Form CS-28 Erection Checklist

This document is a checklist for erecting a building structure. It contains 10 sections to inspect various stages of construction, from civil works like foundations to sheeting walls and roofing. The checklist ensures anchor bolts are properly placed, frames are plumb and braced, insulation and sheeting are correctly installed, gutters and accessories like skylights are fitted properly, and the overall work is cleaned upon completion. Once fully checked, the erection engineer signs off to confirm the structure meets specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
363 views

Form CS-28 Erection Checklist

This document is a checklist for erecting a building structure. It contains 10 sections to inspect various stages of construction, from civil works like foundations to sheeting walls and roofing. The checklist ensures anchor bolts are properly placed, frames are plumb and braced, insulation and sheeting are correctly installed, gutters and accessories like skylights are fitted properly, and the overall work is cleaned upon completion. Once fully checked, the erection engineer signs off to confirm the structure meets specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

ERECTION CHECK LIST

Page 1 of 4

Arcedges Building India LLP


Job number:
Client name:
Site location:
Name & sign of Erection Engineer:
Date of final inspection:
I. CIVIL WORKS :
1 Does anchor bolt size comply with for construction drawing issued
by Arcedges ?
2 Check on anchor bolt / template orientation
3 Are the dimensions correct bolt to bolt on the base ?
4 Are the dimensions correct center to centre of grid lines (or with
allowable tolerance)
5 Is the edge distance from bolt to concrete correct ?
6 Is the sheeting notch in the concrete correct ?
7 Are the bases or edge beams within acceptable levels ?
8 Is the concrete quality sound and adequate ?
9
10
II. FRAME ERECTION :
1 Is the roof and wall bracing in place?
2 Are back up plates fitted where required, at bracing locations ?
3 Is the bracing tight ?
4 Are the flange braces fixed on columns & rafters ?
5 Are the high strength bolts installed in correct location ?
6 Is the washer installed with the HSB ?
7 Is the HSB thread projection correct ?
8 Are the HSB’s correctly tightened ?
9 Are all purlin bolts installed ?
10 Are all purlin clips fitted where required ?
11 Are eave strut plates fitted where required ?
12 Are purlins straight and aligned ?
13 Are the main frames plumbed and aligned within allowable tolerance ?
14 Are crane beams braced and aligned ?
15 Are stoppers fitted on crane beams ?
ERECTION CHECK LIST
Page 2 of 4

16 Have crane columns been levelled and grouted ?


17 Are all bolts (HSB & MB) in place on mezzanine (before concreting) ?
18 Is touch-up painting completed ?
19
20
III. SHEETING AND TRIMMING :
1 Is the base angle securely fastened to concrete ?
2 Are the girts and purlins temporarily supported during sheeting ?
3
4
IV. INSULATION :
1 Is the fibreglass insulation cut to length and fixed correctly with double
faced tape ?
2 Has the insulation been properly staped at the side tabs ?
3 Has the insulation been correctly joined (wide spans) ?
4 Is the insulation taught and not sagging ?
5 Have any tears in insulation been repaired with patching tape ?
6
7
V. SHEETING - VERTICAL :
1 Are sheets correctly lapped ?
2 Are the sheets plumb ?
3 Are the sheets fastened in the correct location ?
4 Are the sheets fastened with the correct length of fastener ?
5 Have side lap fasteners been fitted as indicated on drawings ?
6 Have corner trims been correctly fitted with correct number of
fasteners ?
7
8
VI. SHEETING - ROOFING :
1 Are the sheets correctly lapped-sides and ends ?
2 Is the tail-line of sheeting straight ?
3 Has endlap mastic been installed ?
4 Has roof been cleaned ?
ERECTION CHECK LIST
Page 3 of 4

5 Have correct fasteners been used ?


6 Are the fasteners in the correct location ?
7 Are the roof panels double screwed at end laps ?
8 Are foam closures installed where shown ?
9 Is the gable trim correctly fixed and aligned ?
10
11
VII. GUTTERS - EAVE :
1 Have eave gutters been sealed at overlaps and correct number of rivets
installed at the joint ?
2 Have end caps been sealed and fitted ?
3 Have down pipe outlets been sealed and rivetted ?
4 Are the down pipes plumb and correctly fastened ?
5
6
VIII. GUTTERS - VALLEY :
1 Are the splices correctly sealed and bolted / welded & checked for
leakages?
2 Are the outlets sealed ?
3
4
IX. ACCESSORIES :
1 Are all trims around accessories and framed openings fixed ?
2 Are skylights installed and framed (if roof insulated) ?
3 Are ridge vents fastened according to drawing ?
4 Are ridge vents in line ?
5 Have foam closures been fitted under ridge vents ?
6 Has the roof sheets been crimped upwards at the ridge vent ?
7 Have end flashings been fitted at ridge vents ?
8 On continuous ridge vents has the connection flashing been installed ?
9 Are louvers installed as per the drawings & with specified mesh /
net?
14
15
ERECTION CHECK LIST
Page 4 of 4

X. GENERAL :
1 Has the work been cleaned-off, specially roof sheeting & gutters ?
2 Is sheeting straight, plumb and aligned ?
3 Are sheet ribs aligned where appropriate (eg. soffit to wall) ?
4 Has all touch-up been done on frame and sheets ?
5 Are all trims installed according to details ?
6
7

Any additional notes by erection engineer / manager:

Note: Blank spaces are given to fill up any additional points identified.