1. Introduction ................................................................................................................................. 2
2. Purpose and Scope..................................................................................................................... 2
3. Regulatory Standards ................................................................................................................. 2
4. Responsibility and Training ....................................................................................................... 2
4.1 Validation Resources ......................................................................................................2
4.2 Authority and Responsibility ...........................................................................................2
4.3 Training ...........................................................................................................................3
5. Validation Approach ................................................................................................................... 3
5.1 Risk Assessment ............................................................................................................3
5.2 System Life Cycle ...........................................................................................................3
5.3 GAMP 5 - Software Classifications.................................................................................3
5.4 Excel Spreadsheets ........................................................................................................5
5.5 New or Legacy Systems .................................................................................................5
5.6 Regulatory Guidelines ....................................................................................................5
6. Software Development and Validation – Category 4 and 5 Software .................................... 6
7. System Documentation .............................................................................................................. 6
8. Security of Computer Systems.................................................................................................. 6
9. Batch Release.............................................................................................................................. 7
10. Electronic Data, Electronic Records and Signature ................................................................ 7
11. Computerised Systems .............................................................................................................. 7
11.1 Wide Area Network (WAN) .............................................................................................7
11.2 Other Computing Systems .............................................................................................7
The GMP facility has Code of Good Manufacturing Practice (cGMP) licenses with the [List all licenses].
The core business focus is manufacturing and packaging of human and veterinary medicines in various
forms. These include sterile injectable vaccines, oral, powders, creams, ointments, lotions, pastes and
tablets and pour –on drenches.
This document aims to summarise the overall intentions and approach to the validation of automated system
or computer system (known hereafter as computerised systems).
It is intended to be a working document and will be periodically updated by site management responsible for
the execution of validation.
The control of computer systems which impact GMP activities is important to assure control of processes,
assessment of data, accuracy of manufacturing and control records and compliance with industry
regulations.
This guideline provides guidance on how to validate computer systems that relate to GMP. This document
should be considered as a guide; it is not intended to establish any mandatory or implied standard.
Alternative approaches may be applicable.
This document will define the validation of all GxP computerised systems used by [company] including,
where appropriate systems used by administration and quality groups (QA, QC, Regulatory Affairs
Validation). This document does not define the requirements for the validation of Excel spreadsheets.
3. Regulatory Standards
[Company] agrees to comply with Good Validation Practices for computerised systems as defined in the
code of GMP [reference].
[Company] will provide an appropriate level of competent resources to ensure the achievement of the
outlined Validation program, with consideration of the risk to quality associated with the manufacture of
products at [company] manufacturing sites.
The general authority and responsibilities for undertaken Validation projects are defined in the Validation
Master Plan (VAL-080)).
Copyright©www.gmpsop.com. All rights reserved
Unauthorized copying, publishing, transmission and distribution of any part of the content by electronic
means are strictly prohibited. Page 2 of 7
Standard Operating Procedure
Title: Computer Validation Master Plan
Cat. Description Examples
1 Infrastructure Software Operating systems, database managers, middleware, ladder
logic interpreters, network monitoring etc.
2 Previously (Firmware) no N/A
longer used
3 Non Configured Software Packages are systems that are exposed to high volume use in
Packages the marketplace such as Microsoft office programs including
spreadsheets or databases etc.
4 Configured Software Core components that can be configured by users. Each use of
Packages the standard product is specific for the particular user e. g.
LIMS has database field labels, screens and reports configured
by authorised users, ERP, DCS, SCADA, MES or
Chromatography data systems.
5 Custom Built Systems or Exclusively built solutions for a single or few customers e.g.
‘Bespoke” systems PLC with single purpose dedicated program
Includes operating systems and layered software components such as database managers, middleware,
and ladder logic interpreters. Also included are tools used to manage infrastructure, such as network
performance monitors, batch scheduling tools, etc. This class is considered to be low risk due to two primary
factors. First, infrastructure software is so ubiquitous that it is extremely unlikely that any unknown faults will
exist. Second, this software is challenged indirectly in all other testing activities. While proper function of IT
infrastructure may well be critical to satisfying a Critical Quality Attribute (CQA), infrastructure will almost
always have an extremely low probability of failure. Applications built on top of this software may fail, but it
will seldom be attributable to failure of infrastructure software.
Validation of infrastructure software is not required however records of the systems and their versions may
be maintained in the MCSL. If a new version of the system software is required, a review should be
conducted to determine the possible impact of the changes on the existing software application(s), and
system configuration files.
Category 2 (Firmware) is no longer a separate category since modern firmware can be so sophisticated
that there is no longer any justification for differentiation. Firmware can fit into any of the categories
depending on the nature of the embedded software.
This category has been expanded to include many examples of firmware. Non-Configured in this sense
refers to configuration to meet the needs of a business process; run-time parameters can still be configured.
Off-the-shelf software has grown in sophistication to the point where some examples are configurable to
meet the business process, and hence could be considered Category 4.
Equipment qualification or verification documentation will require a reference to firmware versions and
configuration settings. A validation assessment is required for all firmware upgrades. The qualification of
operation and control functions of firmware should be considered as part of new equipment qualification.
User-derived functionality developed using non-configured software (e.g. a report, macro or a program)
require validation if it involves GMP aspects. Implementing new versions of a NCS package require
assessment of the user-derived functionality with respect to impact on data integrity, security, algorithms,
high-level language code and macros. Additionally, due to the ease by which changes can be made by the
user, formal change control is imperative.
These software packages are called configured software and include Distributed Control Systems (DCS),
Supervisory Control and Data Acquisition packages (SCADA), manufacturing execution systems and some
LIMS and MRP packages. In these examples the system and platform should be well known and mature
Copyright©www.gmpsop.com. All rights reserved
Unauthorized copying, publishing, transmission and distribution of any part of the content by electronic
means are strictly prohibited. Page 4 of 7
Standard Operating Procedure
Title: Computer Validation Master Plan
6. Software Development and Validation – Category 4 and 5 Software
A User Requirements Specification (URS) shall be prepared specifying the objectives of any proposed GxP
related computer system, the data to be entered and stored, the flow of data, the information to be
produced, the limits of any variables and the operating program(s) and test programs, together with
examples of each document produced by the program, instructions for testing, operating and maintaining the
system and the names of the person or persons responsible for its development and operation.
The development, implementation and operation of a category 4 or 5 GxP related computer system shall be
carefully documented at all stages and each step proven to achieve its written objective under challenging
test conditions.
Software developers of Category 4 and 5 systems should follow a Software Quality Assurance Plan (SQAP)
and should be audited if possible for adherence to the plan. Vendors should be asked to provide written
assurance that software development or modification has followed the SQAP or an equivalent system.
A logic flow diagram or schematic for software should be prepared for critical evaluation against system
design / requirements / criteria.
Records should be available for the following aspects of a computer system validation:
Protocol for validation
General description of the system, the components and the operating characteristics
Diagrams of hardware layout/interaction
List of programs with brief description of each
System logic diagrams or other schematic form for software packages
Current configuration for hardware and software
Review of historical logs of hardware and software for development, start-up and normal run periods
Records of evaluation data to demonstrate system performs as intended (verification stage and
ongoing monitoring)
Backup and recovery procedures
Range of limits for operating variables
Details of formal change control procedure
Records of operator training
Details of access security levels/controls
Procedure for ongoing evaluation
Individual validation protocols for all qualifications and validations will define the actual validation testing
which will be required.
7. System Documentation
A written detailed description of the system should be produced (including diagrams as appropriate) and
kept up to date. It should describe the principles, objectives, security measures and scope of the system and
the main features of the way in which the computer is used and how it interacts with other systems and
procedures.
Suitable methods of preventing unauthorised entry shall be available, such as pass cards or personal user-
identity codes.
The recovery procedure to be followed in the event of a system breakdown shall be defined in writing. This
procedure should be designed to return the system to a previous state.