1. Name of the Project: Construction of HV/MV lines associated with the hydroelectric developments of JIJI and MULEMBWE
2. Project Activities Taking Place
The main Project activities during the 1st week of April 2022
Site S&H visits
- PPE Inspection
- Housekeeping Inspections
- Vehicle inspection
2.Review of HSE activities that were planned this week activities/ Success rate/ Challenges encountered/ Cost
General EHS training for the staff and workers at Project , Training includes
1 Environmental Awareness Training
2 General EHS Training
SL.N Training No of Cost for Type Of Duration Percentage Of Total Challenges Encounter
o People The Training of Compilation Expenditure
Attended Training Training for Last Week
1 Equipment Equipment 0BIF External NA 0% 0
Tools Inspection &Tools
0 16/02/2020+ 2/4
progress
5.Sanctions and performance of workers on the site for this week / Sanctions (penalties) and performance of workers on the site for this
week
Sl.No Sanctions Suspension Penalty EHS Violation Memo Sub Contractor Date Remarks
/Penalty /warning
1 Work stoppage NA NA 0 NA 28/03/2022 TO
02/04/2022
2 Suspension NA NA NA NA NA
3 EHS Violation NA NA 0 NA 28/03/2022 TO
Memo 02/04/2022
6.New HSE measures or strategies planned (planned) for improvement / New HSE measures and strategies projected (planned) for
improvement
0 16/02/2020+ 3/4
Checklist
Description Near First Aid Medical Restricted Lost Time Fatality Environmental Road Property damage
Misses Cases Treatment Work Incidents Incidents Traffic
cases Cases (LTI) Accident
This Week 0 0 0 0 0 0 0 0 0
Cumulative 0 0 0 0 0 0 0 0 0
0 16/02/2020+ 4/4