DC Line Pole

Uploaded by

Tukaram Pawar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
365 views

DC Line Pole

Uploaded by

Tukaram Pawar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

H

D
A

G
E
C

J
I
CLEARANCE TO BE MAINTAINED (AS PER IE RULE-77, 79, 80-1956)

1 MINIMUM CLEARANCE TO EARTH IN AIR 380 MM


14

2 BETWEEN PHASE TO PHASE 1500 MM


50 1350 1350 50

14
3 BETWEEN BOTTOM MOST CONDUCTOR TO GUARD WIRE 915 MM
200

4 BETWEEN LINE TO GROUND CLEARANCE:


13

A. PLACES INACCESSIBLE TO VEHICLE TRAFFIC AND


ELSEWHERE THAN ALONG STREET. 5200 MM

13
B. ALONG STREETS 5800 MM
1500

C. ACROSS STREETS 6100 MM


ISMC 100x50x6
5 BETWEEN POWER LINE TO BUILDINGS/ TREES:
12

12
A. VERTICAL FROM BUILDINGS/ TREES 3660 MM
B. HORIZONTAL FROM BUILDINGS/ TREES 1830 MM
1500

BILL OF MATERIAL - TANGENT POLE

05 ITEM NO. DESCRIPTION QTY


11

11
02 RSJ POLE 152X152X37.1- 13M FOR
01 1 No.
AL59 PANTHER CONDUCTOR
02 CROSS ARM ISMC100x50x6-2800mm Long 6 Nos.
650

04 03 CROSS ARM SUPPORT CLAMP 6 Pairs.


10

10
03 04 DISC INSULATOR BASE PLATE- (300x75x6mm) 12 Nos.
33 KV 70KN DISC INSULATOR WITH
05 6 Nos.
06 ACCESSORIES (COMPOSITE)

06 BRACING ISA 50x50x6mm-1500mm 6 Nos.


03
9

9
07 DANGER BOARD 1 Nos.
08 EARTHING 1 Set
01 09 BARBED WIRE-12 SWG GI WIRE 1 Set
10 BARBED WIRE SUPPORT CLAMP 2 Pairs.
11 BOLTS & NUTS 1 Lot
8

8
NOTES:-
13000

1. ALL DIMENSIONS ARE IN mm.


2. CLEARANCE OF MORE THAN 610mm SHALL BE MAINTAINED BETWEEN M.S.
7

7
PARTS AND LIVE JUMPER IN ALL THE PLACES.
3. ALL HOLES ARE 17.5mm.Ø FOR 16mm.Ø BOLTS UNLESS OTHERWISE
7180

SPECIFIED.
07
4. POLE SHALL BE EARTHED THROUGH COIL EARTH USING S.W.G 8 G.I WIRE
6

6
BONDING POLE TOP BRACKET AND CROSS ARM.
09 5. RECOMMENDED SPAN LENGTH -60 Mtr. FOR AL59 PANTHER CONDUCTOR.

10
5

5
M10x35MM
BOLT,NUT&DOUBLE
WASHER
08
4

8 SWG G.I WIRE


300

REV. DATE DESCRIPTION BY CHKD APPD


150

GL GL
3

DEVELOPER : ORIANO CLEAN ENERGY PVT. LTD.

Consultant : TRIVONIX POWERCON INDIA PVT. LTD.


1500

Ø300 FOUNDATION DRAWING TITLE : 33KV D/C PIN POINT


2000
2

CONCRETE 1:2:4
PROJECT : 975 MW HYBRID PROJECT KURNOOL, ANDHRA PRADESH
Ø300

PREPARED BY CHECKED BY APPROVED BY


-- -- --
1

Ø300
DATE: 01-10-2023 SCALE: NTS SHEET NO.: 01 OF 03
DRAWING NO. -- REV: R0
H
D
A

G
E
C

J
I
H
D
A

G
E
C

J
I
CLEARANCE TO BE MAINTAINED (AS PER IE RULE-77, 79, 80-1956)

