08.10.2023 - Sunday Work Program and Progress Status

The document outlines a wood works schedule for a 10-storey residential development project. It details the delivery and installation dates for wooden doors on each floor, including main apartment doors, laundry room doors, stair doors, lift lobby doors, and others. Progress is being tracked with 13 of 13 door frames and doors installed on the first 4 floors according to the schedule.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

08.10.2023 - Sunday Work Program and Progress Status

The document outlines a wood works schedule for a 10-storey residential development project. It details the delivery and installation dates for wooden doors on each floor, including main apartment doors, laundry room doors, stair doors, lift lobby doors, and others. Progress is being tracked with 13 of 13 door frames and doors installed on the first 4 floors according to the schedule.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

WOOD WORK PROGRAMME SCHEDULE Date:07-08-2023

Project : 10 Storey residential development, Dilmunia.


Consultant : M/s MSCEB
Main Contractor : M/s Kazerooni Contractor
Sub Contractor : M/s Sunday International
Subject : Wood Works work schedule
Item Description Start Date End Date Remarks
Wooden Doors
WOODEN DOOR DELIVERY & FIXING
Note: sample ironmongery for each type of doors in GF to 9th floor ie. Each type 1 nos shoud provided to us by 01-07-2023 (to cut the provisions for
ironmongey on doors before polishing)
FIRST FLOOR TO 5th FLOOR FR DOORS

* Apt. Main Doors (D05A & D05B) (65 DOORS) 15-08-2023 20-08-2023 as per site readyness
* Laundry Room (D06A&B, ) (50 DOORS) 15-08-2023 20-08-2023 as per site readyness
* ELE. ROOV, STAIR , corridor, (D 24 D23 , D07) (40 DOORS) 15-08-2023 20-08-2023 as per site readyness

NFR Painted Doors FIRST FLOOR TO 5 TH FIFTH FLOOR (395 DOORS) Balance:-
2nd floor - door hanging and
* Bed Room & bathroom Doors D09,D06,D12,D13,,d11) 20-09-2023 25-09-2023 3rd floor
as -per
except of mock up
site readyness
SIXTH FLOOR TO 9 TH FLOOR FR DOORS GF floor- door hanging ,
Veneer door no delivery
* Apt. Main Doors (D05A & D05B) (36 DOORS) 25-08-2023 30-08-2023 as per site readyness
9th floor- non of FR
* Laundry Room (D06A&B, ) (28 DOORS) 25-08-2023 30-08-2023 as per site readyness
door fixed
* ELE. ROOV, STAIR , corridor, (D 24 D23 , D07) (38 DOORS) 26-08-2023 30-08-2023 as per site readyness

NFR Painted Doors FF Total - 245 Nos

* Bed Room & bathroom Doors D09,D06,D12,D13,,d11) 30-09-2023 05-10-2023 as per site readyness

GF & BASEMENT DOORS FR DOORS

* Apt. Main Doors (D05A & D05B) 4 DOORS 25-08-2023 30-08-2023 not fixed
as per site readyness
NFR Painted Doors FF Total - 22 Nos

* Bed Room & bathroom Doors D09,D06,D12,D13,,d11) 15-09-2023 20-09-2023 as per site readyness

LIFT LOBBY DOORS (1ST - 9TH FLOOR AND GF , BASEMENT


not fixed
LIFT LOBBY DOOR D01 - FR 15 DOORS) 05-09-2023 15-09-2023 as per site readyness
except of Mock up, no cabinet
fixed

Site is ready with vanity for-


GF, 2ND, 3RD, 4TH floor

DB unit only one number fixed


in 302
MIX 6 DILMUNIA JOINERY WORK SITE PROGRESS (FR) 8-10-2023

SI Floor Door No location Total Qty. Frames delivered Frames Installed Doors delivered Doors Installed
1 2 2 2
D05 Main Door 2 2

