TRIO 330 Poster.
TRIO 330 Poster.
TRIO 330
• Only use the required number of ties. Unused tie holes
must be sealed with plugs ø 20/24, item no. 030300.
60 72 • More information can be found in the TRIO assembly
instructions.
72
60
9.
Without exception, valid safety regulations must be observed
Extremely cost-effective 3.30 m high panel formwork in those countries where our products are used.
WDA 10
Ties
Permissible fresh concrete pressure for
60
Basic rule: Ties ➊ ➋ ➍ the TRIO 330. Elements certified
TRIO 330 panels have an asymmetrical for extended formwork according to guidelines issued by the
72 tie arrangement. When placing the Güteschutzverband Betonschalungen
elements, the tie hole ➌ must be in (Quality Protection Association for
the upper position. Wrong application Concrete Formwork), GSV.
results in more ties being used than is
necessary. 82.5 kN/m2 triangular load, DIN 18202,
Extension
Table 3, Line 7, with 2 ties.
For standard element joints. On external corners. For filler timbers up to 100 mm. For timber extensions.
57.5
in only one step!
1.175 m
durch neutrales Prüfinstitut
External formwork: with panel TR 90 240 ➍
Internal formwork: with TRIO Corner TE Güteschutzverband Test report
1.075 m
Betonschalungen available on
Adapting to wall thicknesses using
240
➌ request.
TRIO wall thickness compensation
3.30 m
3.30 m
WDA 5, WDA 6 or timber infills.
Filler timber
➋
1.55 m
1.075 m
72
2. With WDA or timber
M
TR
WDA 5/6
➊ ➊
60
E
72
57.5
57.5
TG
E
4.
TG
TE
72
(180)
200
WDA 5 (6)
90
TRM 72
3. With TRM 72
60
The TRIO shaft element
Filler timber allows complete shaft
TRM 72
TRM 72 formwork units to be moved
as one unit.
A 25 mm all-round
TRM 72
TRM 72 clearance for striking is
created when the formwork
panels are pulled.
Filler timber
1. With 330 x 240 2. With TRM 72 3. With TR 30 4. With WDA or timber infills 2. When striking,
lever crowbar
upwards.
TE
WDA 5/6 Shaft Element TSE 330,
(240)
250
WDA 5 (6)
Item no. 105525
90
TRM 72
30
30
TAR 85
240
Quick and easy solution up to 100 mm. Economical solution. Optimal visible surface solution. TRIO articulated corner TGE for angles Internal formwork: External formwork:
90
With timber, or timber and formlining With filler plates from 60 – 360 mm. With formlining and filler support of 75° and more – for internal and with TR 60 or TR 30 panels and articulated with multi-panel TRM 72 and
plus BFD alignment coupler. Filler Plate LA 330, Item No. 054384. TPP, Alu 330, Item No. 101829. TE external corners alike. corners articulated corners
85
TAR 2
5.
75°
7
Filler timber
TRM 72
TRM
30
TE 60
30
90
TE TE
30
TE TE
TE Filler timber
72
TAR 85
400
WDA 5
TRM 72
90
TRM 72 TGE
60 60
7. 3.
TATRM
TE
60 TGE
R 7
85 2
135°
TRM 72
TRM 72
60
Using the TRIO MT/MTF stopend panel with continuous Up to max. 200 mm Basic rules for corners Internal formwork: External formwork:
240 - 330
TRIO wall thickness compensation (180) (240) 3 BFD alignment couplers for h = 3.30 m 7 BFD alignment couplers for h = 3.30 m
max.
TAR 85
30
Timber
2 WDA 5 (6) WDA 5 (6)
Additional BFD for Hook tie
120 mm offsets upwards DW 15/400
360
240
240
TRM 72
TRM 72
TAR 85 TE
72
TE
72
Up to max. 860 mm
60
60
TRM 72
TAR 85
860 mm
max.
Stopend panel 120
(360)
390
min.
AT MTF AT AT MT AT
c c c c TE
TE
The concrete cover c is 25 mm or 50 mm. Timber infills
60
TAR 85 Stopend tie
TE
Push-Pull Props and Kicker Braces
TAR 85
TE
TE
TRM 72
TAR 85
72
72
Push-pull props and kicker braces for Other push-pull props, according to the For assembly of
base plates.
Ankerschraube
60 60 60
aligning the formwork as well as table, are attached to the panels by Multi-Monti MMS 20x130
420
TAR 85
transferring wind loads means of TRIO brace connectors and to
Zur Befestigung von
Richtstützen, Abspannungen bei
SKYDECK Bühnen oder
are to be arranged as shown in the the slab using appropriate base plates
eingesetzten
Befestigungssystemen.
