0% found this document useful (0 votes)
39 views25 pages

Daily Summary Log Sheet2079

This document is a daily log sheet from the Trishuli Hydropower Station in Nepal that records system voltages, frequencies, unit loads, total loads, and meter readings over 24 hours. Key information includes: - System voltage was consistently around 6.7kV and frequency was stable at 50Hz. - Peak load occurred between 5:00-9:30 AM and average load was highest from 5:30-9:30 PM. - Meter readings show increases in total generation, local exports, and exports to various distribution centers over the past 24 hours.

Uploaded by

Prashant Thapa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views25 pages

Daily Summary Log Sheet2079

This document is a daily log sheet from the Trishuli Hydropower Station in Nepal that records system voltages, frequencies, unit loads, total loads, and meter readings over 24 hours. Key information includes: - System voltage was consistently around 6.7kV and frequency was stable at 50Hz. - Peak load occurred between 5:00-9:30 AM and average load was highest from 5:30-9:30 PM. - Meter readings show increases in total generation, local exports, and exports to various distribution centers over the past 24 hours.

Uploaded by

Prashant Thapa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 25

NEEPAL ELECTRICTY AUTHORITY

TRISHULI HYDROPOWER STATION


DAILY SUMMARY LOG SHEET

System System voltage/Frequency 66Kv BUS LOAD IN MW


voltage/Frequency
TIME 66Kv BUS Total Load
Station KV HZ KV HZ U-1 U-2 U-3 U-4 U-5 U-6 U-7 MW MVAR
Hour
PM
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0:00
AM

Peak Load: Peak Load


Max Load: AM 5:00 to 9:30
Average LoAD: PM 17:30 to 21:30

Shift Incharge
Nepali 6/28/2079

English 10/14/2022
Date

Meter Reading
D-Tank Canal
Level Discharge
FEET CUSECS Previous Present DIFFERENCE
UNIT-1 7 9 2
UNIT-2 0
UNIT-3 0
UNIT-4 0
UNIT-5 0
UNIT-6 0
UNIT-7 0
Total Generation
Station-1 4488500 4488770 270
Station-2
Station Total
11 Kv Local EXP 49450162 49487259 37097
IMP 0
Balaju-1 EXP 411196 411464 268
IMP 20850 20850 0
Balaju -2 EXP 1995937851 1996203418 265567
IMP 402605 402605 0
Devighat EXP 14976693 14976693 0
IMP 27148573 27148573 0
Chilime EXP 163218 163218 0
IMP 252944 253251 307
Engineer Icharge
NEEPAL ELECTRICTY AUTHORITY
TRISHULI HYDROPOWER STATION
DAILY SUMMARY LOG SHEET

System System voltage/Frequency 66Kv BUS LOAD IN MW


voltage/Frequency
TIME 66Kv BUS
Station KV HZ KV HZ U-1 U-2 U-3 U-4 U-5
Hour
PM
1:00 6.7 50
2:00 6.7 50
3:00 6.7 50
4:00 6.7 49.99
5:00 6.7 50.07
6:00 6.6 50.03
7:00 6.5 50.14
8:00 6.5 50.02
9:00 6.5 50
10:00 6.5 50.01
11:00 6.5 50.02
12:00 6.5 49.95
13:00 6.5 50.02
14:00 6.4 50.02
15:00 6.4 49.95
16:00 6.4 50.02
17:00 6.5 50.04
18:00 6.5 49.05
19:00 6.5 50.04
20:00 6.5 50.04
21:00 6.7 49.05
22:00 6.7 50.01
23:00 6.7 49.99
0:00 6.7 50.04
AM

