0% found this document useful (0 votes)
25 views

Fcto H2first Ref Station Design Standalone Pids

The document appears to be a diagram or chart with labels for various parts of an energy or industrial system. It includes labels for things like air, burner, compressor, dispenser, and various types of valves and equipment. The document also includes specifications for pipe material and sizing.

Uploaded by

Mohan Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Fcto H2first Ref Station Design Standalone Pids

The document appears to be a diagram or chart with labels for various parts of an energy or industrial system. It includes labels for things like air, burner, compressor, dispenser, and various types of valves and equipment. The document also includes specifications for pipe material and sizing.

Uploaded by

Mohan Raj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

K J I H G F E D C B A

1
Measured Variable Readout of function Output Function Modifier
A Air Alarm Line symbols
B Burner Storage Users Choice Users Choice X”-XXX-XXXX-XXX-XXX
C Compressor Closed
Insulation (if applicable)
D Dispenser
E Electrolyzer Sensor (primary Element) Pipe Spec.

2 F Flow Filter Line Number (if assigned)


G Chiller Glass, viewing Service
H Hand High
Line size, nominal inches
I Current Indicator
J Power Line Service Identification codes Insulation codes
K Time Control Station CCA-CLEAN COMPRESSED AIR F1- Soda-lime silicate glass (FOAMGLAS) 1" wall thickness
L Level Light Low CHW-CHILLED WATER F2- Buna N Foam 3/8" thick
M Conductivity Middle H-HYDROGEN
3
N Users Choice Users Choice Hydrogen Users Choice N-NITROGEN
O Water Orifice, restriction Air Open
P Pressure Pipe Specification Details
Q Quantity 3000PSI Min. pressure rating of 3,000 PSI 316/316L austenitic stainless steel tubing UNS S31600 (316), UNS S31603 (316L)
R Radiation Record, Reduce 6500PSI Min. pressure rating of 6,500 PSI 316/316L austenitic stainless steel tubing UNS S31600 (316), UNS S31603 (316L)
S Speed, Frequency Switch 15000PSI Min. pressure rating of 15,000 PSI 316/316L austenitic stainless steel tubing UNS S31600 (316), UNS S31603 (316L)
T Temperature Transmit POLY Polyamide (Nylon) pneumatic tubing, light and heat stabilized.
4 0.032CU 0.032" wall copper alloy 122 seamless tubing
U Multivariate Multifunction Multifunction Multifunction
V Vibration Valve SCH40 Schedule 40 iron pipe
W Weight Well Water
X Unclassified Unclassified Unclassified Unclassified
Y State Relay
Z Position Actuator
VALVES EQUIPMENT PROCESS AND SIGNAL LINES
5

BALL VALVE FILTER HYDROGEN PROCESS LINE

NEEDLE VALVE PUMP DEIONIZED WATER PROCESS LINE

CHECK VALVE PNEUMATIC SIGNAL LINE


SV
DRYER
SOLENOID VALVE NITROGEN SIGNAL LINE
6
AIR ACTUATED VALVE, HYDROGEN ELECTRICAL SIGNAL LINE
SPRING RETURN CLOSE COMPRESSOR

PRESSURE REDUCING VALVE STORAGE TANK

TWO WAY PRESSURE RELIEF


IR FLAME DETECTOR
7 THREE WAY PRESSURE RELIEF

FILE INFORMATION ENGINEERING REVIEW DESCRIPTION


REVISIONS
DRAWN BY PLATFORM DATE SCALE APPROVAL DATE ENERGY SYSTEMS INTEGRATION LABORATORY P&ID
REV DESCRIPTION DATE APPROVED
0 INITIAL 12/2/2014 C. AINSCOUGH VISIO 2010 PRO 12/18/2014 NONE DESIGNER
15013 Denver West Parkway
LEGEND AND SPECIFICATIONS
FULL FILENAME ENGINEER Golden, CO 80401-3305
C:\USERS\CAINSCOU\DOCUMENTS\REFERENCESTATION\FINAL\ DRAWING NO PREFIX DRAWING NO. REVISION NO.
CHECKED BY Operated for the
REFSTATIONPID.VSD A/E APPR. BY PID LEG 0
U.S. Department of Energy NREL PROJECT NUMBER SHEET A/E PROJ NO.
NREL APPR BY
by the Alliance for Sustainable Energy, LLC
BLD AREA ENG 1 OF 6
K J I H G F E D C B A
1 TO FIRE PANEL