1 MINIMUM CLEARANCE TO EARTH IN AIR 380 MM


14

2 BETWEEN PHASE TO PHASE 1500 MM


800 1500 800

14
3 BETWEEN BOTTOM MOST CONDUCTOR TO GUARD WIRE 915 MM

4 BETWEEN LINE TO GROUND CLEARANCE:


13

A. PLACES INACCESSIBLE TO VEHICLE TRAFFIC AND


ELSEWHERE THAN ALONG STREET. 5200 MM

13
3350 B. ALONG STREETS 5800 MM
1525

C. ACROSS STREETS 6100 MM

5 BETWEEN POWER LINE TO BUILDINGS/ TREES:


06
12

12
A. VERTICAL FROM BUILDINGS/ TREES 3660 MM
B. HORIZONTAL FROM BUILDINGS/ TREES 1830 MM
07
BILL OF MATERIAL - SECTION POLE
1525

ITEM NO. DESCRIPTION QTY


11

11
02 RSJ POLE 152X152X37.1- 13M FOR 02 Nos.
01
AL59 PANTHER CONDUCTOR
02 CROSS ARM ISMC100x50x6-3350mm Long 06 Nos.
03 CROSS ARM SUPPORT CLAMP 06 Pairs.
08
14 03
10

10
04 ISA 50x50x6mm-1650mm 02 Nos.

13 05 ISA 50x50x6mm-2900mm 02 Nos.


33kV PIN INSULATOR WITH
06 06 NOs.
ACCESSORIES (COMPOSITE)
WITH THREADED BOLTS & NUTS
9

9
07 PIN INSULATOR BASE PLATE- (300x75x6mm) 12 Nos.
04
08 33 KV 90KN DISC INSULATOR WITH ACCESSORIES (COMPOSITE) 12 Nos.

09 DANGER BOARD 02 Nos.


10 EARTHING 01 Set
8

8
2750

11 BARBED WIRE-12 SWG GI WIRE 02 Set

05 12 BARBED WIRE SUPPORT CLAMP 02 Pairs.


13000

STAY SET 12M LONG 7 NOS OF 4MM STRAND GALVANIZED STEEL


01 STAY WIRE WITH SCREW TYPE GS ANCHOR WITH 2.5M LONG 25MM
DIA EXTENTION ROD AND GUY WIRE ATTACHMENT EYE & STAY
7

7
13 04 Set.
INSULATOR WITH STRAIN FIBER ROD
7650

14 CLAMP FOR STAY SET 02 Pairs.

15 BOLTS & NUTS 01 Lot

09 NOTES:-
6

6
1. ALL DIMENSIONS ARE IN mm.
2. CLEARANCE OF MORE THAN 610mm SHALL BE MAINTAINED BETWEEN M.S. PARTS AND LIVE
JUMPER IN ALL THE PLACES.
11 3. ALL HOLES ARE 17.5mm.Ø FOR 16mm.Ø BOLTS UNLESS OTHERWISE SPECIFIED.
4. POLE SHALL BE EARTHED THROUGH COIL EARTH USING S.W.G 8 G.I WIRE BONDING POLE TOP
3145

12 BRACKET AND CROSS ARM.


5

5
5. RECOMMENDED SPAN LENGTH -60 Mtr. FOR AL59 PANTHER CONDUCTOR.
4

4
300
150

10
8 SWG G.I WIRE
REV. DATE DESCRIPTION BY CHKD APPD
GL GL
3

DEVELOPER : ORIANO CLEAN ENERGY PVT. LTD.

Consultant : TRIVONIX POWERCON INDIA PVT. LTD.