Peak Load: Peak Load


Max Load: AM 5:00 to 9:30
Average LoAD: PM 17:30 to 21:30

Shift Incharge
Nepali 6/29/2079

N
English 10/15/2022
Date

LOAD IN MW Meter Reading


D-Tank Canal
Total Load Level Discharge
U-6 U-7 MW MVAR FEET CUSECS Previous
UNIT-1 7
UNIT-2
UNIT-3
UNIT-4
UNIT-5
UNIT-6
UNIT-7
Total Generation
Station-1 4488770
Station-2
Station Total
11 Kv Local EXP 49487259
IMP
Balaju-1 EXP 411464
IMP 20850
Balaju -2 EXP 1996203418
IMP 402605
Devighat EXP 14976693
IMP 27148573
Chilime EXP 163218
IMP 253251

Engineer Icharge
6/29/2079

10/15/2022

Meter Reading

Present DIFFERENCE
9 2
0
0
0
0
0

4488990 220

49523551 36292
0
411718 254
20850 0
1996455705 252287
402605 0
14976693 0
27148573 0
163218 0
253543 292
584
NEEPAL ELECTRICTY AUTHORITY
TRISHULI HYDROPOWER STATION
DAILY SUMMARY LOG SHEET

System System voltage/Frequency 66Kv BUS LOAD IN MW


voltage/Frequency
TIME 66Kv BUS
Station KV HZ KV HZ U-1 U-2 U-3 U-4 U-5
Hour
PM
1:00 6.7 50
2:00 6.7 50
3:00 6.7 50
4:00 6.7 49.99
5:00 6.7 50.07
6:00 6.6 50.03
7:00 6.5 50.14
8:00 6.5 50.02
9:00 6.5 50
10:00 6.5 50.01
11:00 6.5 50.02
12:00 6.5 49.95
13:00 6.5 50.02
14:00 6.4 50.02
15:00 6.4 49.95
16:00 6.4 50.02
17:00 6.5 50.04
18:00 6.5 49.05
19:00 6.5 50.04
20:00 6.5 50.04
21:00 6.6 49.05
22:00 6.6 50.01
23:00 6.6 49.99
0:00 6.6 50.04
AM

Peak Load: Peak Load


Max Load: AM 5:00 to 9:30
Average LoAD: PM 17:30 to 21:30

Shift Incharge
Nepali 30/06/2079

N
English 10/16/2022
Date

LOAD IN MW Meter Reading


D-Tank Canal
Total Load Level Discharge
U-6 U-7 MW MVAR FEET CUSECS Previous
UNIT-1
UNIT-2
UNIT-3
UNIT-4
UNIT-5
UNIT-6
UNIT-7
Total Generation
Station-1 4488990
Station-2
Station Total
11 Kv Local EXP 49523551
IMP
Balaju-1 EXP 411718
IMP 20850
Balaju -2 EXP 1996455705
IMP 402605
Devighat EXP 14976693
IMP 27148573
Chilime EXP 163218
IMP 253543

Engineer Icharge
30/06/2079

10/16/2022

Meter Reading

Present DIFFERENCE
0
0
0
0
0
0

4489220 230

49559838 36287
0
411950 232
21352 502
1996686314 230609
403109 504
14976693 0
27148573 0
163275 57
253813 270
540
NEEPAL ELECTRICTY AUTHORITY
TRISHULI HYDROPOWER STATION
DAILY SUMMARY LOG SHEET

System
voltage/Frequency System voltage/Frequency 66Kv BUS LOAD IN MW
TIME 66Kv BUS
Station KV HZ KV HZ U-1 U-2 U-3 U-4 U-5
Hour
PM
1:00 66 50.02
2:00 66 50.04
3:00 65 49098
4:00 65 49.94
5:00 65 50.06
6:00 64 49.96
7:00 64 49.98
8:00 64 50.02
9:00 64 49.98
10:00 64 50.04
11:00 63 50.02
12:00 63 50.03
13:00 64 49.86
14:00 65 49.5
15:00 65 50
16:00 65 50.02
17:00 65 49.96
18:00 65 50
19:00 65 50.01
20:00 66 50.02
21:00 66 50.02
22:00 66 50.02
23:00 66 50.02
0:00 66 49.58
AM

