0% found this document useful (0 votes)
13 views

Test Interview - BOQ

This document is a bill of quantities for the structure of a swimming pool in Denpasar, Bali. It includes 3 sections: A) Bore Pile Work which includes supplying and installing concrete piles and pile caps, B) Concrete Work which includes supplying and installing reinforced concrete for the floor, walls, roof and formwork, and C) Waterproofing Protection Work which includes applying a cement base with protective render to the concrete surfaces. The total cost for the swimming pool structure is listed as Rp0.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Test Interview - BOQ

This document is a bill of quantities for the structure of a swimming pool in Denpasar, Bali. It includes 3 sections: A) Bore Pile Work which includes supplying and installing concrete piles and pile caps, B) Concrete Work which includes supplying and installing reinforced concrete for the floor, walls, roof and formwork, and C) Waterproofing Protection Work which includes applying a cement base with protective render to the concrete surfaces. The total cost for the swimming pool structure is listed as Rp0.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BILL OF QUANTITIES

SWIMMING POOL - STRUCTURE


DENPASAR - BALI
Rate Amount
Ref Description Quantity
(Rp) (Rp)

1.0 SWIMMING POOL - STRUCTURE

A BORE PILE WORK

Supply & Install Boring Pile dia. 300 mm to


1 Boring Pile dia. 300 mm, high 6000 m m1 158,125 -

Supply & Install Sitemix K-250 w/ fc = 20.75 Mpa


reinforced concrete to
2 Concrete Bore Pile dia. 300 mm m3 1,488,675 -
3 Concrete Pile Cap 600x600 mm m3 1,488,675 -

Supply and Install Iron reinforcement w/ fy = 390 Mpa hot


roller bar & fy = 240 Mpa plain bar to
4 Reinforcement Concrete Bore Pile dia. 300 mm kg 17,709 -
5 Reinforcement Concrete Pile Cap 600x600 mm kg 17,709 -

Supply & Install Form work w/ plywood 9 mm + local


rafter frames 2x use to
6 Form work Concrete Pile Cap 600x600 mm m2 152,727 -

A BORE PILE WORK carried to collection -

B CONCRETE WORK

Supply & Install Readymix K-300 w/ fc = 24.90 Mpa


reinforced concrete to
1 Concrete Floor 200 mm thick m3 1,488,675 -
2 Concrete Wall 200 mm thick m3 1,488,675 -
3 Concrete Roof 120 mm thick m3 1,488,675 -

Supply and Install Iron reinforcement w/ fy = 390 Mpa hot


roller bar & fy = 240 Mpa plain bar to
4 Reinforcement Concrete Sloof 200/300 mm kg 17,709 -
5 Reinforcement Concrete Colomn 200/300 mm kg 17,709 -
6 Reinforcement Concrete Beam 200/250 mm kg 17,709 -
7 Reinforcement Concrete Floor 200 mm thick kg 17,709 -
8 Reinforcement Concrete Wall 200 mm thick kg 17,709 -
9 Reinforcement Concrete Roof 120 mm thick kg 17,709 -

Supply & Install Form work w/ plywood 9 mm + local


rafter frames 2x use to
10 Form work Concrete Floor 200 mm thick m2 152,727 -
11 Form work Concrete Wall 200 mm thick m2 152,727 -
12 Form work Concrete Roof 120 mm thick m2 152,727 -

Rent Scafolding including frame support to


13 Swimming Pool Concrete m2 113,909 -

B CONCRETE WORK carried to collection -

C WATERPROOFING PROTECTION WORK

Waterproofing Protections ex. Cement Base with protective


render externally to
1 Concrete Floor 200 mm thick m2 130,521 -
2 Concrete Wall 200 mm thick m2 130,521 -
3 Concrete Roof 120 mm thick m2 130,521 -

C WATERPROOFING PROTECTION WORK carried to collection -

Collection

A BORE PILE WORK -

B CONCRETE WORK -

C WATERPROOFING PROTECTION WORK -

1.0 SWIMMING POOL - STRUCTURE Total -