DAARWIN - Reducing Geotechnical Uncertainty by Connecting Numerical Models With Monitoring Data
DAARWIN - Reducing Geotechnical Uncertainty by Connecting Numerical Models With Monitoring Data
SAALG GEOMECHANICS
SAALG GEOMECHANICS
PARTNER OF
SAALG & MYSELF
W H O W E A R E
DAARWIN
WHO TRUST ON US
ASSET OWNERS
CONTRACTORS
ENGINEERING FIRMS
TA B L E O F C O N T E N T S
Introduction
Problem: Geotechnical Uncertainty
Traditional Solution
Backanalysis
Genetic Algorithms (optimization technique)
Disconnected
Project Lifecycle
Sliding
Micrometer
Inclinometer Inclinometer
K0
Eurref [kN/m2]
INTRODUCTION
G E N E T I C A L G O R I T H M S ( O P T I M I Z A T I O N T E C H N I Q U E )
Initial Generation
K0
Eurref [kN/m2]
INTRODUCTION
G E N E T I C A L G O R I T H M S ( O P T I M I Z A T I O N T E C H N I Q U E )
Second Generation
K0
Eurref [kN/m2]
INTRODUCTION
G E N E T I C A L G O R I T H M S ( O P T I M I Z A T I O N T E C H N I Q U E )
Third Generation
K0
Eurref [kN/m2]
INTRODUCTION
G E N E T I C A L G O R I T H M S ( O P T I M I Z A T I O N T E C H N I Q U E )
Fourth Generation
K0
Eurref [kN/m2]
INTRODUCTION
G E N E T I C A L G O R I T H M S ( O P T I M I Z A T I O N T E C H N I Q U E )
Final Generation
K0
Eurref [kN/m2]
TA B L E O F C O N T E N T S
Introduction
Problem: Geotechnical Uncertainty
Traditional Solution
Backanalysis
Genetic Algorithms (optimization technique)
Cathedral
Large underground excavation under water conditions in the downtown of Girona City
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
Fill Material
Alluvial
Eurref Cohesive
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
Plaxis 2D Plaxis 3D
T H E G I R O N A H I G H -S P E E D T R A I N STAT I O N
P R O J E C T - M E T H O D O L O G Y - R E S U L T S
NUMERICAL MODEL
INCLINOMETER
(using design soil parameters)
(sensor that measures horizontal
displacements depth-wise)
NO MATCH
PGA
PLA
6 Different backanalysis, 1 for each excavation phase
PGB
PLB
NO MATCH MATCH
≈600m
Exc_7
5.621.080,93 € 3.570.529,22 €
Box 1
E XC AVAT I O N B OX I N U K
I N C O L L A B O R A T I O N W I T H M O T T M A C D O N A L D
E XC AVAT I O N B OX I N U K
I N C O L L A B O R A T I O N W I T H M O T T M A C D O N A L D
Backanalysis
E XC AVAT I O N B OX I N U K
I N C O L L A B O R A T I O N W I T H M O T T M A C D O N A L D
Section 01
Section 02
COMMERCIAL BUILING IN SINGAPORE
I N C O L L A B O R A T I O N W I T H K A J I M A
Inclinometer
Section 01
Section 02
COMMERCIAL BUILING IN SINGAPORE
I N C O L L A B O R A T I O N W I T H K A J I M A
Final population of 4398 good individuals out of a population of 4925 individuals after 50 generations
COMMERCIAL BUILING IN SINGAPORE
I N C O L L A B O R A T I O N W I T H K A J I M A
Final population of 4939 good individuals out of a population of 5430 individuals after 50 generations
COMMERCIAL BUILING IN SINGAPORE
I N C O L L A B O R A T I O N W I T H K A J I M A
Final population of 3682 good individuals out of a population of 5147 individuals after 50 generations
TA B L E O F C O N T E N T S
Introduction
Problem: Geotechnical Uncertainty
Traditional Solution
Backanalysis
Genetic Algorithms (optimization technique)
Check the assumption that the numerical model is representing the physics of the problem
Make sure that the monitoring data is showing consistent values before using them
Have a clear vision of how is the construction site every day that you have measurements
(correlate calculation phases with construction phases)
To effectively implement changes derived from a backanalysis, better to plan them in advance
(during design). Al stakeholders must be involved.
THANK YOU FOR YOUR ATTENTION
Geotechnical Society of Singapore SEMINAR, 20th July 2023
PARTNER OF