Peak Load: Peak Load


Max Load: AM 5:00 to 9:30
Average LoAD: PM 17:30 to 21:30

Shift Incharge
Y Nepali 31/6/2079
N
English 17/10/2022
Date

LOAD IN MW D-Tank Canal Meter Reading


Total Load Level Discharge
U-6 U-7 MW MVAR FEET CUSECS Previous Present
UNIT-1
UNIT-2
UNIT-3
UNIT-4
UNIT-5
UNIT-6
UNIT-7
Total Generation
Station-1 4489220 4489430
Station-2
Station Total
11 Kv Local EXP 49559838 49595748
IMP
Balaju-1 EXP 411950 412186
IMP 21352 21352
Balaju -2 EXP 1996686314 1996921998
IMP 403109 403109
Devighat EXP 14976693 14976693
IMP 27148575 27148575
Chilime EXP 163275 163275
IMP 253813 254087

Engineer Icharge
/6/2079

10/2022

ng

DIFFERENCE
0
0
0
0
0
0

210

35910
0
236
0
235684
0
0
0
0
274
548
NEEPAL ELECTRICTY AUTHORITY

TRISHULI HYDROPOWER STATION


DAILY SUMMARY LOG SHEET
System
TIME voltage/Frequency System voltage/Frequency 66Kv BUS LOAD IN MW
66Kv BUS
Station KV HZ KV HZ U-1 U-2 U-3 U-4 U-5
Hour
PM
1:00 6.7 50 67 49.98
2:00 6.7 50 66 50
3:00 6.7 50 66 49.98
4:00 6.7 49.99 66 49.99
5:00 6.7 50.07 66 50.01
6:00 6.6 50.03 65 50.03
7:00 6.5 50.14 65 50.03
8:00 6.5 50.02 65 50.03
9:00 6.5 50 63 50.01
10:00 6.5 50.01 63 50
11:00 6.5 50.02 64 50
12:00 6.5 49.95 64 50
13:00 6.5 50.02 64 50.02
14:00 6.4 50.02 63 50.05
15:00 6.4 49.95 63 50.05
16:00 6.4 50.02 64 50
17:00 6.5 50.04 65 50
18:00 6.5 49.05 64 49.95
19:00 6.5 50.04 65 50.04
20:00 6.5 50.04 65 50.02
21:00 6.7 49.05 65 50.06
22:00 6.7 50.01 65 49.99
23:00 6.7 49.99 66 50.04
0:00 6.7 50.04 66 50.02
AM

Peak Load: Peak Load


Max Load: AM 5:00 to 9:30
Average LoAD: PM 17:30 to 21:30

Shift Incharge
Nepali 7/1/2079

N
English 10/18/2022
Date

D-Tank Canal
LOAD IN MW Total Load Meter Reading
Level Discharge

U-6 U-7 MW MVAR FEET CUSECS Previous


UNIT-1
UNIT-2
UNIT-3
UNIT-4
UNIT-5
UNIT-6
UNIT-7
Total Generation
Station-1 4489430
Station-2
Station Total
11 Kv Local EXP 49595748
IMP
Balaju-1 EXP 412186
IMP 21352
Balaju -2 EXP 1996921898
IMP 403109
Devighat EXP 14976693
IMP 27148573
Chilime EXP 163275
IMP 254087

Engineer Icharge
7/1/2079

10/18/2022

Meter Reading

Present DIFFERENCE

neration
4489640

49630381 34633
0
412448 262
213521 192169
1997181486 259588
403109 0
14976693 0
27148573 0
163275 0
254385 298
596
NEEPAL ELECTRICTY AUTHORITY
TRISHULI HYDROPOWER STATION
DAILY SUMMARY LOG SHEET

