Substation Layout
Substation Layout
key plan
6450
350 350
5750
7050
A A
500 800 500 750
+100
EAU
350
AC
+32.000 E 09.06.14
Sub station revised and layout modified.
Fall
3050
D Minor revisions 05.06.14
4 4
600 C Revised configuration per Kahraama 04.06.14
Fall requirements
6100
500 +125
+50 B Kahraama standard Details added 08.04.14
6100
6100
1450
5900
1250
B B revisions
AC
+31.750
Fall
Client
900
4400
T.O.P T.O.P
+31.680 +36.750 +36.750 \\Ps-1\job files\2013 Jobs\13.33 Spacemaker Qatar University Office Accommodation\16 Drawings\Current\Logos\qu_logo.jpg
5200
5200
5550
5550
1500
1675
600
Fall
500
+125
+50 Project
1955
1850
23850
24450
C C
500 800
1175
800
2100
2400
4050
4400
4400
1150
+100
ROOF PLAN , DETAILS
18350
9550
800
350
800
Fall
AC
200
D D
\\Ps-1\job files\2013 Jobs\13.33 Spacemaker Qatar University Office Accommodation\16 Drawings\Current\Logos\white_young_arabic_logotype.jpg \\Ps-1\job files\2013 Jobs\13.33 Spacemaker Qatar University Office Accommodation\16 Drawings\Current\Logos\design confidence logo.png
200
2250
Contractor
1000
600
Fall
500
7100
7450
7450
+125
+50
0
8300
6300
4600
4400
Consultant
Fall
+31.450
+32.000
E +100 E
350
+31.600 +31.550
G1 200 200 Qatar University Office Building Substation
550 1500 3300 1200 1150
0 8300
Substation No. - 24987
350 7000 350
7700 PO Box 6204; Doha; State of Qatar
Tel. 4413 0366/ 0803 fax. 4413 0419
1 2 3 4 1 2 3 4 e-mail. [email protected]
date drawn designed scale
GROUND PLAN ROOF PLAN June 2014 - - 1: 100 @ A1
job no. status/floor/drawing no. plot date sheet rev.
Scale : 1/100 Scale : 1/100
13.33 LX.02.2 09.06.14 1/1 E