Daily QAQC Check Sheets
Daily QAQC Check Sheets
3.9
- Check / monitoring welding parameters e.g. voltage, amperage etc. are as per approved WPS's.
3.10 - Check shielding gas and purging gas flow rate as per WPS's
3.11 - Check grinding discs are the correct type for materials (DSS or CS).
3.12 - Check measuring equipment is calibrated and controlled
3.13 - Check interrun cleaning sufficient.
3.14 - Check welding sequence is correct.
- Violating general welding procedure / practice (Unqualified welder, deviation from range & limitation, no
3.15
quiver or portable storage, quivers not heated or connected to power source, using cold low hydrogen
electrode and un-ethic attitude in welding works)
4 Visual Inspection
4.1 - Check information boxes are being completed and corrected as per procedure.
4.2 - Check weld profiles i.e. contour, concavity, convexity, reinforcement, etc…
4.3 - Check for any surface defects, i.e. slag, spatter, rust, porosity, etc…
4.4 - Check for any distortions i.e. misalignments, etc…
5 NDT
5.1 - Check that visual inspection is acceptable before NDT.
5.2 - Check that the requirement of NDT is carried out as per specficication.
5.3 - Check all NDT clearance before sign off on IRN's as per procedures.
6 Report
6.1 - Check that all inspection reports and drawings are update daily.
7 Safety
7.1 - Report all unsafe action.
8 Pressure Test
8.1 - Ensure procedural instructions are followed.
8.2 - Ensure calibration of testing equipment is correct and updated.
8.3 - Check NDT clearance is completed prior to testing.
8.4 - Witness the test and sign off at starting and after completion
9 Outstanding list / Punch list
9.1 - Prepare punchlist for work not completed or unsatisfactory.
9.2 - Final check of platform, tie-downs before sailaway.
ISSUE ENCOUNTED & OR ACTION TAKEN :