IR FLAME DETECTOR
AIMED AT DISP HOSE

35/70MPa DISPENSER
WUN-900 RAH-900
CHILLER
75-kW HEAT EXCHANGER FV/Controls Internal
120V, 1p, 15A To EPO
1350 lbs
circuit
DN-900
GN-901
JSS-901
H70-Cold (EPO)

2 H70-T40
ZSO-400 ZSC-400 ZI-400 GN-900
1-¼”-CHW-800-SCH40-F2 TO COMMON ¾” VENT MAST 700-BAR NOZZLE
OF-802 HV-900 H70-Warm
LOCATED ON BACK OF GMP
GW-800 GW-801 10' ABOVE GRADE 350-BAR NOZZLE
ZZO-400 HV-901 H35-T0
CW-800
TO FIRE PANEL 3/8"-H-15000PSI

1-¼”-CHW-800-SCH40 FV-400
HV-400

ZSO-401 ZSC-401 ZI-401 PI-401 PT-401


ZI-100 3/4"-H-VENT
RAH-100

3 IR FLAME DETECTOR
AIMED AT TRAILER INTERFACE
PI-101 PT-101 ZSC-100 PI-202 PT-202
HV-203 PI-300 PT-300 HV-300
ZZO-401
HV-401
AND ZONE 400, HV-201 HV-202 H2 Storage PBNH-401

3/4"-H-VENT
ZSO-100
HIGH PRESSURE STORAGE MAWP-15000 PSIG

3/8"-H-15000PSI
3/8"-H-5000PSI
HV-411
FV-401

HV-101 ZZO-100 HV-202 ZSO-402 ZSC-402 ZI-402 PI-402 PT-402

HV-300

HV-100 3/8"-H-5000PSI ZZO-402


FSV-100 FV-100 HV-402
FF-300 FSV-300 HV-301
3/8"-H-3000PSI CNH-300
3/8"-H-15000PSI H2 Storage PBNH-402
H2 Delivery Trailer, multiple tubes, one outlet MAWP-15000 PSIG
HV-412
FV-402
COMPRESSOR,
MULTIPLE STAGES
Motor
4 460-V 3Ø, 25kW ZSO-403 ZSC-403 ZI-403 PI-403 PT-403

ZSO-101 ZSC-101 ZI-101 Heater


ZZO-403
120-V, 1Ø, 500 W HV-403
ZVO-100 H2 Storage PBNH-403
ZZO-101
HV-413
MAWP-15000 PSIG
FV-403

ZVO-101
FV-101 FSV-200

ZVO-400

5 ZVO-401

ZVO-402

PBAL-100
AF-100 ZVO-403

COH-100 Air Dryer


Air Compressor AF-101

ZVO-900

PLC/
Gas Control Cabinet

7
REVISIONS FILE INFORMATION ENGINEERING REVIEW DESCRIPTION
APPROVAL DATE ENERGY SYSTEMS INTEGRATION LABORATORY P&ID
REV DESCRIPTION DATE APPROVED DRAWN BY PLATFORM DATE SCALE
DESIGNER
0 INITIAL 12/02/2014 C. AINSCOUGH
FULL FILENAME
VISIO 2010 PRO 12/18/2014 NONE ENGINEER
CHECKED BY 15013 Denver West Parkway REFERENCE STATION 100KG/DAY
A/E APPR. BY Golden, CO 80401-3305 DRAWING NO PREFIX DRAWING NO. REVISION NO.
C:\USERS\CAINSCOU\DOCUMENTS\REFERENCESTATION\FINAL\ NREL APPR BY
REFSTATIONPID.VSD BLD AREA ENG
Operated for the PID 0
U.S. Department of Energy NREL PROJECT NUMBER SHEET A/E PROJ NO.
by the Alliance for Sustainable Energy, LLC 2 OF 6
K J I H G F E D C B A
1 TO FIRE PANEL

