UGC - 6 - Krishan Arora
UGC - 6 - Krishan Arora
org (ISSN-2349-5162)
1Ph.D Research Scholar, Maharishi Markandeshwar University,, Mullana, Haryana & Assistant Prof., School of Electronics and
Electrical Engineering, Lovely Professional University, Phagwara, Punjab
2Department of Electrical Engineering, Maharishi Markandeshwar University, Mullana, Haryana
3School of Electronics and Electrical Engineering, Lovely Professional University, Phagwara, Punjab
Abstract: The significant role of an Electrical power in the life of community is to develop numerous
segments of economy. Today, the current economy is entirely in need of electricity as a rudimentary unit. The
technical rebellion moves every feature of current life. Rapidly emerging computer skills are altering the work
atmosphere for power causes working by values and producers. Developing computer software allows quite
precise project of power system components or networks and amenities, more urbane operational approaches
that effect in high system dependability. Though computational methods have showed valuable in overall
purpose of optimization, these seem mainly pertinent for addition of non-linearly constrained optimization
issues.
Keywords: Load Frequency Control, Multi Area, Speed Governor.
1. . Introduction
Load Frequency Control (LFC) issue is the extreme critical and novel arena of investigation in interrelated
power systems has a profound past in the power system process. The generators functioned in service zone
swing the speed steadily for corresponding the power angles and frequency to precise quantity of fixed and
enthusiastic circumstances together. It is obligatory to accomplish the frequency at definite and adequate
restrictions but nonstop dissimilarity in load can’t be overlooked due to instable nature. A moral load
frequency control system has the ability to equilibrium the tie line power and system frequency within their
limits.
2. Load Frequency Control in Multi Area Power System
The load turbulences are extremely influencing the power system procedure. Daily high power load intake
origins frequency deviation makes the system unstable. LFC also known as AGC supports to dazed the
overhead difficulty by its fast acting tactic as explained [32] The LFC contains two paths i.e. primary control
path that meets the demand with production and secondary control path for satisfactory alteration of
frequency. Speed governing mechanism acts as primary control loop which is a fast acting loop to retain the
frequency during the power mismatch.
The free governor action will make the governor output to match in meeting the additional load thus
attaining the equilibrium. But the speed drop of the generator units is limited to 2-3% which makes the
generator, frequency sensitive. Due to this limitation, at the expense of frequency deviation to a new value
being attained by the governor action, driving the generator output, meeting the demand power, maintain the
JETIRDT06088 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 630
© 2018 JETIR December 2018, Volume 5, Issue 12 www.jetir.org (ISSN-2349-5162)
system secured. Thus LFC helps to keep the system frequency inside the prescribed parameters, irrespective
of sudden change of load.
The response speed depends on usual time intervals of turbine and systems which may be of 2-20
seconds depend on the type of the turbine. Though, the speed governor matches the requirement with
production and found incline in frequency. Fine tuning of system frequency i.e. reorganizing the frequency
fault to zero is achieved by slow acting tributary controller which would respond in minutes as explained [30].
For developing the ideal tributary controller, precise mathematical model of two areas along with the
power system is essential. This paper designates about modelling of hydro thermal areas with its
interconnection. Such a transfer function model will enable the development of optimal secondary controller.
In Thermal area as explained [35], the turbine turns as prime mover for generator which receives the
mechanical power from boiler via steam. If there is growth in requirement, then there is variation in frequency
due to mismatching among requirement and supply. On the basis of frequency, the speed governor by using
hydraulic magnifiers alters the creek valve of steam that regulates the frequency.
The constituents of Thermal area i.e., speed governor; steam turbine; hydraulic amplifier and power system
are modelled as single order time constant for doing small signal analysis [22].
