500
STARTER BARS
NORTH
1000
ENGINEERING,
50
BH01
CONSTRUCTION &
SETTLEMEN
50
TOP OF PILE
TOP OF LINER
SOFFIT OF HEADSTOCK
MAINTENANCE
AUTHORISATION
50
T RD
Director Date
20
40
60
BH02
℄ ABUTMENT A ℄ ABUTMENT B
CONCRETE GRADE - S50/20 Manager / Delivery Date
A
- 2 4
CONTROL LINE MC01 RPEQ
Manager / Asset Owner Date
1 3
N16 HELIX @ 150 PITCH.
C C
Manager / Project Initiator Date
PROJECT INFORMATION
12mm THICK PERMANENT Project Number 101841
STEEL CASING (GRADE 250)
PILE LAYOUT LEGEND: Coordinator Team Leader
SCALE 1:100
PILE LOCATION
Designer Checked
1 PILE NUMBER Northgroup Consulting 19.09.18 / 202225L002
Surveyor Survey Date / Ref. No.
BOREHOLES BY SMEC Survey Datum
REPORT No. 30032211 DATED 5TH OCTOBER 2019
BH01
MGA56 AHD
Horizontal Vertical
PILE MAIN VERTICAL TOP OF PILE TOE OF PILE ANTICIPATED PILE DESIGN SOCKET 0 1 2 4m
PILE I.D SOCKET INTO
LOCATION BARS R.L. R.L.* LENGTH 'L' (m)* LENGTH (m)*
SCALE 1:100 @A1
ABUTMENT A 1 10-N36 28.426 10.460 17.966 0 0.5 1m
SLS(kN) ULS
TYPE LOCATION
COMPRESSION COMPRESSION
2-Ø750mm BORED PILES ABUTMENT PILE 871 1117
HARD SANDY CLAY/CLAY
MIN 6000 SOCKET INTO
Ø750 4. PILE TOE LEVELS ARE NOMINAL AND SHALL BE BASED ON A FIELD GEOTECHNICAL
ASSESSMENT DURING PILE DRIVING AND RECOMMENDED PILE DESIGN PARAMETERS.
5. THE PILE LENGTH IN THE ABOVE SCHEDULE IS MEASURED FROM THE CUT-OFF LEVEL TO
BORED PILES WITH PERMANENT SACRIFICIAL STEEL LINERS THE NOMINAL TOE LEVEL AS SHOWN. 1.0m ALLOWANCE FOR EXPOSING REINFORCEMENT. PATHWAY AND PEDESTRIAN
SCALE 1:25 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE SUITABILITY OF BRIDGE DESIGN
NOMINAL PILE LENGTH.
10-N36 BARS VERT.
N16 LIGS AT 150 PITCH Rev. Date Description BORED PILE SETOUT
A 20/03/2020 Issued for Construction & DETAILS
Ø750
B 1/05/2020 Amended. Issued for Construction
C 7/05/2021 Revised for Construction
S50/20 CONCRETE GRADE Cardno (Qld) Pty Ltd | ABN 57 051 074 992
Drawn Checked Verified
80mm MIN COVER Level 11, 515 St Paul's Terrace SJ ML LM 20/03/2020 DRAWING NUMBER
Fortitude Valley, QLD 4300
Tel: 07 3369 9822 Fax: 07 3369 9722
Designed R.P.E.Q. Approved
Web: www.cardno.com.au LM 07718 19-573-032
SECTION A ã Cardno Limited All Rights Reserved.
This document is produced by Cardno Limited solely for the benefit of and use by
Cardno Drawing Number
Drawing Number Rev.
SCALE 1:25 - the client in accordance with the terms of the retainer. Cardno Limited does not
and shall not assume any responsibility or liability whatsoever to any third party
arising out of any use or reliance by third party on the content of this document.
790518-001-ST-1706 Drawing 32 of 61 Original Plan Size A1
25/01/21
25/01/21
25/01/21
25/01/21
ENGINEERING,
376
376
CONSTRUCTION &
MAINTENANCE
1200
1200
AUTHORISATION
1690
335 335
Manager / Delivery Date
3170
150
2890
RPEQ
Manager / Asset Owner Date
1200
1180
1200
PROJECT INFORMATION
Project Number 101841
MGA56 AHD
ELEVATION E1 ABUTMENT B - SIMILAR SECTION E ABUTMENT B - SIMILAR
- - Horizontal Vertical
SCALE 1:20 SCALE 1:20
100 140 1440 140 1440 140 100 ABUTMENT B ABUTMENT B EAST
200 ℄ PILE ℄ PILE R.L 32.062
KEEPER WALL ADDED C
66
BEARING PEDESTAL ABUTMENT B 0 0.5 0.8m
350
140
470
E Revisions
C -
Ø750 BORED PILE UNDER
1100
1680
BALUSTRADE HD Ø250 FORMED HOLE
BOLTS. REFER FOR DRAINAGE
ST-1745/1746 FOR OUTLET PIPE
ABUTMENT B WINGWALL 15 50
DETAILS.
POSITION ADJUSTED. (REFER 1585 1800
150
ABUTMENT B TYP. SECTION ON
2880
DWG No. 19-573-033 Original Issue Date: 17/03/2020
C
CONTROL LINE MP01 ℄
3650
1850
PROJECT DESCRIPTION
BRIDGE ℄
50
4 OFF PER ABUTMENT
R.L. 28.376
(ABUT B R.L. 28.754)
900 1850 900 350 PATHWAY AND PEDESTRIAN
BRIDGE DESIGN
200
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
Director Date
RPEQ
Manager / Asset Owner Date
150
Manager / Project Initiator Date
0 0.5 0.8m
ISSUE
Revisions
PROJECT DESCRIPTION
3-N12A SET C 3
EQUALLY SPACED
NARANGBA
DECK UNIT REINFORCEMENT PLAN OMARA ROAD
SCALE 1:20
STRANDS, FORMED HOLES, END DIAPHRAGMS, WEB AND BOTTOM FLANGE REINFORCEMENT NOT SHOWN FOR CLARITY
Director Date
RPEQ
Manager / Asset Owner Date
PROJECT INFORMATION
Project Number 101841
Designer Checked
MGA56 AHD
Horizontal Vertical
10
1727
10 - SET A @ 150
4 - N20A
7 - 12A 0 0.2 0.4m
3 - 24A
SCALE 1:10 @A1
Scales
ISSUE
Revisions
33 - SET B @ 150
Original Issue Date: 17/03/2020
PROJECT DESCRIPTION
10 - 12E LV
NARANGBA
OMARA ROAD
TYP
TYP
150
150
150
MAINTENANCE
AUTHORISATION
12F 12F
400
Director Date
G7
NO
T
Manager / Delivery Date
US
G1 G31 G8
16EC G8
16EC
ED
G33
16 VE
G1 RPEQ
Manager / Asset Owner Date
Designer Checked
MGA56 AHD
SECTION 5 SECTION 6 SECTION 7
SCALE 1:10 1725 SCALE 1:10 1725 SCALE 1:10 1725 Horizontal Vertical
0 0.2 0.4m
ISSUE
7-12V
7-12V LV 12A
Revisions
G2
TYP
TYP
TYP
150
150
150
150
4 N20A
G7
16VE
NO
G33
NARANGBA
G5 G5 OMARA ROAD
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
111
350
220
470
239
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21
25/01/21