2 1 1 1 0
Ground Floor D23 Stair door 1 There is no door at ST
3 0 0 0 0
D01 Lift Lobby 1

4 D05 Main Door 13 13 13 13 13

5 D24 Garbage Room 2 2 2 2 2

6 D24 Electical room 2 2 2 2 2

7 First Floor D23 Stair door 2 2 2 2 2

8 D07 Corridor 2 2 2 2 2

9 D01 Lift Lobby 1 1 0 0 0

10 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 2

14 2ND FLOOR D23 Stair door 2 2 2 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 2

14 3RD FLOOR D23 Stair door 2 2 2 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 1 1 1

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 2

14 4TH FLOOR D23 Stair door 2 2 2 2 2


4TH FLOOR
15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 2

14 5TH FLOOR D23 Stair door 2 2 2 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 1

14 6TH FLOOR D23 Stair door 2 2 2 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 12 13 12

12 D24 Garbage Room 2 2 0 2 2

13 D24 Electical room 2 2 0 2 0

14 7TH FLOOR D23 Stair door 2 2 0 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 8 0 10 8

18 D05 Main Door 10 10 9 10 9

19 D24 Garbage Room 2 2 2 2 2

20 D24 Electical room 2 2 2 2 2

21 8th Floor D23 Stair door 2 2 2 2 2

22 D07 Corridor 1 1 0 1 0

23 D01 Lift Lobby 1 1 0 0 0

24 D06A laundry Room 8 7 0 8 7

25 D05 Main Door 0 0 0 0 0

26 D24 Garbage Room 2 0 0 0 0

27 D24 Electical room 2 0 0 2 0

9th Floor
28 D23 Stair door 2 0 0 1 0

29 D07 Corridor 2 0 0 0 0
9th Floor
30 D01 Lift Lobby 1 1 0 0 0

31 D19 gym 1 0 0 0 0

32 D16 Game room 1 0 0 0 0

33 D17 Launch 1 0 0 0 0

34 D7B Store room 1 0 0 0 0

35 267

Summary (Except 9th floor)


SI Door No. Total Qty Qty Delivered Qty Installed remaining qty to deliver
D05 Main Door 101
103 103 0
D07 Corridor
16 15 13 1
D24 Garbage Room
36 34 29 2
D23 Stair door
19 18 14 1
1 D06A laundry Room
2 78 78 68 0
3 D01 Lift Lobby
10 10 1 1
4
5 D25
2 0 0 2
6
7 D19 gym
1 0 0 1
D17 Launch
1 0 0 1
D16 Game room
1 0 0 1

Total 267 249 226 18


MIX 6 DILMUNIA JOINERY WORK SITE PROGRESS (NFR) 08-10-2023

SI Floor location Total Qty. Frames delivered Frames Installed Doors delivered Doors Installed
1