The inputs to speed governor are reference power settings (∆P ref1) and change in frequency (∆f1). The output
of the speed governor regulates the steam which act as input of turbine as per petition requirement. The block
diagram of speed governor is given in Eqn. (1) as;
1
∆𝑃𝑔 = ∆𝑃𝑟𝑒𝑓1 − (𝑅 ) ∆𝑓1 (1)
1
The speed governor fails to operate against high pressure steam. Therefore, with various phases of
hydraulic magnifier, large mechanical forces positions the gate valves of the turbine against extraordinary
pressure steam. The transfer function of hydraulic amplifier is conveyed in Eqn. (2) as:
JETIRDT06088 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 631
© 2018 JETIR December 2018, Volume 5, Issue 12 www.jetir.org (ISSN-2349-5162)
1
∆𝑃𝑣 = (1+ 𝑠𝑇 ) ∆𝑃𝑔 (2)
𝐻
In this research, non-reheat turbine is measured as the prime mover. The equation, which explains
turbine operation, is furnished in Eqn. (3) as:
1
∆𝑃𝑇 = (1+ 𝑠𝑇 ) ∆𝑃𝑣 (3)
𝑇
The output powers of turbine energies the generator that gives an electrical power to the scheme whose
transfer function is revealed in Eqn. (4) as:
𝑃1 𝐾
∆𝑃𝑇 − ∆𝑃𝐷1 = (1+ 𝑠𝑇 ) ∆𝑓1 (4)
𝑃1
In Hydro areas [14], the main source for generating mechanical energy to run the turbine is water. As less time
is required for ignition, greater time period succeeds in reaction during regular operation because of huge
water inertia. The unbalancing among requirement and supply is identified with respect to alteration in
frequency by the governor [19] which regulates the input of water to turbine.
The mathematical model of the arrangement with speed governor, hydro governor and power system is
published as a report [7] and its transfer function is shown in Fig. 2.
1+𝑠𝑇
∆𝑃𝐻𝑉 = 1+𝑠𝑇𝑅 ∆𝑃𝐻𝑔 (5)
2
𝐾1 1
Where ∆𝑃𝐻𝑔 = (∆Pref2 - 𝑅 ∆f2 )
1+𝑠𝑇1 2
5 Tie-Line
The transfer function of Thermal and Hydro area as expressed in Fig. 1 and Fig. 2 are considered to be a
control area assuming that the area contains either Hydro or Thermal power plant alone and they are in
JETIRDT06088 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 632
© 2018 JETIR December 2018, Volume 5, Issue 12 www.jetir.org (ISSN-2349-5162)
coherent operation. All the generators, turbine and speed governor in a control area has similar characteristics
and they are said to be operating in coherent.
Tie-line is a medium which joins two areas and the power flow among line is based on contract between the
areas which is articulated in Eqn. (6) as;
2п𝑇
∆P𝑡𝑖𝑒12 == (∆f1 − ∆f2) (6)
𝑠
The model of tie-line transfer function [16] expressed in Eqn. (6) is expressed in Fig. 3.
In practice, the power system consists of both Thermal and Hydro power plant. For last four decades, the
researches connect the Thermal and Hydro area as expressed in Fig. 5 and recently research is reported [18].
Fig. 4 shows that the Area1 has only Thermal power plant in coherent. Similarly, Area2 contains only
Hydro plant in coherent which are connected through tie-line. Both the areas can be imperiled to load changes.
When there is growth in load in one area that will be supplied by the same area and by using tie-line supplied
by another area But actually, a control area has both Thermal and Hydro areas as shown in Fig. 5 which is not
considered by the researchers.
JETIRDT06088 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 633
© 2018 JETIR December 2018, Volume 5, Issue 12 www.jetir.org (ISSN-2349-5162)
The Hydro Thermal scheme revealed in Fig. 5 is alike to that of the scheme shown in Fig. 4. The only
difference is that, each area has got both Thermal and Hydro areas. The interconnection operation is identical.
In this work, the system shown in Fig. 4 is represented as Single Source Multi Area because of one source in
each area, whereas the system shown in Fig. 3.5 is Multi Source Multi area due to two sources in each area.
The model of two areas Hydro Thermal transfer function exposed in Fig. 6 is established using the transfer
function of Thermal plant in Fig. 1, Hydro plant in Fig. 2 and tie-line representation in Fig. 3.
JETIRDT06088 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 634
© 2018 JETIR December 2018, Volume 5, Issue 12 www.jetir.org (ISSN-2349-5162)
The total power generation in any zone is equal portion of generated power by hydro and thermal power plant
in respective areas.
8. Conclusion
In this paper, transfer function model of Thermal Hydro power plant has been derived. They are associated
together with the tie-line in two methods namely Two Area, which is conventional and then multi area which
is new concept. On analyzing, the thermal system when subjected to unit step load uproar of 0.01 p.u. in
Area1 alone, the area frequency and the tie-line power oscillates and settles with offset. The offset can be
removed by including secondary controller which varies the power reference setting of the governor. An
optimal secondary controller is to be developed for effective operation of hydro thermal power system.
REFERENCES
1 Karush, W.,(1939), "Minima of functions of several variables with inequalities as side conditions",
MS Thesis, Department of Mathematics, University of Chicago, Chicago, IL.
2 Courant, R., (1943), "Variational methods for the solution of problems of equilibrium and vibrations,
JETIRDT06088 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 635
© 2018 JETIR December 2018, Volume 5, Issue 12 www.jetir.org (ISSN-2349-5162)
3 Kuhn, H.W. , and Tucker, A.W., (1951), "Non-Linear Programming, Journal Neyman(Ed)
Proceedings of the second Berkeley Symposium on Mathematical Statistics and Probability",
University of California Press, Berkeley, CA, pp.481-493.
4 Baldwin C. J., Dale K.M., Dittrich R.F.,(1959), “A Study of Economic Shutdown of Generating
Units in Daily Dispatch”, AIEE Transaction of Power Apparatus and Systems, PAS-78, pp. 1272-
1284.
5 Schmit, L. A.,(1960), "Structural Design by Systematic Synthesis", Proceedings, 2nd Conference on
Electronic Computation, ASCE, New York, pp. 105–122.
6 Johnson, Ray C, (1961), "Optimum Design of Mechanical Elements", (first edition), J. Wiley and
Sons, New York and London.
7 Wilde, D. J., (1964), "Optimum Seeking Methods", Prentice-Hall, Inc., Englewood Cliffs, New
Jersey.
8 Kerr, R. H. , Scheidt, J. L. , Fontana, A. J. and Wiley, J. K., (1966),“Unit Commitment”, IEEE
Transactions on Power Apparatus And Systems, PAS-85(5), pp. 417-421.
9 Lowery, P. G., (1966), “Generating Unit Commitment by Dynamic Programming”, IEEE
Transactions on Power Apparatus and Systems, PAS-85(5), pp. 422-426.
10 Hara, K., Kimura, M., and Honda, N. , (1966), "A Method for Planning Economic Unit Commitment
and Maintenance of Thermal Power Systems", IEEE Transaction on Power Apparatus And Systems,
vol. PAS-85(5) , pp. 421-436.
11 Davidson, P.M., Kohbrman, F.J., Master, G.L., Schafer, G.R., Evans, J.R., Lovewell, K.M., Payne,
T.B., (1967), “Unit Commitment Start Stop Scheduling in the Pennsylvania-New Jersey-Maryland
Interconnection”, 1967 PICA Conference Proceeding IEEE, pp. 127-132.
12 Happ, H.H, (1971), “The inter-area matrix: a tie flow model for power pools”, IEEE Transactions
on Power Systems, 90(4) , pp. 36-45.
13 Guy, J. D., (1971), “Security Constrained Unit Commitment”, IEEE Transactions on Power
Apparatus and Systems, 90, pp. 1385-1389.
14 Geoffrion, A.M. , Dyer J.S. , and Feinberg, A.,(1972), "An Interactive approach for multi-criterion
optimization with an application to the operation on an academic department", Management Science,
19(4), pp.357-368.
15 Vemuri, V, (1974), "Multiple objective optimization in water resource systems", Water Resources
Research, 10(1), pp.44-48.
16 Haimes, Y.Y., and Hall, W.A., (1974), “Multi-Objectives in water resource systems analysis: the
surrogate worth trade-off method", Water Resources Research, 10(4), pp.615-624.
17 Burns R. M. and Gibson C.A., (1975), “Optimization of Priority Lists for a Unit Commitment
Program,” Proceedings IEEE PES 1975 Summer Meeting, Paper A75 453-1/1-7, San Francisco, CA.
18 Cohon, J.L., and Marks, D.H., (1975), "A Review and evaluation of multi-objective programming
JETIRDT06088 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 636
© 2018 JETIR December 2018, Volume 5, Issue 12 www.jetir.org (ISSN-2349-5162)
19 Pang C. K. and Chen H. C., (1976), "Optimal Short-term Thermal Unit Commitment", IEEE
Transactions on Power Apparatus and Systems, PAS-45(4), pp 1336-1342.