System System voltage/Frequency 66Kv BUS LOAD IN MW


voltage/Frequency
TIME 66Kv BUS
Station KV HZ KV HZ U-1 U-2 U-3 U-4 U-5
Hour
PM
1:00 6.7 50
2:00 6.7 50
3:00 6.7 50
4:00 6.7 49.99
5:00 6.7 50.07
6:00 6.6 50.03
7:00 6.5 50.14
8:00 6.5 50.02
9:00 6.5 50
10:00 6.5 50.01
11:00 6.5 50.02
12:00 6.5 49.95
13:00 6.5 50.02
14:00 6.4 50.02
15:00 6.4 49.95
16:00 6.4 50.02
17:00 6.5 50.04
18:00 6.5 49.05
19:00 6.5 50.04
20:00 6.5 50.04
21:00 6.7 49.05 1
22:00 6.7 50.01 3 3
23:00 6.7 49.99 3 3
0:00 6.7 50.04 3 3
AM

Peak Load: Peak Load


Max Load: 6 AM 5:00 to 9:30
Average LoAD: PM 17:30 to 21:30

Shift Incharge
Nepali 7/2/2079

N
English 10/19/2022
Date

LOAD IN MW Meter Reading


D-Tank Canal
Total Load Level Discharge
U-6 U-7 MW MVAR FEET CUSECS Previous
UNIT-1
UNIT-2 32284698
UNIT-3
UNIT-4 70602104
UNIT-5
UNIT-6
UNIT-7
Total Generation
Station-1 448964
Station-2
Station Total
11 Kv Local EXP 49630381
IMP
Balaju-1 EXP 412448
IMP 21352
Balaju -2 EXP 1997181486
IMP 403109
Devighat EXP 14976693
IMP 27148573
Chilime EXP 163218
500 IMP 254385
1000
1 0.1 500
6 0.6 500
6 0.6 600
6 0.6 600

Engineer Icharge
7/2/2079

10/19/2022

Meter Reading

Present DIFFERENCE

32293037 8339
32293037 32293037
32293037 -38309067
32293037 32293037
32293037 32293037
32293037 0
neration 58578383
448990 26

-49630381
0
412711 263
21352 0
1997444610 263124
403121 12
14976693 0
27148573 0
163218 0
254679 294
588
NEEPAL ELECTRICTY AUTHORITY
TRISHULI HYDROPOWER STATION
DAILY SUMMARY LOG SHEET
System
TIME voltage/Frequency System voltage/Frequency 66Kv BUS LOAD IN MW
66Kv BUS
Station KV HZ KV HZ U-1 U-2 U-3 U-4 U-5
Hour
PM
1:00 6.6 49.99 0 0 2.5 3 0
2:00 6.6 50 0 0 2.5 3 0
3:00 6.6 50 0 0 2.5 3 0
4:00 6.6 50 0 0 2.5 3 0
5:00 6.6 49.49 0 0 2.5 3 0
6:00 6.6 50.02 0 0 2.5 3 0
7:00 6.6 50.03 0 0 2.5 3 0
8:00 6.3 50.04 0 0 2.5 3 0
9:00 6.3 50.03 0 0 2.5 3 0
10:00 6.2 50.08 3 0 2.5 3 0
11:00 6.4 50.02 3 0 2.5 3 0
12:00 6.4 50.05 2 0 2.5 3 0
13:00 6.4 50.04 3 0 2.5 3 0
14:00 6.4 50.03 2 2 2.5 3 0
15:00 6.4 50.07 3 0 2.5 3 0
16:00 6.5 49.58 3 0 2.5 3 0
17:00 6.5 50.02 3 0 2 3 0
18:00 6.5 50.04 1 0 2.5 3 0
19:00 6.5 50.02 3 0 2.5 3 0
20:00 6.5 50.02 3 0 2.5 3 0
21:00 6.6 49.56 2 0 2 3 0
22:00 6.6 49.58 2 0 2 3 0
23:00 6.6 50 2 0 2 3 0
0:00 6.6 50 2 0 2 2 0
AM

