0% found this document useful (0 votes)
237 views

Daily Observation Report

The daily HSE report summarizes safety observations from a construction site. It lists 3 safety officers and their departments. There are 8 observations recorded, noting the time, risk level, location, department, and description. Each observation may include immediate corrective actions taken. The report discusses the daily tool box talk topic and includes distributions and approvals from HSE staff, manager, site manager, and project managers.

Uploaded by

Faisal Raja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
237 views

Daily Observation Report

The daily HSE report summarizes safety observations from a construction site. It lists 3 safety officers and their departments. There are 8 observations recorded, noting the time, risk level, location, department, and description. Each observation may include immediate corrective actions taken. The report discusses the daily tool box talk topic and includes distributions and approvals from HSE staff, manager, site manager, and project managers.

Uploaded by

Faisal Raja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

DAILY HSE REPORT

Date:
Site/Location:

Project Name:
Total Manpower:

HSE Officers:
1
2
3

Immediate
Risk Corrective
S/No. Date Time Status
(H/M/L)
Location Department Description of Observation
Action (If
taken)

6
7

Topic Discussed During tool box talk:

Distribution 1: Construction
SE REPORT

Observer's
Corrective/Preventive Action Target Date Action party
Name
Make sure that your earning is from valid source

2: Kyung Dong 3:
Doc. Ref. No.___
HSE STAFF HSE.MGR S.M D.PM P.M

APPROVAL
P.M
DAILY HSE REPORT
Date:
Total Manpower: Project Name: Cherat Cement Quarry Site.
Site/Location:
HSE Officer: Site Manager: DPM: HSE Manager :

Corrective/Preventive
Risk Immediate Corrective Action Target Action
Time Status Location Department Description of Observation Action/
(H/M/L) (If taken) Date party
recommendations

Topic Discussed During tool box talk: