bringing an operational unit down, the non-intrusive inspection may contribute to:
Ans: B, Par 13.5 > RM w/Insp activities > Managing Inspection Costs with RBI
The API 580 user should recognize that while there is a potential for the reduction of
inspection costs through the utilization of RBI, the focus should remain on:
Ans: D, Par 13.5 > RM w/Insp activities > Managing Inspection Costs with RBI
A documented mitigation action plan should be developed for any equipment item
requiring repair or replacement and should describe all of these EXCEPT:
Ans: D, Par 13.6 > Assessing Insp results & Determining corrective actions > Action Plan
Should describe only those recommendations and repair methods employed or performed
Non-inspection risk mitigation activities fall into all of these categories EXCEPT:
Ans: D, Par 14.1 > Other Risk Mitigation Activities > General > Reduce the POF
When equipment deterioration has reached a point that the risk of failure cannot be
managed to an acceptable level, what is often the only way to mitigate the risk?
Ans:_A, Par 13.4 > RM w/Insp activities> Managing Risk with Inspection Activities ...
Regarding managing risk with inspection activities, one of the key parameters that can
affect the future risk is the Inspection Coverage. Different zones or areas of inspection of
an item or series of items can be modeled & evaluated to determine the coverage that will:
Ans:_B, Par 13.4 > RM w/Insp activities> Managing Risk with Inspection Activities ...
Regarding managing risk with inspection activities, one of the key parameters that can
affect the future risk is Inspection Tools & Techniques. The selection and usage of the
appropriate inspection tools and techniques can be optimized to:
Ans: C, Par 13.4 > RM w/Insp activities> Managing Risk with Inspection Activities ...
Inspection procedures and the actual inspection practices can impact the ability of
inspection activities to:
Ans: C, Par 13.4 > RM w/Insp activities> Managing Risk with Inspection Activities ...
Ans: D, Par 13.4 > RM w/Insp activities> Managing Risk with Inspection Activities ...
11) Depending on factors such as the remaining life of the equipment and type of damage
mechanism, risk management through inspection may have:
Ans: A, Par 13.2 > RM w/Insp activities > Id Risk Mgmt Opportunities from RBI results
Examples of cases where risk management through inspection may have little or no
effect includes all of the following EXCEPT:
A) For equip nearing end of life with well-established corrosion rates & for event-driven failures
B) Too short time frame (onset of damage to final failure) for periodic inspection to be effective
C) For instantaneous failures related to operating conditions such as high-cycle fatigue cracking
D) When Inspection technology is not sufficient to detect or quantify deterioration adequately
Ans: C, Par 13.2 > RM w/Insp activities > Id Risk Mgmt Opportunities from RBI results
NOTE: Instantaneous failures = Brittle Fracture... High cycle fatigue = an example of “B”
A) Development of a facility inspection and maintenance plan (such as that existing with PSM)
B) Development of a facility inspection and maintenance plan (such as that existing with PHA)
C) Development of an overall inspection strategy for the group of items included in assessment
D) Development of an equipment insp & non-inspection mitigation plan to reduce risk levels
Ans: C, Par 13.3 > RM w/Insp activities > Estab Insp Strategy based on Risk Assessment
A) Resultant risks that are acceptable B) Mitigated risks that are acceptable
C) Unmitigated risks that are acceptable D) None of these are correct
Ans: A, Par 13.3 > RM w/Insp activities > Estab Insp Strategy based on Risk Assessment
Regarding inspection strategy based on risk assessment, for the development of their
inspection strategy, users should consider all of the following EXCEPT:
A) Risk criteria and ranking, risk drivers, and the equipment item history
B) Equipment in similar service and the equipment remaining life
C) Number and results of the inspections performed
D) Inspection intervals and detailed methods used
Ans: D, Par 13.3 > RM w/Insp activities > Estab Insp Strategy based on Risk Assessment
The type and effectiveness of inspections would be correct for answer = “D”
16) Regarding risk management with inspection, the quality of the inspection data andthe
analysis or interpretation will greatly affect the level of:
A) Actual risk
B) Absolute risk
C) Unmitigated risk
D) Risk mitigation
Ans: D, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
Regarding risk management with inspection, because the quality of the inspection data and
the analysis or interpretation will greatly affect the level of risk mitigation, which of the
following items are critical?
Ans: A, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
In the situations where risk is being driven by POF, there is usually potential for:
Whether inspections will be effective or not will depend on any of the following except:
Ans: D, Par 13.2 > RM opportunities from RBI results > Achievable reduction in POF
Depending on factors such as the remaining life of the equipment and type of damage
mechanism, RISK MANAGEMENT THROUGH INSPECTION:
Ans: C, Par 13.2 > RM opportunities from RBI results > RM thru Insp=little or no effect
Regarding risk management, inspection serves all of these purposes EXCEPT:
Ans: D, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
Regarding risk management, inspection is invaluable input in the prediction of when the
damage will:
Ans: C, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
Ans: B, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
Regarding risk management with inspection activities, the reduction in uncertainty &
increase in predictability through inspection translate directly into a better estimate of the:
All of these damage mechanisms listed are very difficult or impossible to monitor with
inspection activities alone EXCEPT for:
A) Metallurgical deterioration that may result in instantaneous failure (such as brittle fracture)
B) Forms of localized pitting that can result in significant wall loss and loss of containment
C) Forms of stress corrosion cracking as identified in API 571
D) Forms of fatigue failure as identified in API 571
Ans: B, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
26) Risk-based inspection is a tool to provide:
Answer: D ... Ref: Section 12.3.1 > Risk D/A/M ... Risk Acceptance
A) Risk
B) Absolute Risk
C) Risk acceptance
D) Items for Risk Management
Answer: C ... Ref: Section 12.3.1 > Risk D/A/M ... Risk Acceptance
Understanding the value of each variable and how it influences the risk calculation is key
to identifying which input variables deserve closer scrutiny versus other variables which
may not have significant effects. This is more important when performing risk analyses
that are:
Answer: B ... Ref: Sect 12.4 > Risk D/A/M ... Sensitivity Analysis
What type of analysis typically involves reviewing some or all input variables to the risk
calculation to determine the overall influence on the resultant risk value?
Answer: D ... Ref: Sect 12.4 > Risk D/A/M ... Sensitivity Analysis
A) Engineering expertise
B) Expert knowledge and experience
C) Risk analyst solicitations and input
D) Total RBI Team assessment
A) Type of process fluid in equipment & state of process fluid in the equipment (solid/liquid/gas)
B) Process operating variables (temp/press) & inventory available for release in event of a leak
C) Key properties of process fluid (boiling point, density, flammability, toxicity, etc.)
D) Failure mode and resulting deterioration
Which of the following are the least developed among those currently used for RBI?
A) Estimate the release rate and the total volume of fluid that will be released from equipment
B) Determine if fluid 1s dispersed in a rapid manner (instantaneous) or slowly (continuous)
C) Determine if the fluid disperses in the atmosphere as a liquid or a gas
D) Estimate planned mitigation system impacts and estimated costs
A) All past and present inspection, process, and maintenance information is included
B) The most recent inspection, process, and maintenance information is included
C) All inspection, process, and maintenance assumptions are included
D) None of these
Ans: B, Par 15.1 > RBI Reassessments > Most recent information is vital
Ans: B, Par 15.1 > 4 items (RBI Reassessments Triggered) > Risk assess premise change
Which of these is NOT a key factor that can trigger an RBI reassessment?
Ans: C, Par 15.2 > 4 items (RBI Reassessments Triggered) > Risk assess premise change
It is important that the facility have which of the following to identify when a
reassessment is necessary?
Which statement is false regarding main function & responsibility of a Team Leader?
A) He should integrate inputs, outputs, organizational structure, & communications of his team
B) He assures a study is conducted properly & prepares an assessment report & distributes it
C) He forms the team & verifies members have necessary skills, experience and knowledge
D) He follows up to assure that an appropriate risk analysis has been performed
Ans: D, Par 16.2.2 > Team Leader > Main Function & Responsibilities > Follows up to
assure that ropriate risk mitigation actions h nimplemen
A systematic process that begins with identification of facilities or equipment and ends up
as an inspection plan is called:
A) RBI
B) Mitigation
C) Inspection planning
D) Risk-based Inspection Management
A synonym for probability recognized by API 580 but not used in the document is:
A) Likelihood
B) Possibility
C) Chance
D) Event
Answer: A ... (Introduction Section for API 580) ... ** Should know
An RBI plan provides the basis for sound management of integrity of fixed equipment
when combined with:
API 580 provides guidance to whom for development and implementation of inspection
programs?
The API 580 (RBI) approach emphasizes safe and reliable operation through:
A) Risk analysis
B) Risk assessment
C) Risk management
D) Risk-prioritized inspection
A) Loss rate in mils per year & high/med/low probability for environmental cracking (SCC)
B) Loss rate in mils per year & active/aggressive probability for environmental cracks (SCC)
C) Corrosion rate (for thinning) or Susceptibility (for DMs having unknown deterioration rates)
D) High, medium or low based on environmental conditions/construction material combinations
The deterioration rate in specific process equipment is often not known with certainty. The
ability to state the rate of deterioration precisely is affected by all of these items except:
A) Inspector’s expertise
B) Process and metallurgical variations
C) Equipment complexity and the type of damage mechanism
D) Inaccessibility for inspection, and limitations of inspection and test methods
Ans: A ... Ref: 10.4.2 > Assessing POF > Determine Deterioration, Susceptibility & Rate
Tricky question ... Limitations in the Inspector’s expertise is a factor ... Not his expertise!
An Inspector with “expertise” makes the right call! Expect to see this question on exam...
Ans: D ... Ref: 10.4.2 > Assessing POF > Determine Deterioration, Susceptibility & Rate
Which of these statements linking the damage mechanism to the failure mode is false?
A) Stress corrosion cracking can develop into small through-wall cracks or catastrophic ruptures
B) Metallurgical deterioration and mechanical damage can vary from small holes to ruptures
C) Localized corrosion and pitting can lead to large hole-sized leaks or ruptures
D) General thinning from corrosion often leads to larger leaks or rupture
Answer: C ... Ref: 10.4.3 > Assessing POF > Determine Failure Mode
Answer: B ... Ref: Para. 9.1 > DMs & Failure Modes > Introduction
Understanding failure modes is important for all of the following reasons except:
Ans: D ... Ref: Para. 9.1 > DMs & Failure Modes > Introduction ... D = correct answer
when we are discussing “Damage” Modes
Once a credible damage mechanism(s) has been identified, what else should also be
identified?
Answer: C ... Ref: Para. 9.3 > DMs & Failure Modes > Failure Modes
Answer: D ... Ref: Para. 9.3 > DMs & Failure Modes > Failure Modes
When tabulating results of a damage mechanisms and failure modes analysis for RBI,
which of the following should NOT be indicated?
Answer: C ... Ref: Para. 9.5 > DMs & Failure Modes > Tabulating Results (DMs & FMs)
When the inspection program is optimized based on an understanding of risk, all of the
following cost reduction benefits may be realized except:
A) Noninvasive insp methods may be substituted for invasive methods requiring equip shutdown
B) More effective infrequent inspection may be substituted for less effective frequent inspection
C) Ineffective, unnecessary or inappropriate inspection activities may be eliminated
D) Inspection of high-risk items may be eliminated or reduced
Answer: D ... Ref: Para 7.2.5 > Planning the RBI Assessment ... Reduce Costs
The data within the RBI assessment can be useful in determining the optimum
economic strategy to:
Answer: B ... Ref: Par 7.2.7 > Plan RBI Assess.> Identify Mitigation Alternatives
End of life strategies focus the inspection efforts directly on high-risk areas and:
A) Where the inspections will provide a reduction of risk during the remaining life of the plant
B) Efforts that do not impact risk during the remaining life are always eliminated or reduced
C) Efforts that do not impact risk during the remaining life are always eliminated
D) Efforts that do not impact risk during the remaining life are always reduced.
Answer: A ... Ref: Para. 7.2.9 > Plan RBI Assess.> Facilities End of Life Strategies
During initial screening, the screening done at the facility level may be done by a:
Answer: C ... Ref: Para. 7.3.3 > Plan RBI Assess.> Facilities Screening
If the scope of the RBI assessment is a multi-unit facility, the first step in the
application of RBI is screening of entire process units to:
Answer: B ... Ref: Para. 7.3.4 > Plan RBI Assess.> Process Units Screening
61) An effective PSM program includes a well-structured and effective:
Ans: A ... Mgmt of Risks (Relationship between RBI & Other Safety Initiatives) > 6.7.3
Which of these statements is true regarding the relationship between RBI and
Equipment Reliability (ER)?
A) ER programs can provide input to the probability analysis portion of an RBI program
B) Reliability records can be used to develop equipment failure probabilities & leak frequencies
C) RCM cannot supplement RBI nor achieve an integrated program to reduce Op Unit downtime
D) At facilities without effective RBI, RCM programs can focus on equipment reliability aspects
outside of loss of containment
Ans: A ... Mgmt of Risks (Relationship between RBI & Other Safety Initiatives) > 6.7.4
A) POF/COF
B) An effective RBI Program
C) Failure probabilities & leak frequencies
D) None of these are correct
Ans: C ... Mgmt of Risks (Relationship between RBI & Other Safety Initiatives) > 6.7.4
In jurisdictions allowing API code/Std use, RBI should be an acceptable method for:
Ans: C ... Mgmt of Risks (Relationship with Jurisdictional Requirements) > Section 6.8
Before using RBI for inspection planning purposes, all users should review what
requirements in a given jurisdiction?
Ans: A ... Mgmt of Risks (Relationship with Jurisdictional Requirements) > Section 6.8
Evaluation of the results of the inspection and examination activities and conducting an
assessment of fitness for continued service are key parts of what process?
A) Mitigation
B) Risk Analysis
C) Engineering Analysis
D) RBI
Ans: D ... Management of Risks (Evaluation & FFS Analysis per API 579-1) ... Sect 6.6.3
Ans: B ... Management of Risks (Evaluation & FFS Analysis per API 579-1) ... Sect 6.6.3
Ans: A ... Management of Risks (Evaluation & FFS Analysis per API 579-1) ... Sect 6.6.3
Ans: C ... Management of Risks (Evaluation & FFS Analysis per API 579-1) ... Sect 6.6.3
Examples where inspection may not be sufficient to manage risks to acceptable levels
include all of these EXCEPT:
A) Equipment highly susceptible to failure mechanisms such as brittle fracture and fatigue
B) Probability-dominated or residual risks
C) Equipment nearing retirement
D) Consequence-dominated risks
Answer: B ... Management of Risks (Other Risk Management) ... Sect 6.6.4
To manage risk, the objective of RBI is to direct management’s decision process for:
prioritizing:
Answer: C ... Management of Risks (Risk Management thru Inspection) ... Section 6.6.1
A) Predictability of COF
B) Predictability of POF
C) Unpredictability of POF
D) Unpredictability of COF
Answer: B ... Management of Risks (Risk Management thru Inspection) ... Section 6.6.1
Risk management activity (providing new information) that may lead to risk
reduction:
A) Inspection
B) Analysis
C) Mitigation
D) None of these
Answer: A ... Management of Risks (Risk Management thru Inspection) ... Section 6.6.1
Impending failure of pressure equipment is not avoided by inspection activities unless the
inspection precipitates risk mitigation activities that change the:
A) COF
B) POF
C) Design premise
D) None of these
Answer: B ... Management of Risks (Risk Management thru Inspection) ... Section 6.6.1
The inspection plan should detail (what) related to the current operation?
A) POF
B) Mitigated risk
C) Unmitigated risk
D) None of these
Ans: C ... Management of Risks (Use RBI to establish Insp plans/prioroties) ... Sect 6.6.2
76) Which statements is TRUE regarding Accuracy versus Precision in risk analysis?
Answer: D ... Introduction to RBI ... Sect 6.4 ... Precision versus Accuracy
Consequence of 1
failure :
Data and i Inspection Mitigation
information H plan (if any)
collection i
Probability of i
failure i |
The dotted line (Square) surrounding COF & POF (API580 Figure 4 above) indicates:
Ans: B ... Types of RBI Assessment ... Sect 6.3.4 ... Know Continuum of RBI approaches
Which statement is correct regarding AP1580 Figure 4 block diagram shown above?
A) Fig. 4 (RBI Planning process) shows all essential elements of planning based on risk analysis
B) Fig. 4 (RBI Planning process) is missing | essential planning element based on risk analysis
C) Fig. 4 (RBI Planning process) shows all essential elements of planning based on risk mgmt.
D) Fig. 4 (RBI Planning process) is missing | essential planning element based on risk mgmt.
Ans: B ... Types of RBI Assessment ... Sect 6.3.4 ... Know Continuum of RBI approaches
Which element (if any) is missing from APL580 Figure 4 block diagram shown above?
Ans: C ... Types of RBI Assessment ... Sect 6.3.4 ... Know Continuum of RBI approaches
Regarding RBI planning process using the continuum of approaches, which of these
statements is FALSE?
A) Risk Assessment Process includes both Consequence of Failure & Probability of Failure
B) Risk Assessment Process results in a risk ranking that is then applied to Inspection Planning
C) After Inspection Plans, any Mitigation results in Reassessment & more Data & Info collection
D) Data and Info Collection is performed only after initial Risk Assessment Process (COF/ POF)
Ans: D ... Types of RBI Assessment ... Sect 6.3.4 ... Know Continuum of RBI approaches
QRA logic models are analyzed to estimate the probability of:
Answer: A ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
A) Risk Probability
B) Risk Numbers
C) Risk cost
D) None of these
Answer: B ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
Answer: A ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
A QRA shares many of the same techniques and data requirements as a(n):
Answer: D ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
Answer: C ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
The accuracy of results from a qualitative analysis is dependent on:
A) The background and expertise of the risk analysts and team members
B) The background and expertise of the Engineers and Inspectors
C) The expert opinion of the risk analysts and team members
D) None of these are correct
Answer: A ... Types of RBI Assessment ... Sect 6.3.1 ... Know Qualitative RBI approach
Although the qualitative approach is less precise than more quantitative approaches it is
effective in screening out units and equipment with:
A) High risk
B) Low risk
C) Medium risk
D) Any risk level
Answer: B ... Types of RBI Assessment ... Sect 6.3.1 ... Know Qualitative RBI approach
Answer: A ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
Answer: B ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
Answer: A ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
Who is responsible for verifying that equipment repairs/replacements/additions have
been included in the equipment condition data supplied by the equipment inspector?
Ans: A, Par 16.2.6 > Ops & Maint Personnel > Responsibilities >They verify data from
Inspection regarding equipment repair/replacement/mods is correct > No unauthorized or
undocumented work > BAD MAINT GROUPS REPAIR EQUIP with NO records or data
Who is responsible for assembling all of the data and carrying out the RBI analysis?
Ans:_D, Par 16.2.8 > Risk Analyst > Responsibilities >None of these ... Risk Analyst
Ans: D, Sect 17.1 General Knowledge > Should be documented > No SHALLs in 580
Ans: C, Section 17.1 General Knowledge > Including info on POF & COF
A) Basis for both the probability and consequences of failure should be documented
B) Any specific software program used to perform the assessment should be documented
C) Methodology for RBI analysis should be documented to show the type of assessment done
D) Documentation should be adequate so that the basis & logic for the decision making process
does not have to be replicated at a later time.
Answer: B ... Evolution of Insp. Intervals/Due Dates > Section 5.3 > Must Know!!!
Answer: B ... Overview of Risk Analysis > Section 5.4 > B is the first of 8 logical !
Answer: C ... Overview of Risk Analysis > Section 5.4 > Only C is the most correct!
Answer: B ... Overview of Risk Analysis > Section 5.4 > must know this one!
100) There is a continuous spectrum of methods available to assess risk ranging from a
strictly relative ranking to:
A) Rigorous calculation
B) Engineering Judgment
C) Engineering & Inspector Judgment
D) None of these are correct
Answer: A ... Overview of Risk Analysis > Section 5.4 > must know this one!
101) Limitation of any negative consequence or reduction in probability of a particular
event is called:
A) Mitigation
B) Risk reduction
C) Probability
D) Likelihood
102) Degrees of belief about probability expressed as classes or ranks in the correct API 580
listed ascending order is:
A) Incredible ... remote ... probable ... improbable ... occasional ... frequent
B) Incredible ... remote ... improbable ... probable ... occasional ... frequent
C) Rare ... Unlikely ... Moderate ... Likely ... Almost certain
D) Rare ... Moderate ... Unlikely ... Almost certain ... Likely
Answer: C ... Definitions > Par 4.1.28 > Examples (degree of belief related to probability)
103) Risk is the combination of the probability of some event occurring during a time
period of interest and the:
A) Consequences associated with the event B) Likelihood of a failure
C) Probability of a failure D) Consequence of failure
Answer: A ... (Basic Risk Assessment Concepts ... What is Risk? ... Section 5.1)
Answer: B ... (Basic Risk Assessment Concepts ... What is Risk? ... Section 5.1)
A) They should first determine the consequence of failure then the probability of failure
B) They should first determine the probability of failure then the consequence of failure
C) They should be a rational, logical, structured process that contains at least two steps
D) They should first determine if the risk is acceptable and then how big the risk is
Answer: C ... (Basic Risk Assessment Concepts ... What is Risk?) ... Did you answerA or B?
Discussion: The Cheese” is a trick tactic used by API to list 2 opposing answers in the first two
possible answers A & B ... Many ass/u/me_1 statement MUST be true ... See Section 5.1
106) Which statement is false regarding an “event”?
Answer: D ... Definitions, Section 4.1.14 & 4.1.16 > Must know all the types of events
107) An analytical tool that organizes and characterizes potential occurrences in a logical
and graphical manner is called:
Answer: B ... Definitions, Sect 4.1.15 > Event tree ... Must know event types
Answer: C ... Definitions, Section 4.1.15 > Must know! > Potential occurrences!
A) An event resulting from forces of nature, acts of God, sabotage, terrorism, & power failures
B) An event resulting from intrusions of external transportation vehicles (ships, trains, trucks)
C) An event resulting from neighboring fires, explosions, or even hazardous material releases
D) An event that can usually be controlled by persons employed at the facility
Answer: D ... Definitions, Section 4.1.15 > Must know! > Cannot be controlled!
A) Source
B) Hazard
C) Risk
D) None of these
Answer: A ... Def. > Par 4.1.51 > Source in a Safety Context is a “HAZARD” > 4.1.21
111) API 580 is intended to provide guidance on developing an RBI program for:
A) Fixed equipment and piping in the hydrocarbon and chemical process industries
B) All types of equipment and piping in the Oil and Gas Industry
C) Fixed equipment and piping in the Oil and Gas Industry
D) All types of equipment and piping in all industries
Answer: A ... (Forward Section ... API 580 RBI intentions) *** MUST KNOW
Answer: D ... (Forward Section ... API 580 Forward Statements) *** MUST KNOW
114) An RBI assessment allows API 510/570/653 code users to plan inspection strategies and:
Answer: B ... (Forward Section ... API 580 Forward Statements) ... *** MUST KNOW
Answer: D ... (Introduction Section for API 580) > POF = Probability, not possibility
116) The amount of deterioration that a component can withstand without failing is called:
A) Damage tolerance
B) Damage mode
C) Failure mode
D) Degradation
Answer: A ... Definitions > Para 4.1.10 > See also 4.1.8 & 4.1.12 (Tricky)
117) Which of the following statements are FALSE regarding the definition of consequence?
A) Consequences may range from positive to negative and are always negative for safety aspects
B) A consequence is defined by API 580 as “an outcome from an event”
C) Consequences may only be expressed qualitatively or quantitatively
D) There can be only one consequence from a single event
118) Which of these statements are not true regarding a Quantitative Risk Analysis?
A) It identifies the combinations of events (IF they were to occur) that can lead to a severe event
B) It quantifies the probabilities and consequences of the probable damage mechanisms
C) It estimates the probability of occurrence for each combination of events
D) It precisely quantifies the consequences of each event
Answer: D ... Definition > Par 4.1.31 > ORA ESTIMATES the consequences
119) Termination of the ability of a system, structure, equipment or component to perform its
required function of containment of fluid (i.e. loss of containment) is called:
A) Deterioration
B) Degradation
C) Failure
D) Damage
Ans: es -- Definition Par 4.1.18 > — the difference between deterioration & failure!
Answer: A ... Definitions > Par 4.1.18 > Two types of failures (announced/unannounced)
121) Risk management typically includes all of the following except:
A) Risk assessment
B) Risk mitigation
C) Risk acceptance
D) Risk reduction
Answer: D ... Definitions, etc > Para 4.1.47 > Risk communication = 4" item
A) Risk mitigation
B) Risk reduction
C) Risk avoidance
D) Risk management
Answer: A.. - Definitions, etc > Par 4, 1.48 >Risk Mitigation = actual measure taken to
123) An analysis that uses broad categorizations for probabilities & consequences of failure:
A) Risk analysis
B) Qualitative risk analysis
C) Quantitative risk analysis
D) Semi-Quantitative risk analysis
Answer: B ... Definitions > Par 4.1.30 > Definition of Qualitative Risk Analvsis
124) An analysis that quantifies the probabilities and consequences of the probable damage
mechanisms is called:
A) Risk analysis
B) Qualitative risk analysis
C) Quantitative risk analysis
D) Semi-Quantitative risk analysis
Answer: C ... Definitions > Par 4.1.31 > Definition of Quantitative Risk Analysis
125) An analysis that includes aspects of both qualitative and quantitative analyses is called:
Answer: D ... Definitions > Par 4.1.50 > Definition of Semi-Quantitative Risk Anal
126) Terms of reference by which the significance of risk is assessed is called:
A) Risk Driver
B) Risk Identification
C) Risk Communication
D) Risk Criteria
127) The comparative risk of a facility, process unit, system, equipment item or component to
other facilities, process units, systems, equipment items, or components, respectively is:
A) Absolute risk
B) Acceptable risk
C) Relative risk
D) Residual Risk
A) Absolute risk
B) Acceptable risk
C) Relative risk
D) Residual Risk
129) Systematic use of information to identify sources and to estimate the risk is called:
A) Risk Mitigation
B) Risk Estimation
C) Risk Assessment
D) Risk Analysis
130) Which of these provides a basis for risk evaluation, risk mitigation & risk acceptance?
A) Risk Communication
B) Risk Analysis
C) Risk Assessment
D) Risk Estimation
Answer: A ... Definitions > Par 4.1.18 > Two types of failures (announced/unannounced)
Answer: B ... Definitions > Par 4.1.18 > Two types of failures (announced/unannounced)
A) Slow leak under insulation not detected (until someone notices a drip or wisp of vapor)
B) Slow leak under insulation not detected (until a pool of fluid forms on the ground)
C) Small leak in a heat exchanger tube or a small leak in a buried piping system
D) Slow leak under insulation in an H2S line detected by a plant alarm
Answer: D ... Definitions > Par 4.1.18 > Two types of failures (announced/unannounced)
A) Initiated actions
B) Consequences
C) Circumstances
D) Scenarios
Answer: C ... Definitions, Section 4.1.14 > Must know all the types of events
135) An analytical tool that organizes and characterizes potential occurrences in a logical
and graphical manner is called:
A) Event tree
B) External Event
C) Event Analysis
D) Event Risk Analysis
Answer: A ... Definitions, Sect 4.1.15 > Event tree ... Must know event types
136) The combination of the probability of an event and its consequence is called:
A) Absolute risk
B) Estimated risk
C) Relative risk
D) Risk
A) Absolute risk
B) Acceptable risk
C) Relative risk
D) Residual Risk
138) Systematic use of information to identify sources and to estimate the risk is called:
A) Risk Mitigation
B) Risk Estimation
C) Risk Assessment
D) Risk Analysis
139) The overall process of risk analysis and risk evaluation is called:
A) Risk-based Inspection
B) Risk Estimation
C) Risk Assessment
D) Risk Management
140) A risk assessment and management process that is focused on loss of containment of
pressurized equipment in processing facilities, due to material deterioration is called:.