IR FLAME DETECTOR
AIMED AT DISP HOSE

35/70MPa DISPENSER
WUN-900 RAH-900
CHILLER
75-kW HEAT EXCHANGER FV/Controls Internal
120V, 1p, 15A To EPO
1350 lbs
circuit
DN-900
GN-901
JSS-901
H70-Cold (EPO)

2 H70-T40
ZSO-400 ZSC-400 ZI-400 GN-900
1-¼”-CHW-800-SCH40-F2 TO COMMON ¾” VENT MAST 700-BAR NOZZLE
OF-802 HV-900 H70-Warm
LOCATED ON BACK OF GMP
GW-800 GW-801 10' ABOVE GRADE 350-BAR NOZZLE
ZZO-400 HV-901 H35-T0
CW-800
TO FIRE PANEL 3/8"-H-15000PSI

1-¼”-CHW-800-SCH40 FV-400
HV-400

ZSO-401 ZSC-401 ZI-401 PI-401 PT-401


ZI-100 3/4"-H-VENT
RAH-100

3 IR FLAME DETECTOR
AIMED AT TRAILER INTERFACE
PI-101 PT-101 ZSC-100 PI-202 PT-202
HV-203 PI-300 PT-300 HV-300
ZZO-401
HV-401
AND ZONE 400, HV-201 HV-202 H2 Storage PBNH-401

3/4"-H-VENT
ZSO-100
HIGH PRESSURE STORAGE MAWP-15000 PSIG

3/8"-H-15000PSI
3/8"-H-5000PSI
HV-411
FV-401

HV-101 ZZO-100 HV-202 ZSO-402 ZSC-402 ZI-402 PI-402 PT-402

HV-300

HV-100 3/8"-H-5000PSI ZZO-402


FSV-100 FV-100 HV-402
FF-300 FSV-300 HV-301
3/8"-H-3000PSI CNH-300
3/8"-H-15000PSI H2 Storage PBNH-402
H2 Delivery Trailer, multiple tubes, one outlet MAWP-15000 PSIG
HV-412
FV-402
COMPRESSOR,
MULTIPLE STAGES
Motor
4 460-V 3Ø, 50kW ZSO-403 ZSC-403 ZI-403 PI-403 PT-403

ZSO-101 ZSC-101 ZI-101 Heater


ZZO-403
120-V, 1Ø, 500 W HV-403
ZVO-100 H2 Storage PBNH-403
ZZO-101
HV-413
MAWP-15000 PSIG
FV-403

ZVO-101
FV-101 FSV-200

ZVO-400

5 ZVO-401

ZVO-402

PBAL-100
AF-100 ZVO-403

COH-100 Air Dryer


Air Compressor AF-101

ZVO-900

PLC/
Gas Control Cabinet

7
REVISIONS FILE INFORMATION ENGINEERING REVIEW DESCRIPTION
APPROVAL DATE ENERGY SYSTEMS INTEGRATION LABORATORY P&ID
REV DESCRIPTION DATE APPROVED DRAWN BY PLATFORM DATE SCALE
DESIGNER
0 INITIAL 12/02/2014 C. AINSCOUGH
FULL FILENAME
VISIO 2010 PRO 12/18/2014 NONE ENGINEER
CHECKED BY 15013 Denver West Parkway REFERENCE STATION 200KG/DAY
A/E APPR. BY Golden, CO 80401-3305 DRAWING NO PREFIX DRAWING NO. REVISION NO.
C:\USERS\CAINSCOU\DOCUMENTS\REFERENCESTATION\FINAL\ NREL APPR BY
REFSTATIONPID.VSD BLD AREA ENG
Operated for the PID 0
U.S. Department of Energy NREL PROJECT NUMBER SHEET A/E PROJ NO.
by the Alliance for Sustainable Energy, LLC 3 OF 6
K J I H G F E D C B A
1 TO FIRE PANEL

IR FLAME DETECTOR
AIMED AT DISP HOSE

35/70MPa DISPENSER
WUN-900 RAH-900
CHILLER
75-kW HEAT EXCHANGER FV/Controls Internal
120V, 1p, 15A To EPO
1350 lbs
circuit
DN-900
GN-901
JSS-901
H70-Cold (EPO)

2 H70-T40
ZSO-400 ZSC-400 ZI-400 GN-900
1-¼”-CHW-800-SCH40-F2 TO COMMON ¾” VENT MAST 700-BAR NOZZLE
OF-802 HV-900 H70-Warm
LOCATED ON BACK OF GMP
GW-800 GW-801 10' ABOVE GRADE 350-BAR NOZZLE
ZZO-400 HV-901 H35-T0
CW-800
TO FIRE PANEL 3/8"-H-15000PSI

1-¼”-CHW-800-SCH40 FV-400
HV-400

ZSO-401 ZSC-401 ZI-401 PI-401 PT-401


ZI-100 3/4"-H-VENT
RAH-100

3 IR FLAME DETECTOR
AIMED AT TRAILER INTERFACE
PI-101 PT-101 ZSC-100 PI-202 PT-202
HV-203 PI-300 PT-300 HV-300
ZZO-401
HV-401
AND ZONE 400, HV-201 HV-202 H2 Storage PBNH-401

3/4"-H-VENT
ZSO-100
HIGH PRESSURE STORAGE MAWP-15000 PSIG

3/8"-H-15000PSI
3/8"-H-5000PSI
HV-411
FV-401

HV-101 ZZO-100 HV-202 ZSO-402 ZSC-402 ZI-402 PI-402 PT-402

HV-300

HV-100 3/8"-H-5000PSI ZZO-402


FSV-100 FV-100 HV-402
FF-300 FSV-300 HV-301
3/8"-H-3000PSI CNH-300
3/8"-H-15000PSI H2 Storage PBNH-402
H2 Delivery Trailer, multiple tubes, one outlet MAWP-15000 PSIG
HV-412
FV-402
COMPRESSOR,
MULTIPLE STAGES
Motor
4 460-V 3Ø, 60kW ZSO-403 ZSC-403 ZI-403 PI-403 PT-403

ZSO-101 ZSC-101 ZI-101 Heater


ZZO-403
120-V, 1Ø, 500 W HV-403
ZVO-100 H2 Storage PBNH-403
ZZO-101
HV-413
MAWP-15000 PSIG
FV-403

ZVO-101
FV-101 FSV-200

ZVO-400

5 ZVO-401

ZVO-402

PBAL-100
AF-100 ZVO-403

COH-100 Air Dryer


Air Compressor AF-101

ZVO-900

PLC/
Gas Control Cabinet

7
REVISIONS FILE INFORMATION ENGINEERING REVIEW DESCRIPTION
APPROVAL DATE ENERGY SYSTEMS INTEGRATION LABORATORY P&ID
REV DESCRIPTION DATE APPROVED DRAWN BY PLATFORM DATE SCALE
DESIGNER
0 INITIAL 12/02/2014 C. AINSCOUGH
FULL FILENAME
VISIO 2010 PRO 12/18/2014 NONE ENGINEER
CHECKED BY 15013 Denver West Parkway REFERENCE STATION 300KG/DAY
A/E APPR. BY Golden, CO 80401-3305 DRAWING NO PREFIX DRAWING NO. REVISION NO.
C:\USERS\CAINSCOU\DOCUMENTS\REFERENCESTATION\FINAL\ NREL APPR BY
REFSTATIONPID.VSD BLD AREA ENG
Operated for the PID 0
U.S. Department of Energy NREL PROJECT NUMBER SHEET A/E PROJ NO.
by the Alliance for Sustainable Energy, LLC 4 OF 6
K J I H G F E D C B A
1 TO FIRE PANEL

IR FLAME DETECTOR
AIMED AT DISP HOSE

35/70MPa DISPENSER
WUN-900 RAH-900
CHILLER
TO FIRE PANEL 75-kW HEAT EXCHANGER FV/Controls Internal
120V, 1p, 15A To EPO
1350 lbs
circuit
DN-900
GN-901
JSS-901
H70-Cold (EPO)

2 H70-T40
ZSO-400 ZSC-400 ZI-400 GN-900
1-¼”-CHW-800-SCH40-F2 TO COMMON ¾” VENT MAST 700-BAR NOZZLE
RAH-100 OF-802 HV-900 H70-Warm
LOCATED ON BACK OF GMP
IR FLAME DETECTOR GW-800 GW-801 10' ABOVE GRADE 350-BAR NOZZLE
ZZO-400 HV-901 H35-T0
AIMED AT TRAILER INTERFACE, LIQUID TANK
CW-800
AND ZONE 400, 3/8"-H-15000PSI
HIGH PRESSURE STORAGE
1-¼”-CHW-800-SCH40 FV-400
HV-400

ZSO-401 ZSC-401 ZI-401


TT-102 PI-401 PT-401
ZI-100 3/4"-H-VENT

3 PI-102 PT-102 PI-101 PT-101 ZSC-100 PI-202 PT-202


HV-203 PI-300 PT-300 HV-300
ZZO-401
HV-401
HV-201 HV-202 H2 Storage PBNH-401

3/4"-H-VENT
ZSO-100
MAWP-15000 PSIG

3/8"-H-15000PSI
3/8"-H-5000PSI
HV-411
FV-401

HV-102 HV-101 ZZO-100 HV-202 ZSO-402 ZSC-402 ZI-402 PI-402 PT-402

HV-300

HV-100 3/8"-H-5000PSI ZZO-402


FSV-100 FV-100 HV-402
FF-300 FSV-300 HV-301
3/8"-H-3000PSI CNH-300
3/8"-H-15000PSI H2 Storage PBNH-402
HV-412
MAWP-15000 PSIG
FV-402
COMPRESSOR,
GH-100
MULTIPLE STAGES
Ambient Air Evaporator Motor
4 PBNL-100
460-V 3Ø, 60kW ZSO-403 ZSC-403 ZI-403 PI-403 PT-403

Cryogenic Liquid Storage


ZSO-101 ZSC-101 ZI-101 Heater
1,600 kg CNL-300 ZZO-403
Cryogenic pump 120-V, 1Ø, 500 W HV-403
ZVO-100 H2 Storage PBNH-403
ZZO-101
HV-413
MAWP-15000 PSIG
FV-403

ZVO-101
FV-101 FSV-200

ZVO-400

5 ZVO-401

ZVO-402

PBAL-100
AF-100 ZVO-403

COH-100 Air Dryer


Air Compressor AF-101

ZVO-900

PLC/
Gas Control Cabinet

7
REVISIONS FILE INFORMATION ENGINEERING REVIEW DESCRIPTION
APPROVAL DATE ENERGY SYSTEMS INTEGRATION LABORATORY P&ID
REV DESCRIPTION DATE APPROVED DRAWN BY PLATFORM DATE SCALE
DESIGNER
0 INITIAL 12/02/2014 C. AINSCOUGH
FULL FILENAME
VISIO 2010 PRO 12/18/2014 NONE ENGINEER
CHECKED BY 15013 Denver West Parkway REFERENCE STATION 300KG/DAY LIQ
A/E APPR. BY Golden, CO 80401-3305 DRAWING NO PREFIX DRAWING NO. REVISION NO.
C:\USERS\CAINSCOU\DOCUMENTS\REFERENCESTATION\FINAL\ NREL APPR BY
REFSTATIONPID.VSD BLD AREA ENG
Operated for the PID 0
U.S. Department of Energy NREL PROJECT NUMBER SHEET A/E PROJ NO.
by the Alliance for Sustainable Energy, LLC 5 OF 6
K J I H G F E D C B A
1 TO FIRE PANEL

