Substation Layout

The document contains general notes for a Kahramaa substation project. It lists 8 notes providing requirements such as ensuring crane access is always available, that the MV room floor be epoxy coated and very smooth, and that the consultant must contact Kahramaa's civil unit before construction starts to get permission for supervision of all construction stages. Dimensions are to be verified on site and any discrepancies reported to the supervising engineer.

Uploaded by

Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
618 views

Substation Layout

The document contains general notes for a Kahramaa substation project. It lists 8 notes providing requirements such as ensuring crane access is always available, that the MV room floor be epoxy coated and very smooth, and that the consultant must contact Kahramaa's civil unit before construction starts to get permission for supervision of all construction stages. Dimensions are to be verified on site and any discrepancies reported to the supervising engineer.

Uploaded by

Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Notes

KAHRAMAA GENERAL NOTES


A Do not scale off this drawing - work to figured
1. CRANE, EQUIPMENT AND CABLE ACCESS TO THE dimensions only.
SUBSTATION TO BE AVAILABLE ALWAYS . B Check all dimensions and levels on site before commencing
2. NO SERVICES INSIDE SUBSTATION. work.
3. MV ROOM FLOOR FINISH TO BE EPOXY COATED C Report any discrepancies to the supervising engineer
4. FINISHED FLOOR LEVEL TO BE VERY SMOOTH AND and obtain instructions.
D Rising arm barriers to be provided at all site entrances.
MAXIMUM.
5. CONSULTANT (NOT CONTRACTOR) TO CONTACT E Perimeter Road alignments and levels subject to final
KAHRAMAA CIVIL UNIT BEFORE STARTING THE As-Built information .
CONSTRUCTION OF SUBSTATION WITH ORIGINAL F Locations of soakaways to be under paved and/or
landscaped areas.
APPROVED DRAWINGS (COPIES ARE NOT
G Road kerbs taken as 150mm above adjacent road level
ACCEPTED) FOR GETTING PERMISSION FROM KM TO
Crossfalls on bitmac roads 1:40 (2.5%).
SUPERVISE ALL CONSTRUCTION STAGES OF
H Crossfalls on external paths and paved areas minimum
SUBSTATION (FORM OF CONSULTANT SUPERVISION
1:100(1%).
OF CONSTRUCTION TO BE USED IN THIS REGARD).
6. SUBSTATION ROOM'S HEIGHT IS 3.65M MINIMUM.
7. UNDER TAKING OF RESPONSIBILITY OF THE
STRUCTURAL DESIGN IS TO BE SUBMITTED TO
KAHRAMMA AT BUILDING PERMIT STAGE. PLEASE
REFER TO BP APPLICATION FORM.
8. ELEVATION DRAWING TO BE SUBMITTED TO
KAHRAMAA BEFORE STARTING THE CONSTRUCTION
OF THE SUBSTATION.
9. SUBSTATION LEVELS BASED ON THE FRONT ROAD
LEVEL = +/- 0.00.
10. LV ROOM DETAILS TO BE DESIGNED & CHECKED BY
THE CONSULTANT.
11. RANSFORMER ROOM DETAILS TO BE DESIGNED &
CHECKED BY THE CONSULTANT (IF THE
TRANSFORMER IS DRY TYPE).
12. ELEVATION OF THE SUBSTATION MUST BE
MATCHING WITH THAT OF THE MAIN BUILDING
(DESIGN, COLOR, ETC).

key plan
6450
350 350
5750
7050

1050 6650 200

A A
500 800 500 750

500 800 500 800 500 750

+100
EAU

350

AC
+32.000 E 09.06.14
Sub station revised and layout modified.

Fall
3050
D Minor revisions 05.06.14
4 4
600 C Revised configuration per Kahraama 04.06.14
Fall requirements
6100

500 +125
+50 B Kahraama standard Details added 08.04.14
6100

6100
1450

5900

A Fire Pump Room size increased to 6.200m, 23.03.14


FIRE PUMPS Diesel tank size modified to cylinder
3050

+32.000 300 Eaves


4.0m x 2.0m and Irrigation tank size modified
Fall
overhang
to 3.0m x 2.0m.
1900

1250

+100 no. description date


200

B B revisions
AC
+31.750
Fall

Client
900
4400

T.O.P T.O.P
+31.680 +36.750 +36.750 \\Ps-1\job files\2013 Jobs\13.33 Spacemaker Qatar University Office Accommodation\16 Drawings\Current\Logos\qu_logo.jpg
5200

5200

5550

5550
1500
1675

600

Fall
500

+125
+50 Project
1955
1850

4700 1000 100


Qatar University Office Building
350

23850

24450
C C
500 800
1175

800

2100

200 7900 Title


800

SUB-STATION - GROUND &


Fall

2000 1100 2100 1500


4350

2400

4050

4400

4400
1150

+100
ROOF PLAN , DETAILS
18350

9550
800

Structural & MEP Consultant Fire & Life Safety Consultant


Concrete 800 1050
975

350
800

Fall

AC
200

D D
\\Ps-1\job files\2013 Jobs\13.33 Spacemaker Qatar University Office Accommodation\16 Drawings\Current\Logos\white_young_arabic_logotype.jpg \\Ps-1\job files\2013 Jobs\13.33 Spacemaker Qatar University Office Accommodation\16 Drawings\Current\Logos\design confidence logo.png
200

Steps 900 800


1500

2250

Contractor
1000

600

Fall
500
7100

7450

7450

+125
+50
0

8300
6300
4600

4400

Consultant
Fall

+31.450
+32.000

E +100 E
350

+31.600 +31.550
G1 200 200 Qatar University Office Building Substation
550 1500 3300 1200 1150
0 8300
Substation No. - 24987
350 7000 350
7700 PO Box 6204; Doha; State of Qatar
Tel. 4413 0366/ 0803 fax. 4413 0419
1 2 3 4 1 2 3 4 e-mail. [email protected]
date drawn designed scale
GROUND PLAN ROOF PLAN June 2014 - - 1: 100 @ A1
job no. status/floor/drawing no. plot date sheet rev.
Scale : 1/100 Scale : 1/100
13.33 LX.02.2 09.06.14 1/1 E

You might also like