A) Risk-based Management
B) Risk-based Inspection
C) Risk Analysis
D) Risk Estimation
A) Understanding/addressing damage modes & focus on process unit integrity operating window
B) Understanding/addressing failure modes & focus on process unit design/operating conditions
C) Process unit design & operating conditions including integrity operating windows
D) Safety in operations and potential hazards that can affect the facility
Answer: B ... (Ref: Sect 2.3 First Paragraph > Mechanical Integrity Focused)
A) Insp & Engineering personnel responsible for equipment mechanical integrity & operability
B) Insp & Engineering & Materials Specialist personnel responsible for equipment design
C) Inspection/engineering personnel responsible for mechanical maintenance
D) None of these, because the audience is the total operating organization
Answer: A ... (Ref: Sect 2.3 First Paragraph > Mechanical Integrity Focused)
Answer: D ... (Ref: Sect 2.3 First Paragraph > Mechanical Integrity Focused)
144) The RBI process is focused on maintaining the mechanical integrity of pressure
equipment items and:
Answer: C ... (Ref: Sect 2.3 First Para > Mechanical Integrity Focused) ...***Must know
Answer: D ... (Ref: Sect 2.3 First Para > Mech Integrity Focused) ... ** Should Know
146) RBI is based on sound and proven:
Answer: D ... (Ref: Purpose Section 1.2, Last Paragraph > RBI Benefits & Limitations)
Answer: B ... (Ref: Purpose Section 1.2, Third Sentence > RBI Benefits & Limitations)
148) Implementation of RBI plans provide what benefit for facilities & equipment assessed?
Answer: C ... (Ref: Purpose Section 1.2, Second Sentence > RBI Benefits)
149) In some cases, in addition to risk reductions and process safety improvements, RBI
plans may result in:
A) Cost reductions
B) Elimination of all inspections
C) Elimination of all RBI analysis
D) Elimination of all inspections & RBI analysis
Answer: A ... (Ref: Purpose Section 1.2, Third Paragraph > RBI Benefits)
150) Using RBI provides a vehicle for continuously improving inspection of facilities and:
A) Systematically managing the risk associated with plant operations and hazards
B) Systematically reducing the risk associated with plant operations and hazards
C) Systematically reducing the risk associated with pressure boundary failures
D) Systematically managing risk associated with pressure boundary failures
Answer: C ... (Ref: Sect 1.3, First Paragraph > RBI as a Continuous Improvement Tool)
151) Who is responsible for the formation of the team and verifying that the team members
have the necessary skills, experience and knowledge?
Ans: D, Par 16.2.2 > Team Leader > Main Function & Responsibilities
152) Which statement is false regarding the usual responsibilities of Equipment Inspector or
Inspection Specialist?
A) He alone implements the recommended inspection plan derived from the RBI assessment
B) He assesses effectiveness of past inspections with aid from Materials & Corrosion Specialist
C) He alone is responsible to gather data on the condition and history of equipment in the Study
D) He alone provides predictions of current equipment condition if condition data is unavailable
Ans: D, Par 16.2.3 > Equip Inspector/Insp Specialist > Responsibilities> He + Corr SP
153) Who is generally responsible for gathering data on the condition and history of
equipment in the study?
Ans:_A, Par 16.2.3 > Equip Inspector/Insp Specialist > Responsibilities> He + Corr SP
154) Who is usually responsible for implementing the recommended inspection plan
derived from the RBI assessment?
Ans:_A, Par 16.2.3 > Equip Inspector/Insp Specialist > Responsibilities> He + Corr SP
155) Which statement is false regarding the usual responsibilities of Operations &
Maintenance Personnel?
A) They verify facility/equipment is being operated within process operating window parameters
B) They provide data on process deviations & past unit run operating trends (incl. data on IOWs)
C) They implement recommendations pertaining to process or equip modifications & monitoring
D) They provide general data regarding all of the equipment repairs/replacements/modifications
Ans: D, Par 16.2.6 > Ops & Maint Personnel > Responsibilities >They verify data from
Inspection regarding equipment repair/replacement/mods is correct > No unauthorized or
undocumented work > BAD MAINT GROUPS REPAIR EQUIP with NO records or data
156) Which of these may be performed to determine if the equipment may continue to be
safely operated when serious flaws are identified in the equipment?
Ans:_B, Par 14.3 > Evaluating Flaws for Fitness-For-Service > API 579-1/ASME FFS-1
157) Examples where Modification and redesign of equipment, utilizing a rigorous MOC
process, can provide mitigation of POF include all of these except:
A) Change metallurgy, add protective linings and coatings, or increased corrosion allowance
B) Removal of Deadlegs, perform physical changes to help to control/minimize deterioration
C) Injection point design changes and resizing of the relief device
D) Insulation system elimination
Ans:_D, Par 14.4 > Equip Modification, Redesign & Rerating >Insulation improvements
158) Which of these is usually required to provide significant risk reduction regarding
isolation valves?
Ans: C, Par 14.5 > Emergency Isolation > Location & Operation of isolation valves
159) Key process parameters for I[OWs should be identified and implemented, upper and
lower limits established, as needed, and deviations from these limits should be:
Ans: B, Par 14.8 > Emergency Isolation >Location & Operation of isolation valves
160) This other mitigation method can reduce fire damage and minimize or prevent
escalation and greatly reduce the probability that a vessel exposed to fire will BLEVE:
A) Water Curtain
B) Water Spray/Deluge System
C) Blast-resistant Fireproofing Construction
D) None of these
Ans: B, Par 14.10 > Emergency Isolation >WATER SPRAY/DELUGE SYSTEM
161) Invasive inspections, in some cases, may cause deterioration and increase the risk of the
item. Examples where this may happen include all of the following EXCEPT:
A) Moisture ingress to equip leading to stress corrosion cracking or polythionic acid cracking
B) Internal inspection of fragile (easily broken/cracked) glass lined pressure vessels
C) Increased risks associated with operating equipment at elevated temps
D) Removal of passivating (protecting) films during cleaning
Ans: C, Par 13.4 > RM w/Insp activities> Managing Risk with Inspection Activities ...
Increased risks associated with shuttin nan rtin ipmen
162) The five key parameters (Insp frequency, coverage, tools & techniques, procedures&
practices, Internal/On-Stream/Ext) can be adjusted by the API 580 user to obtain the
OPTIMUM _INSPECTION PLAN that:
Ans: A, Par 13.4 > RM w/Insp activities> Managing Risk with Inspection Activities ...
Increased risks associated with shuttin ran rtin ipmen
163) Regarding managing risk with inspection, Inspection costs can be more effectively
managed through the utilization of:
A) RBI B) Well-trained/qualified/experienced inspectors
B) Proper inspection tools & techniques D) Effective inspection procedures
Ans: A, Par 13.5 > RM w/Insp activities > Managing Inspection Costs with RBI
164) Regarding managing risk with inspection, which of the following inspection actions
does not result in increased inspection cost effectiveness?