MMS 20 x 130
Die Vorteile im Überblick
– mehrfach wiederverwendbar
– einfache Durchsteckmontage
– enorme Zeit- und Kostenersparnis
drawings and table below. The first and PERI anchor bolts MMS 20 x 130.
Transport and Storage
– keine Sprengwirkung des Dübels
härtetem Beton.
Alignment couplers and all-round struts Extension up to max. 8.10 m high can
Klemmstärke tfix [mm] 10-15 bei erreichter Festigkeit
Fmax [kN] 41,7
Perm. load of 500 kg/piece Perm. load of 2.9 t with 45° lifting gear angle.
empf. FQ [kN]
Table for PERI push-pull props and kicker braces For safe stacking of 5 TRIO panels The pins are used to move stacks of panels located on the ground. easier.
Durchgangsloch im zu
a PERI GmbH
ar r
a a
of any size.
Postfach 12 64
Always use in pairs! TRIO lifting hooks or TRIO stacking devices are attached to the
SW 30
a a
tfix 89259 Weißenhorn
Tel.: 0 73 09 / 9 50 - 0
hnom Fax: 0 73 09 / 9 50 - 176
www.peri.de
450
from top of formwork 1.0 1.2 1.5 1.8 2.0 2.0 y2 4.5 5.5 6.2 6.9
y
* If necessary, the distance from the top of the formwork must be Ausgabe 05/2007
F RS 1
0.5 kN/m2
For the given widths of influence, a maximum force of 11.3 kN is Instructions for Use Instructions for Use
Pallets and Stacking Devices Lifting Hook TRIO Lifting Gear Combi-2 TRIO
F RS
x1
510
TRIO Panels
Width
240 120 90 60 30 72 TE TRM 72 TGE
Height
Internal corner Multi-purpose Articulated
with 30 cm leg panel with corner from 75°
length continuous tie to 285° for
hole strip internal and Max. 5 TRIO panels 330 x 240 can
external corners be transported with the lifting gear
540
combi-2.
Secure stack of panels by means of
tie rods to prevent panels moving
during lifting.
TR 330
Scaffold Bracket
TRG 80 Item no. 023670
Handrail Post Holder TRIO
TRG 120 Item no. 023680 Item no. 101592
Two TAR 85 compensation walers and
two BFD alignment couplers are required
m2 7.92 3.96 2.97 1.98 0.99 2.38 1.98 2.38 1.98
570
Item no. 054304 054314 054324 054354 054364 054334 054374 054344 054414 for extension heights up to 8.10 m per
Weight 398.00 kg 192.00 kg 135.00 kg 97.40 kg 64.90 kg 107.00 kg 86.10 kg 122.00 kg 121.00 kg Planking and Guardrails or element joint.
m
for working platforms are to be fitted . 10 m 1.35
2 c e
according to current valid guidelines. x. n
Ma influe
Maximum spacing of the scaffold Handrail Post HSGP f
ho
brackets = 1.35 m with a permissible Item no. 034580
w idt
load of 150 kg/m2.
TR 270
m2 6.48 3.24 2.43 1.62 0.81 1.94 1.62 1.94 1.62 Concreting Platform 120 x 270
Item no. 022570 022510 022520 022550 022560 022530 022580 022540 023200 Item no. 022950
Weight 329.00 kg 159.00 kg 112.00 kg 80.30 kg 52.90 kg 89.20 kg 68.80 kg 93.80 kg 94.80 kg
a truck.
m2 2.88 1.44 1.08 0.72 0.36 0.86 0.72 0.86 0.72
Item no. 022514 022600 022610 022640 022650 022620 022660 022630 032300
Weight 163.00 kg 67.90 kg 52.80 kg 39.50 kg 24.90 kg 43.50 kg 32.80 kg 51.90 kg 43.60 kg
660
TR 60
170
320
Edition 12/2007
TRIO 330
Panel Formwork
Poster
Edition 09/2009
Additional Systems
Plywood
Formwork Girders
Stopend Systems
Pallets
Transportation Containers
PERI GmbH
Formwork Scaffolding Engineering
P.O. Box 1264
89259 Weissenhorn
Germany
Tel +49 (0)73 09.9 50- 0
Fax +49 (0)73 09.9 51- 0
[email protected]
www.peri.com
(1B5XŴFNVHLWHLQGG 8KU