=± 3 ;

|x 1−x 2|=6 → x 1−x 2=± 6 ;

x 1−x 2=0 x 1+3 x 2−3 x 3+6 x 4−6 x 5

x1, x2, x3, x4, x5 is binary

PROBLEM 12.3-3.

SOLUTION
1) 3 x 1−x 2−x 3+ x 4 ≤ 12+ y 1 M
x 1+ x 2+ x 3+ x 4 ≤ 15+ M ( y 1−1)
Y1 is a binary number
2) 2 x 1+5 x 2−x 3+ x 4 ≤ 30+ My 2
−x 1+3 x 2+5 x 3+ x 4 ≤ 40+ My 3
3 x 1−x 2+3 x 3−x 4 ≤ 60+ My 4
2 ≤ y 2+ y 3+ y 4
Y1,y2,y3,y4 is binary

PROBLEM 12.3-4.
a) Let and be binary variables that y1 & y2 indicate whether or not toys 1 and 2 are
produced. Let and be the number of toys x1 and x2 that are produced. Also, let be z
0 if factory 1 is used and 1 if factory 2 is used.
Maximize: 10x1 + 15x2 – 50000y1 – 80000y2
Subject to:
X1 ≤ My1
X2 ≤ My2
1 1
x 1+ x 2 ≤ 500+ Mz
50 40
1 1
x 1+ x 2 ≤ 700+ M (z−1)
40 25
X1, x2 ≥ 0
Y1, y2, z is binary
c) Coding and result:
MAX = 10*X1 + 15*X2 - 50000*Y1 - 80000*Y2 ;
X1 <= 100000*Y1;
X2 <= 100000*Y2;
1/50 * X1 + 1/40* X2 <= 500 + 100000*Z;
1/40*X1 + 1/25*X2 <= 700 + 100000*(1-Z);
@GIN(X1);
@GIN(X2);
@BIN(Y1);
@BIN(Y2);
@BIN(Z);
Objective value: 230000.0
Variable Value
X1 28000.00
X2 0.000000
Y1 1.000000
Y2 0.000000
 Z = 1.000000
PROBLEM 12.3-6.

SOLUTION
a) Let: X1 = Y11 + 2Y12
X2 = Y21 + 2Y22
Max: Z = X1 + 5X2 = Y11 + 2Y12 + 5Y21 + 10Y22
Subject to Y11 + 2Y12 + 10Y21 + 20Y22 <= 20
Y11 + 2Y12 <= 2
Yij binary, for I, I = 1, 2
b)
When input to POM, symbolize X1=Y11, X2=Y12, X3=Y21, X4=Y22, X5=X1,
X6=X2
 Max: X1 + 2X2 + 5X3 + 10X4
X1 + 2X2 + 10X3 + 20X4 <= 20
X1 + 2X2 <= 2
- X1 - 2X2 + X5 = 0
- X3 - 2X4 + X6 = 0
Solution:
PROBLEM 12.4-1.

Recalled from 12.3-7:


SOLUTION

a) Yij = {1 ,if xi= j(0 ,produce j units of i)


otherwise
For i=1, 2, 3 and j=1, 2, 3, 4, 5.
Max: Z = –Y11 + 2Y12 + 4Y13 + Y21 + 5Y22 + Y31 + 3Y32 + 5Y33 +
6Y34 + 7Y35
Subject to:
Y11 + Y12 + Y13 <= 1
Y21 + Y22 <= 1
Y31 + Y32 + Y33 + Y34 + Y35 <=1
Y11 + 2Y12 + 3Y13 + 2Y21 + 4Y22 + Y31 + 2Y32 + 3Y33 + 4Y34 + 5Y35
<= 5
With Yij binary
b) When input data to POM, symbolize X1 = Y11, X2 = Y12, X3 = Y13, X4 =
Y21, X5 = Y22, X6 = Y31, X7 = Y32, X8 = Y33, X9 = Y34, X10 = Y35.
 Max: - X1 + 2X2 + 4X3 + X4 + 5X5 + X6 + 3X7 + 5X8 + 6X9 +
7X10
X1 + X2 + X3 <= 1
X4 + X5 <= 1
X6 + X7 + X8 + X9 + X10 <= 1
X1 + 2X2 + 3X3 + 2X4 + 4X5 + X6 + 2X7 + 3X8 + 4X9 + 5X10 <= 5
Solution:

c) Yij = {01, otherwise


, if xi ≥ j

For i = 1, 2, 3 and j = 1, 2, 3, 4, 5.
Max: Z = –Y11 + 3Y12 + 2Y13 + Y21 + 4Y22 + Y31 + 2Y32 + 2Y33 + Y34
+ Y35
Subject to:
Y13 <= Y12 <= Y11
Y22 <= Y21
Y35 <= Y34 <= Y33 <= Y32 <= Y31
Y11 + Y12 + Y13 + 2Y21 + 2Y22 + Y31 + Y32 + Y33 + Y34 + Y35 <= 5
With Yij binary
d) When input data to POM, symbolize X1 = Y11, X2 = Y12, X3 = Y13, X4 =
Y21, X5 = Y22, X6 = Y31, X7 = Y32, X8 = Y33, X9 = Y34, X10 = Y35.
 Max: - X1 + 3X2 + 2X3 + X4 + 4X5 + X6 + 2X7 + 2X8 + X9 + X10
- X1 + X2 <= 0
- X2 + X3 <= 0
- X4 + X5 <= 0
- X6 + X7 <= 0
- X7 + X8 <= 0
- X8 + X9 <= 0
- X9 + X10 <= 0
X1 + X2 + X3 + 2X4 + 2X5 + X6 + X7 + X8 + X9 + X10 <= 5
Solution:
PROBLEM 12.4-3.

Information from 3.1-11:

SOLUTION
a) Introduce the auxiliary binary variables Y1, Y2 and Y3 to represent positive
production levels
Max Z = 50X1 + 20X2 + 25X3
Subject to:
9X1 + 3X2 + 5X3 <= 500
5X1 + 4X2 <= 350
3X1 + 2X3 <= 150
X3 <= 20
X1 <= MY1, X2 <= MY2, X3 <= MY3
Y1 + Y2 + Y3 <= 2
X1, X2, X3 >= 0
Y1, Y2, Y3 binary
b) When input data in POM, symbolize X1 = X1, X2 = X2, X3 = X3, X4 = Y1, X5 =
Y2, X6 = Y3, M = 999
 Max 50X1 + 20X2 + 25X3
9X1 + 3X2 + 5X3 <= 500
5X1 + 4X2 <= 350
3X1 + 2X3 <= 150
X3 <= 20
X4 + X5 + X6 <= 2
X1 - 999X4 <= 0
X2 - 999X5 <= 0
X3 - 999X6 <= 0
Solution:
PROBLEM 12.4-4.

SOLUTION
a) When x1 + x2 <= 3 => x1, x2 = 0;1;2;3.

For i=1,2 and j = 1,2,3.


+ Suppose: x1, x2 = 0;1;2;3, then in Maximizal Z solution we have:
3y11+8 y12+9 y13 + 9y21+ 24y22+ 9y23 = Z
+ Also, we have only 1 solution for x1, x2 then:

+ Because x1 + x2 <= 3 then we have the following constrants:

b) The solution:

 y11 = 0 except y11 = y22 = 1 => x1 = 1, x2 = 2, Z= 27.


c) Because:

For i=1,2 and j = 1,2,3.


From x1, x2 = 0;1;2;3, we can have optimal solution:
Maximize Z = 3 y 11 +5 y 12+ y 13+9 y 21 +15 y 22−15 y 23
y 13 ≤ y 12 ≤ y 11

y 23 ≤ y 22 ≤ y 21

y 11 + y 23 ≤1

y 12+ y 22 ≤ 1

y 13 + y 21 ≤ 1

d)

-> y 11 = y 21= y 22 = 1 -> x 1=1 ; x2=2-> Z = 27.


PROBLEM 12.4-5

SOLUTION

a)
Min = 3 x 12+6 x 13+ 6 x 24+5 x 25 +4 x 34 +3 x 35+3 x 46 +2 x56
x 12+ x 13=1

x 25+ x 24 + x 35 + x34 =1

x 46 + x 56=1

x 24 + x 25−x12=0

x 34 + x 35− x13=0

−x 24−x 34 + x 46=0

−x 35−x 25+ x 56=0

x IJ is binary
b) Coding:

RESULT
 x 12=x 25=x56=1 => Z = 10.
Path: 1 -> 2 -> 5 -> 6.

PROBLEM 12.4-6.
SOLUTION

+ Cost: cj = [6 4 7 5 4 6 5 3 7 6];

[ ]
1 0 0 0 1 0 0 0 1 0
0 2 0 1 0 2 0 0 2 2
0 0 3 3 0 0 3 0 3 0
2 0 0 0 0 1 0 1 0 0
+ xij = 0 0 2 2 0 3 0 0 0 0 ; yj = 0 or 1.
0 1 0 0 2 0 0 0 0 0
3 0 0 0 0 0 1 2 0 3
0 0 1 0 3 0 0 0 0 1
0 3 0 4 0 0 2 0 0 0

10

Minimize: Z = ∑ c J y J ;
J =1

10

Subject: ∑ xij y j >= 1 , for i=1,..,9 ;


J =1

10

∑ y J =3.
5=1

Yij = 0 or 1.
b)Coding:
Solution:
 Y4 = Y5 = Y8 = 1 -> Assign sequence 4, 5, 8 to a crew.