A) Insp resources can be reduced in areas where Insp has little or no effect on associated risks
B) Resources can be applied or shifted to those areas targeted based on the strategy selected
C) Resources can be applied or shifted to those areas identified as having risks
D) Inspection resources can be applied wherever they are most needed
Ans: C, Par 13.5 > Managing Insp Costs with RBI > Identified as having HIGHER risk
165) An opportunity for managing inspection costs is by identifying items in the inspection
plan that can be inspected:
A) During Turnarounds
B) During planned Unit Shut Downs
C) During unplanned Unit Shut Downs
D) Non-intrusively on-stream
Ans: D, Par 13.5 > RM w/Insp activities > Managing Inspection Costs with RBI
166) The level of risk reduction achieved by inspection will depend on all of these
EXCEPT:
A) Speed of deterioration
B) Damage mechanism mode of failure
C) Detection capability of the inspector
D) Scope and frequency of inspection
Ans: C, Par 13.3 > RM w/Insp activities > Estab Insp Strategy based on Risk Assessment
167) Organizations should be cautious not to assume that there is an unending capacity for risk
management through inspection, and should act (how) in assigning the level of risk
management achieved through inspection?
Ans: B, Par 13.3 > RM w/Insp activities > Estab Insp Strategy based on Risk Assessment
168) To assure that inspection activities are continually focused on items with higher risk, the
inspection strategy (regarding Risk Assessment) should be what type of process?
Ans: B, Par 13.3 > RM w/Insp activities > Estab Insp Strategy based on Risk...Iterative
means repetitive ... The correct answer could also be ... A documented & iterative process
169) Regarding managing risk with inspection activities, RBI can be used as a “what if” tool
to guide inspection as related to risk determination for all of the following EXCEPT:
Ans: D, Par 13.4 > RM w/Insp activities> Managing Risk with Inspection Activities
170) Regarding managing risk with inspection activities, key parameters that can affect the
future risk include all of the following EXCEPT:
Ans: B, Par 13.4 > RM w/Insp activities> Managing Risk with Inspection Activities ...
Correct = Insp
coverage
uses strategy such as “candidate” system for more extensive Insp
171) Which statement is false regarding RBI Personnel & documentation/recordkeeping?
172) Regarding RBI Assessment documentation & recordkeeping, which statement below is
TRUE regarding the TIME FRAME?
A) The level of risk is usually a function of time, so the time frame over which the RBI analysis
is applicable should be defined and captured in the final documentation
B) The level of risk is a function of time as a result of the time dependence of a failure mode
C) The level of risk is a function of time as a result of potential for operation error in equipment
D) None of these are correct
Ans: C, Sect 12 Fig. 5 Example & Note! ... Pr lity of all con nce M 11.0!!!
Solution = 0.000001 (Probability of fire) + value “x” = (Probability of no fire)
1.0 minus 0.000001 equals 0.999999> 6 numbers to left of “decimal” ... So “C” is correct
Probability of Fire = (Probability of Failure) = (Probability of Ignition)
Probability of Fire = 0.001 per year ~ 0.01 = 0.00001 or 1 « 107° per year
The probability of no fire encompasses two scenarios (loss of containment without ignition and no loss of
containment). The probability of no fire would be:
Probability of No Fire = (0.001 per year = 0.99) + 0.999 per year — 0.99999 per year
NOTE The probability of all consequence scenarios should equal 1.0. In the example, the probability of the specific
consequence of a fire (1 = 10°° per year) plus the probability of no fire (0.999999 per year) equals 1.0.
If the consequence of a fire had been assessed at $1 ~ 107 then the resulting risk would be:
Exam Tips:
Control “F” your 580 ... RBI is ... RBI can ... “Example” ...
Important = Key = Vital = Essential ...
So many good test Qs included these words
MUST KNOW
Know all figures & tables & practice the calcs using the calculator ...
Section 12.2 Example
174) Examples where risk management through inspection will have the EFFECT in the
question above include all of these EXCEPT:
Ans:_D, Par 13.2 > RM opportunities from RBI results > Event-based can’t be predicted
175) In addition to a risk priority list that is developed as a result of the RBI process, RBI will
also identify whether the consequence or POF or both is:
A) Driving risk
B) Increasing risk
C) Decreasing risk
D) Either increasing or decreasing risk
Ans: A, Par 13.2 > RM w/Insp activities > Id Risk Mgmt Opportunities from RBI results
176) Regarding risk management, once an RBI assessment has been completed, the items
with higher or unacceptable risk should be:
A) Analyzed for potential risk management risk management strategies other than inspection
B) Assessed for potential risk management thru Inspection or other risk management strategies
C) Analyzed for potential risk management thru Inspection and other risk management strategies
D) Assessed for potential risk management thru Inspection alone
Ans: B, Par 13.2 > RM w/Insp activities > Id Risk Mgmt Opportunities from RBI results
177) Regarding risk management with Inspection, whether inspections will be effective or not
will depend on all of the following EXCEPT:
A) Equipment type and the active and credible damage mechanisms affecting the equipment
B) The rate of deterioration or susceptibility, inspection methods, coverage and frequency
C) Accessibility to expected damage areas, and the shutdown requirements
D) Amount of achievable reduction in the COF
Ans: D, Par 13.2 > RM w/Insp activities > Id Risk Mgmt Opportunities from RBI results
178) Regarding risk management with Inspection, which of these statements is true
concerning a reduction in POF of a low POF item?
A) A reduction in POF of a low POF item is not achievable through inspection
B) A reduction in POF of a low POF item is usually easily achievable through inspection
C) A reduction in POF of a low POF item is usually difficult to achieve through inspection
D) A reduction in POF of a low POF item is extremely difficult to achieve through inspection
Ans: C, Par 13.2 > RM w/Insp activities > Id Risk Mgmt Opportunities from RBI results
179) Regarding risk management with inspection activities, damage mechanisms caused by
these types of operating changes can happen too fast to be monitored with the normal risk-
based/condition-based/or time-based inspection plans?
Ans: D, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
180) Regarding risk management with inspection activities, damage mechanisms caused by
short-term, event-driven operating changes can happen too fast to be monitored with:
Ans: A, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
181) Which of these does not properly manage risk caused by short-term, event-driven
operating changes that happen too fast to be monitored with inspection plans?
A) Establishing and implementing a comprehensive program for [OWs
B) Establish adequate communications to inspection personnel when process deviations occur
C) Establish and implement a rigorous MOC program for changes from established parameters
D) Establish and implement operating windows & procedures where deviations are not allowed
Ans: D, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
182) Risk mitigation (by the reduction in uncertainty) achieved through inspection
presumes that the organization will:
183) Regarding risk management with inspection, if inspection data that are gathered are not
properly analyzed and acted upon where needed, what will likely be the result?
A) Loss of containment
B) Significant increase in the absolute risk
C) Risk mitigation will not be achieved
D) Possible loss of containment & risk mitigation will not be achieved
Ans: C, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
184) One goal of risk analysis is to communicate results in a common format that a variety of
people can understand. Which of the following is helpful in accomplishing this goal?
A) Using a risk matrix B) Using a risk matrix or plot
C) Using a risk matrix or plot or schedule _D) Using a risk matrix, plot, graph or schedule
Ans: B ... Ref: Sect 12.6.1 > Risk D/A/M ... Risk Presentation (general)
185) Which of these items (See Risk Plot below) are indicative of unacceptable risk?
ISO-risk line
Probability of failure —_———>
Consequence of failure
Ans: D ... Ref: Sect 12.6.3 > Risk D/A/M ... Risk Presentation (Risk Plots) > Items 1, 2,3
186) After risk analysis has been performed, and risk values plotted, what process begins?