2600

1500

Ø300 FOUNDATION
DRAWING TITLE : 33KV D/C SINGLE CUT POINT
2000

CONCRETE 1:2:4
2

PROJECT : 975 MW HYBRID PROJECT KURNOOL, ANDHRA PRADESH


Ø300

CHECKED BY APPROVED BY
100

PREPARED BY
-- -- --
1

Ø300 Ø300
DATE: 01-10-2023 SCALE: NTS SHEET NO.: 02 OF 03
DRAWING NO. -- REV: R0
H
D
A

G
E
C

J
I
H
D
A

G
E
C

J
I
CLEARANCE TO BE MAINTAINED (AS PER IE RULE-77, 79, 80-1956)

1 MINIMUM CLEARANCE TO EARTH IN AIR 380 MM


14

2 BETWEEN PHASE TO PHASE 1500 MM


875 1500 875

14
3 BETWEEN BOTTOM MOST CONDUCTOR TO GUARD WIRE 915 MM

4 BETWEEN LINE TO GROUND CLEARANCE:


13

A. PLACES INACCESSIBLE TO VEHICLE TRAFFIC AND


300

ELSEWHERE THAN ALONG STREET. 5200 MM

13
03
B. ALONG STREETS 5800 MM

C. ACROSS STREETS 6100 MM


1525

06 5 BETWEEN POWER LINE TO BUILDINGS/ TREES:


12

12
A. VERTICAL FROM BUILDINGS/ TREES 3660 MM
B. HORIZONTAL FROM BUILDINGS/ TREES 1830 MM
07

02
11

11
1525

02
02
10

10
BILL OF MATERIAL - 90° POLE
08 ITEM NO. DESCRIPTION QTY

01 RSJ POLE 152X152X37.1- 13M FOR 03 Nos.


AL59 PANTHER CONDUCTOR
9

9
02 CROSS ARM ISMC100x50x6-3350mm Long 12 Nos.
PLAN
03 CROSS ARM SUPPORT CLAMP 09 Pairs.
01
04 ISA 50x50x6mm Angle 1650mm 04 Nos.
05 ISA 50x50x6mm Angle 2900mm 04 Nos.
33kV PIN INSULATOR WITH
8

8
06 06 NOs.
ACCESSORIES (COMPOSITE)
WITH THREADED BOLTS & NUTS
13000

04 07 PIN INSULATOR BASE PLATE- (300x75x6mm) 12 Nos.


08 33 KV 90KN DISC INSULATOR WITH 12 Nos.
ACCESSORIES (COMPOSITE)
7

7
09 DANGER BOARD 03 Nos.
2750

10 EARTHING 02 Set
05 11 BARBED WIRE-12 SWG GI WIRE 03 Set
12 BARBED WIRE SUPPORT CLAMP 02 Pairs.
6

6
STAY SET 12M LONG 7 NOS OF 4MM
STRAND GALVANIZED STEEL STAY WIRE WITH
SCREW TYPE GS ANCHOR WITH 2.5M LONG
13 04 Set.
09 25MM DIA EXTENTION ROD AND GUY WIRE
ATTACHMENT EYE & STAY INSULATOR WITH
5

5
STRAIN FIBER ROD

14 CLAMP FOR STAY SET 02 Pairs.


11
15 BOLTS & NUTS 01 Lot
12
4

4
300
150

10
8 SWG G.I WIRE
REV. DATE DESCRIPTION BY CHKD APPD
GL GL
3

DEVELOPER : ORIANO CLEAN ENERGY PVT. LTD.

Consultant : TRIVONIX POWERCON INDIA PVT. LTD.


2600

1500

Ø300 FOUNDATION DRAWING TITLE : 33KV D/C DOUBLE CUT POINT


2000
2

CONCRETE 1:2:4
PROJECT : 975 MW HYBRID PROJECT KURNOOL, ANDHRA PRADESH
Ø300

PREPARED BY CHECKED BY APPROVED BY


-- -- --
1

Ø300 Ø300
DATE: 01-10-2023 SCALE: NTS SHEET NO.: 03 OF 03
DRAWING NO. -- REV: R0
ELEVATION
H
D
A

G
E
C

J
I