2
Ground Floor

4 FLAT-1 8 6 6 6 6

5 FLAT-2 7 7 7 7 7

6 FLAT-3 7 7 7 7 7

7 FLAT-4 7 7 7 7 7

8 FLAT-5 7 7 7 7 7

9 FLAT-6 7 6 5 5 5

First Floor FLAT-7 6 6 6 6 6

FLAT-8 5 5 5 5 5

FLAT-9 7 7 7 7 7

FLAT-10 3 3 3 3 3

FLAT-11 3 3 3 3 3

FLAT-12 5 5 5 5 5

10 FLAT-13 7 7 7 7 7

11 FLAT-1 8 7 7 0 0

FLAT-2 7 7 7 0 0

12 FLAT-3 7 7 7 0 0

13 FLAT-4 7 7 7 0 0

14 FLAT-5 7 7 7 0 0

FLAT-6 7 7 7 0 0

2ND FLOOR FLAT-7 3 2 2 0 0

FLAT-8 3 3 3 0 0

FLAT-9 10 10 10 0 0

FLAT-10 3 3 3 0 0

FLAT-11 3 3 3 0 0

15 FLAT-12 5 5 5 0 0
16 FLAT-13 7 7 7 0 0

11 FLAT-1 8 8 8 8 8

12 FLAT-2 7 7 7 7 7

13 FLAT-3 7 7 0 0 0

FLAT-4 7 7 0 0 0

FLAT-5 7 7 0 0 0

FLAT-6 7 7 0 0 0

3RD FLOOR FLAT-7 3 3 0 0 0

14 FLAT-8 3 3 0 0 0

FLAT-9 10 10 0 0 0

FLAT-10 3 3 0 0 0

FLAT-11 3 3 0 0 0

15 FLAT-12 5 6 0 0 0

16 FLAT-13 7 7 7 7 7

11 FLAT-1 8 6 6 6 6

12 FLAT-2 7 7 7 7 7

13 FLAT-3 7 7 7 7 7

FLAT-4 7 7 7 7 7

FLAT-5 7 7 7 7 7

FLAT-6 7 7 7 7 7

4TH FLOOR FLAT-7 3 3 3 3 3

FLAT-8 3 3 3 3 3

FLAT-9 10 10 10 10 10

FLAT-10 5 5 5 5 5

14 FLAT-11 3 3 3 3 3

15 FLAT-12 5 5 5 5 5

16 FLAT-13 6 6 6 6 6

11 FLAT-1 8 6 6 6 6

12 FLAT-2 7 7 7 7 7

FLAT-3 7 7 7 7 7

FLAT-4 7 7 7 7 7

FLAT-5 7 7 7 7 7

13 FLAT-6 7 7 7 7 7

14 5TH FLOOR FLAT-7 3 3 3 3 3


5TH FLOOR
FLAT-8 3 3 3 3 3

FLAT-9 10 10 10 10 10

FLAT-10 5 5 5 5 5

15 FLAT-11 3 3 3 2 3

FLAT-12 5 5 5 5 5

16 FLAT-13 6 6 6 6 6

11 FLAT-1 8 6 6 6 6

FLAT-2 7 7 7 5 7

FLAT-3 7 7 7 7 7

FLAT-4 7 7 7 7 7

FLAT-5 7 7 7 7 7

FLAT-6 7 7 7 7 7

6TH FLOOR FLAT-7 3 3 3 3 3

FLAT-8 3 3 3 3 3

FLAT-9 10 10 10 10 10

12 FLAT-10 5 5 5 5 5

13 FLAT-11 3 3 3 3 3

14 FLAT-12 5 5 5 5 5

15 FLAT-13 6 6 6 6 6

11 FLAT-1 8 6 6 6 6

FLAT-2 7 7 7 7 7

FLAT-3 7 7 7 7 7

FLAT-4 7 7 7 7 7

FLAT-5 7 7 7 7 7

FLAT-6 7 7 7 7 7

7TH FLOOR FLAT-7 3 3 3 3 3

FLAT-8 3 3 3 3 3

FLAT-9 10 10 10 10 10

12 FLAT-10 5 5 5 5 5

13 FLAT-11 3 3 3 3 3

14 FLAT-12 5 5 5 5 5

15 FLAT-13 6 6 0 6 0

18 FLAT-1 7 2 0 4 0

FLAT-2 7 2 0 3 0
FLAT-3 7 3 0 5 0

FLAT-4 7 1 0 3 0

FLAT-5 3 3 0 3 0
8th Floor
FLAT-6 3 1 0 3 0

FLAT-7 10 2 0 7 0

FLAT-8 5 2 0 2 0

FLAT-9 3 0 0 3 0

19 FLAT-10 6 2 0 5 0

25

26

27

28

29

30

9th Floor

31

32

33

35 603

Summary
SI Total Qty. Qty Delivered Qty Installed Remaining qty to deliver
602 395
440 162

1
2
3
4
5
6
7

You might also like