A) Risk evaluation process begins B) Risk management process begins
C) Risk assessment process begins D) Risk estimation process begins
Ans: A ... Ref: Sect 12.7 > Risk D/A/M ... Establishing Acceptable Risk Thresholds
187) Regarding risk management, inspection alone does not arrest or mitigate damage
mechanisms or reduce risk, but the information gained though effective inspection can:
A) Better quantify the actual risk B) Precisely identify the actual risk
C) Better quantify the absolute risk D) Precisely identify the absolute risk
Ans: A, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
188) Regarding risk management, impending failure of pressure equipment is not avoided by
inspection activities unless the inspection causes what to happen (or results in)?
Ans: B, Par 13.1 > RM w/Insp activities > Manage risk by reducing uncertainty thru Insp
189) Risk should be determined by combining the POF and the COF and the general form of
the risk equation should be:
190) Once probabilities of failure and failure mode(s) have been determined for the
relevant damage mechanisms, what should be the next item to be determined?
A) The consequence of each failure mode
B) The consequence of each potential failure
C) The probability of each credible consequence scenario
D) None of these are correct
Ans: C ... Ref: Section 12.2.1 > Risk D/A/M ...Probability of a Specific Consequence
Ans: B.... Ref: Section 12.2.1 > Risk D/A/M ... Probability of a Specific Consequence
192) For a specific damage mechanism, what should be taken into account when
considering the probability of incidents in the aftermath of an equipment failure?
Ans: A... Ref: Section 12.2.1 > Risk D/A/M ... Probability of a Specific Consequence
193) When calculating risk for each specific consequence, risk equations can be stated as:
A) Risk of specific consequence = Probability of specific consequence ~ specific consequence
B) Risk of specific consequence = Probability of specific consequence + specific consequence
C) Risk of specific consequence = Probability of specific consequence — specific consequence
D) Risk of specific consequence = Probability of specific consequence x specific consequence
Ans: D ... Ref: Section 12.2.2 > Risk D/A/M ... Calculate Risk (Specific Consequence)
194) The consequence analysis in an RBI program is performed to provide discrimination
between equipment items on the basis of the:
Answer: A ... Ref: Section 11.1 > Assessing COF > Introduction to Consequence Analysis
195) COF analysis should be performed to estimate the consequences that occur due to:
Answer: B ... Ref: Section 11.1 > Assessing COF > Introduction to Consequence Analysis
A) All credible estimates of details regarding DMs that can affect equipment
B) All credible failure modes to which the equipment item is susceptible
C) All realistic and significant DMs and failure modes
D) None of the above is correct
Answer: B ... Ref: Section 11.1 > Assessing COF > Introduction to Consequence Analysis
197) The consequence effects for loss of containment can be generally considered to be inall the
following categories except:
198) Although RBI is mainly concerned with loss of containment failures, other functional
failures could be included in an RBI study if a USER DESIRED. OTHER FUNCTIONAL
FAILURES COULD INCLUDE ALL OF THESE EXCEPT:
A) Functional or mechanical failure of pressure containing equipment (columns, tray towers, etc)
B) Rotating equipment failure such as seal leaks and impeller failures
C) Pressure-relief device failure
D) Heat exchanger tube failure
Answer: D ... Ref: Para. 10.1 > Assessing POF > Introduction to Probability Analysis
200) The POF analysis should have all of the following characteristics except:
A) It should be measurable
B) It should be repeatable
C) It should be credible
D) It should be documented
Ans: A... Ref: Para. 10.1 > Assessing POF > Siouldibelrepeatable/credible/documented
201) Regarding POF analysis, frequency is expressed as a:
A) Number of events
B) Fraction or Percentage
C) Number of events occurring during a specific time frame
D) None of these are correct
202) What is the basis for a Qualitative POF assessment using knowledge of the operating
history, future inspection and maintenance plans and possible materials deterioration?
A) Expert opinion
B) Inspector judgment
C) Engineering judgment
D) None of these
A) Loss rate in mils per year & high/med/low probability for environmental cracking (SCC)
B) Loss rate in mils per year & active/aggressive probability for environmental cracks (SCC)
C) Corrosion rate (for thinning) or Susceptibility (for DMs having unknown deterioration rates)
D) High, medium or low based on environmental conditions/construction material combinations
204) The precision of the data collected should be consistent with the:
Answer: C ... Ref: Para. 8.1 > Data & Information Collection > General
205) Generally, a qualitative analysis uses broad ranges that require which of the following
from the user when compared to a more quantitative approach?
Answer: A ... Ref: Para. 8.2.1 > Data & Info Collection > Qualitative RBI Data Needs
Answer: D ... Ref: Para. 8.2.2 > Data & Info Collection > Quantitative RBI Data Needs
207) In any inspection program, data validation is essential and the reasons for inspection data
quality errors include all of the following except:
Answer: A ... Ref: Para. 8.3 > Data & Info Collection > Data Quality
208) Information for RBI can be found in many places within a facility. It is important to
stress that the precision of the data should match:
Ans: A ... Ref: Para. 8.5 > Data & Info Collection > Sources of Site-Specific Data/Info
209) The spectrum of complementary risk analysis approaches can be considered as part of:
210) An expected outcome from application of RBI process should be linkage of risks with:
A) Appropriate inspection, process control or other risk mitigation activities to manage the risks
B) Process controls or other risk mitigation activities to effectively reduce or eliminate the risks
C) Appropriate inspection, process control or other risk mitigation activities to control the risks
D) Process controls or other risk mitigation activities to effectively reduce or control the risks
Answer: A ... Ref: Purpose Sect. 1.1, 2"! Para > EXPECTED OUTCOME FROM RBI
A) A detailed description of the inspection plan to be employed for each equipment item
B) A description of other risk mitigation activities (non-inspection items such as repairs)
C) A ranking by relative risk of all equipment evaluated and identification of risk drivers
D) Expected risk levels of all equipment before the inspection plan has been implemented
Answer: D ... Ref: Purpose Sect. 1.1, 2"! Par. > FIVE RBI PROCESS OUTCOME ITEMS
212) The primary work products of the RBI assessment and management approach are
plans that address ways to manage risks on:
Answer: C ... (Ref: Purpose Section 1.2, First Sentence > RBI Benefits & Limitations)
Answer: D ... (Ref: Purpose Section 1.2, Second Sentence > RBI Benefits & Limitations)
214) When planning an RBI assessment, which of these is done to focus the effort when just
getting started?
A) Aligning priorities
B) Identifying boundaries
C) Creating the team
D) Screening
Answer: D ... Ref: Para 7.1 Getting Started > Screening is done to focus the effort
215) At the beginning of an RBI exercise, it is important to answer all these questions
except:
Ans: C ... Ref: Par 7.1 Getting Started > How results will be used & what is plan period!
216) An RBI assessment should be undertaken with clear objectives and goals that are:
Answer: B ... Ref: Para 7.2.1 > Planning the RBI Assessment ... General
Answer: A ... Ref: Para 7.2.3 > Planning the RBI Assessment ... Define Risk Criteria
218) Who may judge if an individual equipment item & cumulative risks are acceptable?
Answer: C ... Ref: Para 7.2.3 > Planning the RBI Assessment ... Define Risk Criteria
219) Inspection may not be sufficient to manage risks to acceptable levels when:
Answer: D ... Management of Risks (Other Risk Management) ... Sect 6.6.4
220) Which statement is FALSE regarding the relationship between RBI and Other Risk-
Based and Safety Initiatives?