20 Keeney, R.L., and Raiffa, H., (1976), "Decisions with multiple objectives, Preferences and Value
Trade-Offs", Wiley, New York.
21 Zionts, S., and Wallenius, J., (1976), "An Interactive programming method for solving the multiple
criteria problems", Management Science, 22, pp.652-663.
22 Dillon, T. S. , Edwin, K. W., Kochs, H. D. and Taud, R. J. ,(1978), “Integer Programming Approach
to the Problem of Optimal Unit Commitment with Probabilistic Reserve Determination,” IEEE
Transactions on Power Apparatus and Systems, 97(6), pp. 2154-2166.
23 Shoults R. R., Chang S. K., Helmick S. and Grady W. M., (1980), “A Practical Approach to Unit
Commitment, Economic Dispatch and Savings Allocation For Multi-area Pool Operation with
Import/Export Constraints,” IEEE Transactions on Power Apparatus and Systems, PAS-99(2), pp.
625 – 635.
24 Zionts, S. and Wallenius, J.(1980), “ An Interactive multiple objective linear programming method
for a class of underlying nonlinear utility function, School of Management, State University New
York at Buffalo, Paper No. 437.
25 Pang C. K., Sheble, G. B., and Albuyeh F., (1981), "Evaluation of Dynamic Programming Based
Method and Multiple Area Representation for Thermal Unit Commitments", IEEE Transactions on
Power Apparatus and Systems, PAS-100(3), pp. 1212-1218.
26 Brayton, R. K., Hachtel, G. D., and Sangiovanni-Vincentelli , A. L., (1981), “A survey of
optimization techniques for integrated-circuit design”, Proceedings of the IEEE , 69(10), pp.1334-
1361.
27 Vira, C. , Yacov, H. and David, G., (1981), "A multiobjective dynamic programming method for
capacity expansion", IEEE Trans. Automat. Contr., 26, pp. 1195-1207.
28 Francisco J. Solis and Roger J-B. Wets, (1981), "Minimization by Random Search Techniques",
Mathematics of Operations Research, 6(1), pp. 19-30.
29 Lauer, G. S., Sandell, N. R. , Bertsekas, Jr., and Posbergh, T.A. ,(1982), “Solution Of Large Scale
Optimal Unit Commitment Problem”. IEEE Transactions on Power Apparatus and Systems, 101, pp.
79-96.
30 Cohen, A. I., and Yoshimura, M., (1983), “A Branch-and-Bound Algorithm for Unit Commitment,”
IEEE Transactions on Power Apparatus and Systems, 102(2), pp. 444-451.
31 Merlin, A. and Sandrin, P., (1983), “A New Method for Unit Commitment at Electricite De France",
IEEE Transactions on Power Apparatus and Systems, 102(5) , pp. 1218 - 1225.
32 Rarig, H.M., and Haimes, Y.Y.,(1983) “Risk/Dispersion Index Method”, IEEE Transactions on
Systems, Man and Cybernetics, 13(3), pp.317-328.
33 Reklaitis, G.V., Ravindran, A. and Ragsdell, K.M.,(1983) , "Engineering Optimization: Methods and
JETIRDT06088 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 637
© 2018 JETIR December 2018, Volume 5, Issue 12 www.jetir.org (ISSN-2349-5162)
34 Steuer, R.E., Choo, E.-U.,(1983), "An interactive weighted Tchebycheff procedure for multiple
objective programming", Math Program, 26, 326–344.
35 Bosch, V. D. , and Honderd G., (1985), "A Solution of the Unit Commitment Problem via
Decomposition and Dynamic Programming", IEEE Transactions on Power Apparatus and Systems”,
PAS-104(7), pp. 1684-1690.
36 Lee, K.D., Vierra, R.H., Nagel, G.D., and Jenkins, R.T.,(1985), "Problems Associated With Unit
Commitment In Uncertainty”, IEEE Transactions on Power Apparatus and Systems, 104(8),
pp.2072-2078.
37 Kusic,G. L. ,and Putnam, H. A. ,(1985), “Dispatch And Unit Commitment Including Commonly
Owned Units”, IEEE Transactions on Power Apparatus and Systems, 104, pp.2408-2412.