1st Week Report April 2022

This weekly safety report summarizes construction activities and safety performance for a project to build HV/MV power lines for two hydroelectric projects in JIJI and MULEMBWE. Key activities included site safety inspections and general environmental, health and safety training for staff and workers. No safety incidents or injuries were reported during the week. Planned improvements included developing pre-start checklists and implementing an EHS checklist to strengthen safety measures for foundation work, tower erection and stringing activities.

Uploaded by

Ramesh Pandian
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views

1st Week Report April 2022

This weekly safety report summarizes construction activities and safety performance for a project to build HV/MV power lines for two hydroelectric projects in JIJI and MULEMBWE. Key activities included site safety inspections and general environmental, health and safety training for staff and workers. No safety incidents or injuries were reported during the week. Planned improvements included developing pre-start checklists and implementing an EHS checklist to strengthen safety measures for foundation work, tower erection and stringing activities.

Uploaded by

Ramesh Pandian
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

CONTRACTOR WEEKLY SAFETY REPORT REVISION

Construction of HV/MV lines associated with the No. Date Page


hydroelectric developments of JIJI and MULEMBWE

0 16/02/2020+ 1/4

Originator: SAJILAL.AS
1. Name of the Project: Construction of HV/MV lines associated with the hydroelectric developments of JIJI and MULEMBWE
2. Project Activities Taking Place
The main Project activities during the 1st week of April 2022
 Site S&H visits
- PPE Inspection
- Housekeeping Inspections
- Vehicle inspection

2.Review of HSE activities that were planned this week activities/ Success rate/ Challenges encountered/ Cost
 General EHS training for the staff and workers at Project , Training includes
1 Environmental Awareness Training
2 General EHS Training
SL.N Training No of Cost for Type Of Duration Percentage Of Total Challenges Encounter
o People The Training of Compilation Expenditure
Attended Training Training for Last Week
1 Equipment Equipment 0BIF External NA 0% 0
Tools Inspection &Tools

2 First Aide 0 NA External 0hrs 0% NA Training agency


Training identification in
progress
3 Environmental 3 NA Internal 8hrs 2% NA Under Progress
Training
4 Fire Fighting 3 NA Internal 6hrs 2% NA Under Progress
Training
5 ERT 0 NA External 0hrs 0% NA Training agency
identification in
CONTRACTOR WEEKLY SAFETY REPORT REVISION

Construction of HV/MV lines associated with the No. Date Page


hydroelectric developments of JIJI and MULEMBWE

0 16/02/2020+ 2/4

progress

5.Sanctions and performance of workers on the site for this week / Sanctions (penalties) and performance of workers on the site for this
week

Sl.No Sanctions Suspension Penalty EHS Violation Memo Sub Contractor Date Remarks
/Penalty /warning
1 Work stoppage NA NA 0 NA 28/03/2022 TO
02/04/2022
2 Suspension NA NA NA NA NA
3 EHS Violation NA NA 0 NA 28/03/2022 TO
Memo 02/04/2022

6.New HSE measures or strategies planned (planned) for improvement / New HSE measures and strategies projected (planned) for
improvement

Sl.No Activity Existing HSE Measures Improvement Projection Date Of Compliance


Improvement
1 Foundation Toolbox Talk /Risk Assessment Pre-Start Checklist Before NA 0%
/Continues Supervision/Covid 19 commencing Activity
Prevention Protocol
2 Tower Erection Toolbox Talk /Risk Assessment Pre-Start Checklist /permit NA 0%
/Continues Supervision/Covid 19 System
Prevention Protocol
3 Stringing Tool Box Talk /Risk Assessment Pre-Start Checklist /permit
/Continues Supervision/Covid 19 System NA 0%
Prevention Protocol
4 General EHS Stringing /Erection/Foundation EHS Checklist 05/06/2022 5%
CONTRACTOR WEEKLY SAFETY REPORT REVISION

Construction of HV/MV lines associated with the No. Date Page


hydroelectric developments of JIJI and MULEMBWE

0 16/02/2020+ 3/4

Checklist

8.HS WEEKLY DATA


Frequency Rate (FR) = 0.00 (preliminary formula - for discussion)
Cumulative HSE Weekly Data

Description Near First Aid Medical Restricted Lost Time Fatality Environmental Road Property damage
Misses Cases Treatment Work Incidents Incidents Traffic
cases Cases (LTI) Accident
This Week 0 0 0 0 0 0 0 0 0

Cumulative 0 0 0 0 0 0 0 0 0

Frequency Rate (FR) = 0.00 (preliminary formula - for discussion)

Severity Rate (SR) = 0.00

Severity Rate (SR) = 0.00


Reporting Week
Description Manpower Cumulative
28-03-2022 To 02-04-2022
Indirect Staff Hours 0 0 0
Total Indirect Hours 0 0 0
Direct Construction Hours 30 1620 1620
CONTRACTOR WEEKLY SAFETY REPORT REVISION

Construction of HV/MV lines associated with the No. Date Page


hydroelectric developments of JIJI and MULEMBWE

0 16/02/2020+ 4/4

Total Direct Hours 30 1620 1620


Grand Total 30 1620 1620