Peak Load: 14.5 Peak Load


Max Load: 14.5 AM 5:00 to 9:30
Average LoAD: 10.645 PM 17:30 to 21:30

Shift Incharge
Y Nepali 7/4/2079
ON
English 10/21/2022
Date

D-Tank Canal
LOAD IN MW Total Load Meter Reading
Level Discharge

U-6 U-7 MW MVAR FEET CUSECS Previous Present


UNIT-1 68819344 68851370
UNIT-2 32347797 32349346
3 2.5 11 1.1 64.9 1100 UNIT-3 41837896 41895671
3 0 8.5 0.9 64.5 800 UNIT-4 70667993 70732168
3 0 8.5 0.9 64 800 UNIT-5 61952854 61952854
3 0 8.5 0.9 64.4 800 UNIT-6 55263327 55329706
3 0 8.5 0.9 65.3 800 UNIT-7 56681160 56714751
3 0 8.5 0.9 65.7 800 Total Generation
3 0 8.5 0.9 65.6 800 Station-1 4490480 4491240
3 3 11.5 1.2 65 1100 Station-2
3 3 11.5 1.2 65.2 1100 Station Total
3 0 11.5 1.2 65.5 600 11 Kv Local EXP 49698826 49732121
3 0 11.5 1.2 64.5 1000 IMP
3 0 10.5 1.1 64.4 1000 Balaju-1 EXP 413064 413460
3 0 11.5 1.2 1400 IMP 21352 21990
3 3 15.5 1.6 66.4 1400 Balaju -2 EXP 1997796467 1998168760
3 3 14.5 1.5 66.1 1400 IMP 403121 403121
3 3 14.5 1.5 66 1400 Devighat EXP 14976693 14976693
3 3 14 1.2 65.8 1400 IMP 27148575 27148575
3 3 12.5 1.3 65.4 1100 Chilime EXP 163275 163312
3 3 14.5 1.5 65.4 1300 IMP 254978 255270
3 3 14.5 1.5 65.5 1300
3 3 13 1.3 65.2 1300
3 3 13 1.3 65.7 1300
3 3 13 1.3 65.9 1300
2 2 10 1 65.7 900

Engineer Icharge
/4/2079

/21/2022

ng

DIFFERENCE
32026
1549
57775
64175
0
66379
33591
255495
760

33295
0
396
638
372293
0
0
0
37
292
584
NEEPAL ELECTRICTY AUTHORITY
TRISHULI HYDROPOWER STATION
DAILY SUMMARY LOG SHEET
System
TIME voltage/Frequency System voltage/Frequency 66Kv BUS LOAD IN MW
66Kv BUS
Station KV HZ KV HZ U-1 U-2 U-3 U-4 U-5
Hour
PM
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0:00
AM

Peak Load: 14.5 Peak Load


Max Load: 14.5 AM 5:00 to 9:30
Average LoAD: 10.645 PM 17:30 to 21:30

Shift Incharge
Y Nepali 7/3/2079
ON
English 10/20/2022
Date

D-Tank Canal
LOAD IN MW Total Load Meter Reading
Level Discharge

U-6 U-7 MW MVAR FEET CUSECS Previous Present DIFFERENCE


UNIT-1 68819344 68819344 0
UNIT-2 32347797 32347797 0
UNIT-3 41837896 41837896 0
UNIT-4 70667993 70667993 0
UNIT-5 61952854 61952854 0
UNIT-6 55263327 55263327 0
UNIT-7 56681160 56681160 0
Total Generation 0
Station-1 4490480 4491240 760
Station-2
Station Total
11 Kv Local EX 49698826 49732121 33295
IMP 0
Balaju-1 EXP 413064 413460 396
IMP 21352 21990 638
Balaju -2 EXP 2E+09 2E+09 372293
IMP 403121 403121 0
Devighat EXP 14976693 14976693 0
IMP 27148575 27148575 0
Chilime EXP 163275 163312 37
IMP 254978 255270 292
584

Engineer Icharge
DIFFERENCE

You might also like