0% found this document useful (0 votes)
248 views1 page

Proof of Address

The document is an electricity bill that provides details of charges for the billing period of June 28, 2022 to July 27, 2022. It lists the account holder's name and address, amount due of PHP 864.34, breakdown of electricity charges including generation, transmission, system loss, distribution and taxes. It also shows the customer's monthly electricity consumption chart and payment instructions.

Uploaded by

Clevia Tabinas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
248 views1 page

Proof of Address

The document is an electricity bill that provides details of charges for the billing period of June 28, 2022 to July 27, 2022. It lists the account holder's name and address, amount due of PHP 864.34, breakdown of electricity charges including generation, transmission, system loss, distribution and taxes. It also shows the customer's monthly electricity consumption chart and payment instructions.

Uploaded by

Clevia Tabinas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

For inquiries please contact our Call Center: 16211 (Residential) or

16210 (Business), or visit our website at www.meralco.com.ph .


CLEVIA COSTALES TABINAS
2 PADPAD MAABO ST L CORTEZ ST.
SAN NICOLAS POB CONCEPCION
CONCEPCION TARLAC
TARLAC Tel. No. 6901196
TIN -000-101-528-000-VAT

Page 1 of 2
CUSTOMER TIN: ELECTRIC BILL EB Invoice No. 3229096037286

Account Summary for Account Number 170590782-9


Current Charges
Balance From Previous Billing Total Amount Due
Amount Due Due Date

^ 0.00 Thank you ^ 864.34 08/06/2022 ^ 864.34

Service Info
Service ID Number : 301204170104
Rate : Residential
Contract in the name of : TABINAS, CLEVIA COSTALES
Service Address : 2 PADPAD MAABO ST. SAN NICOLAS POB.

CONCEPION, TARLAC

Billing Info
Bill Date : 27 July 2022
Meter Reading Date : 27 July 2022
Bill Period : 28 June 2022 to 27 July 2022
Due Date : 06 Aug 2022
Total KWH : 94
Total current amount : 864.34
Next Meter Reading : 27 Aug 2022
Your monthly electricity consumption chart
BREAKDOWN OF ELECTRICITY CHARGES 100
BILL SUBGROUP SUBTOTAL PERCENTAGE 90
Generation 426.17 49.31 % 80
Transmission 65.22 7.55 % 70
System Loss 37.31 4.32 % 60
Distribution (Meralco) 195.38 22.60 %
50
Subsidies 7.39 0.85 %
40
Government Taxes 87.92 10.17 %
30
Universal Charges 24.03 2.78 %
20
FiT-All (Renewable) 20.92 2.42 %
10
Other Charges 0.00 0.00 %
0
Se Oc No De Ja Fe Ma Ap My Ju Jl Au Se
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
customer metering facilities within your area this quarter. Average usage for 13 months
52 kWh/month

For authorized collecting agents


ATM / Phone Reference No. Meralco Reference No. Total Amount Due

0 12587796 3 1031 0 0 12587796 3 141031 0 141115 0 6 ^ 864.34

Please pay at any Meralco Business Center or through any accredited payment center on or before the due date.

CAS Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

You might also like