IR FLAME DETECTOR
AIMED AT DISP HOSE
ZSO-101 ZSC-101 ZI-101

35/70MPa DISPENSER
ZZO-101
WUN-900 RAH-900
ZVO-101 FV/Controls Internal
120V, 1p, 15A To EPO
circuit
FV-101
DN-900
TO FIRE PANEL
JSS-901
H70-Cold (EPO)

2 H70-T40
ZSO-400 ZSC-400 ZI-400 Mixing Heat Exchanger 700-BAR NOZZLE
RAH-100 HV-900 H70-Warm
TO COMMON ¾” VENT MAST
IR FLAME DETECTOR LOCATED ON BACK OF GMP 350-BAR NOZZLE
10' ABOVE GRADE ZZO-400 HV-901 H35-T0
AIMED AT TRAILER INTERFACE, LIQUID TANK
AND ZONE 400, 3/8"-H-15000PSI
HIGH PRESSURE STORAGE
HV-400
FV-400

3/4"-H-VENT
3/4"-H-VENT
ZSO-401 ZSC-401 ZI-401
TT-102 PI-401 PT-401
ZI-100

3 PI-102 PT-102
PI-101 PT-101 ZSC-100 PI-202 PT-202
ZZO-401
HV-401
H2 Storage PBNH-401
ZSO-100
HV-411
MAWP-15000 PSIG
PSV-100 FV-401
HV-102 HV-101 PSV-200
ZZO-100 HV-202 ZSO-402 ZSC-402 ZI-402 PI-402 PT-402
3/8"-H-15000PSI

HV-100 FSV-300 HV-301 ZZO-402


FSV-100 FV-100 FF-300 3/8"-H-5000PSI HV-402
3/8"-H-3000PSI
H2 Storage PBNH-402
HV-412
MAWP-15000 PSIG
FV-402
GH-109
Forced Draft

4 PBNL-100
High Pressure
Evaporator
ZSO-403 ZSC-403 ZI-403 PI-403 PT-403

Cryogenic Liquid Storage


1,600 kg CNL-309 ZZO-403
High Pressure HV-403
Cryogenic pump
ZVO-100 H2 Storage PBNH-403
HV-413
MAWP-15000 PSIG
FV-403
ZZO-101

ZVO-101

ZVO-400

5 ZVO-401

ZVO-402

PBAL-100
AF-100 ZVO-403

COH-100 Air Dryer


Air Compressor AF-101

ZVO-900

PLC/
Gas Control Cabinet

7
REVISIONS FILE INFORMATION ENGINEERING REVIEW DESCRIPTION
APPROVAL DATE ENERGY SYSTEMS INTEGRATION LABORATORY P&ID
REV DESCRIPTION DATE APPROVED DRAWN BY PLATFORM DATE SCALE
DESIGNER
0 INITIAL 12/02/2014 C. AINSCOUGH
FULL FILENAME
VISIO 2010 PRO 12/18/2014 NONE ENGINEER
CHECKED BY 15013 Denver West Parkway REFERENCE STATION FUTURE LIQUID
A/E APPR. BY Golden, CO 80401-3305 DRAWING NO PREFIX DRAWING NO. REVISION NO.
C:\USERS\CAINSCOU\DOCUMENTS\REFERENCESTATION\FINAL\ NREL APPR BY
REFSTATIONPID.VSD BLD AREA ENG
Operated for the PID 0
U.S. Department of Energy NREL PROJECT NUMBER SHEET A/E PROJ NO.
by the Alliance for Sustainable Energy, LLC 6 OF 6

You might also like