A) Output from several of the risk-based and safety initiatives can provide input to RBI efforts
B) RBI methodology is intended to complement other risk-based and safety initiatives
C) RBI outputs can be substituted for several safety and risk-based initiatives
D) RBI outputs may be used to improve safety and risk-based initiatives
Answer: C ... Relationship between RBI & other Risk-Based & Safety Initiatives > 6.7.1
Ans: C ... Mgmt of Risks (Relationship between RBI & Other Safety Initiatives) > 6.7.2
222) Which statement is FALSE regarding the relationship between RBI and PHA?
A) RBI study can include a review of output from any PHA conducted on a unit being evaluated
B) PHA-identified hazards that can cause degradation/failure can be addressed in RBI analysis
C) Potential hazards identified in a PHA will often affect the POF side of the risk equation
D) RBI assessment results do not enhance the overall value of the PHA
Ans: D ... Mgmt of Risks (Relationship between RBI & Other Safety Initiatives) > 6.7.2
223) Which of these statements are false regarding the relationship between RBI and PSM?
A) An effective PSM system can significantly reduce risk levels in a process plant
B) Several of the features of an effective PSM program provide input for an RBI study
C) The RBI program cannot improve the mechanical integrity aspect of the PSM program
D) RBI system will improve inspection plan focus, resulting in a strengthened PSM program
Ans: C ... Mgmt of Risks (Relationship between RBI & Other Safety Initiatives) > 6.7.3
224) The primary product of an RBI effort should be:
Ans: B ... Management of Risks (Use RBI to establish Insp plans/prioroties) ... Sect 6.6.2
225) A logical & structured process for planning & evaluating inspection activities for
pressure equipment is:
A) Risk Analysis
B) RBI
C) Inspection Planning
D) Mitigation
Ans: B ... Management of Risks (Use RBI to establish Insp plans/prioroties) ... Sect 6.6.2
226) The inspection plan should detail (what) related to the current operation?
A) POF
B) Mitigated risk
C) Unmitigated risk
D) None of these
Ans: C ... Management of Risks (Use RBI to establish Insp plans/prioroties) ... Sect 6.6.2
227) For risks considered unacceptable, the inspection plan should contain (what)?
A) Mitigation actions that are required to reduce mitigated risk to acceptable levels
B) Mitigation actions that are required to reduce unmitigated risk to acceptable levels
C) Mitigation actions that are recommended to reduce mitigated risk to acceptable levels
D) Mitigation actions that are recommended to reduce unmitigated risk to acceptable levels
Ans: D ... Management of Risks (Use RBI to establish Insp plans/prioroties) ... Sect 6.6.2
Ans: B ... Management of Risks (Use RBI to establish Insp plans/prioroties) ... Sect 6.6.2
229) What statement is true regarding risk when using a precise numeric value
(quantitative risk plot) when compared to a qualitative risk matrix (precision versus
accuracy)?
A) A precise number value implies a greater level of accuracy when compared to a risk matrix
B) A precise number values implies a lower level of accuracy when compared to a risk matrix
C) A precise number value implies a greater level of precision when compared to a risk matrix
D) A precise number values implies a lower level of precision when compared to a risk matrix
Answer: A ... Introduction to RBI ... Sect 6.4 ... Precision versus Accuracy
230) Which statement is NOT TRUE regarding Accuracy versus Precision in risk analysis?
A) RBI analysis accuracy depends on sound methodology/quality data/ knowledgeable personnel
B) Accuracy is a function of analysis methodology & quality of data & application consistency
C) Regarding risk analysis, there is little significant difference between accuracy & precision
D) Precision is a function of selected metrics & computational methods
Answer: C ... Introduction to RBI ... Sect 6.4 ... Precision versus Accuracy
231) Regarding RBI & Operational risk, Mechanical integrity & functional performance of
equipment depends on the suitability of the equipment to operate safely & reliably (when)?
A) Under normal & abnormal (upset) operating conditions that equipment is exposed to
B) Only under the normal operating conditions that the equipment will be exposed to
C) Only under abnormal (upset) operating conditions that equipment 1s exposed to
D) None of these are correct
Answer: A ... Understanding how RBI can manage Operating Risk ... Section 6.5
232) Regarding RBI & Managing Operational Risk, risk changes with time and is:
Answer: A ... Understanding how RBI can manage Operating Risk ... Section 6.5
233) Regarding RBI & Managing Operational Risk, suitability and current condition of the
equipment within the established IOW (integrity operating windows) will determine:
A) Both the POF & COF of the equipment from one or more damage mechanisms
B) The POF of the equipment from one or more damage mechanisms
C) The COF of the equipment from one or more damage mechanisms
D) None of these are correct
Answer: B ... Understanding how RBI can manage Operating Risk ... Section 6.5
234) Hazard identification in an RBI analysis generally focuses on:
Answer: B ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
A) Total risk
B) Risk associated with equipment damage
C) Risk associated with safety and environmental impact
D) None of these is correct
Answer: A ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
236) Which of these statements are true regarding the QRA and an RBI analysis?
Answer: B ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
Understand QRA basics > C = true, A = Only ORA is generally perform xperien
risk analysts, B = There are opportunities to link the detailed QRA with an RBI study, and
D = Not correct because C was the only correct answer.
237) Semi-quantitative is a term that describes any approach that has aspects derived from:
Answer: B ... Types of RBI Assessment ... Sect 6.3.3 ... Semi-Quantitative RBI approach
238) Which of these statements are FALSE regarding the semi-quantitative approach?
A) It uses the benefits of both a qualitative approach (speed) and a quantitative approach (rigor)
B) Most of the data used in a quantitative approach is needed for this approach but in less detail
C) Models may not be as rigorous as those used for the quantitative approach
D) None of the statements are false
Answer: D ... Types of RBI Assessment ... Sect 6.3.3 ... Semi-Quantitative RBI approach
239) How are QRA models evaluated to provide insights into the level of risk and important risk
factors?
A) Quantitatively
B) Qualitatively
C) Probabilistically
D) Semi-quantitatively
Answer: C ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
Answer: A ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
Answer: B ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
242) When performing QRA, “Event Trees” are used to delineate (outline):
Answer: C ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
243) When performing QRA, “Fault Trees” are used to depict (show):
Answer: D ... Types of RBI Assessment ... Sect 6.3.2 ... Know Quantitative RBI approach
Fault trees depict wavs in which system failures represented in event trees can occur >
None of the above = often the correct answer on API exams ... Expect 4 to 5 questions to
have “None of the above” & most are the answer!
244) If a quantitative RBI study is conducted rigorously and properly, the resultant risk
number should be a fair approximation of the:
Ans: D ... Relative Risk vs. Absolute Risk > Sect 5.6 > Actual risk of failure (loss of cont.)
245) Key elements of any RBI Program should include documented methods to determine:
Answer: B ... Introduction to RBI ... Section 6.1 ... Both POF & COF
246) All items that fall on or very near the line with the arrow (API 580 Figure 2) indicate:
Answer: C ... Consequence & Probability for RBI ... Section 6.2 ... Know Risk Plot details
247) What statement is true regarding items # 2 and # 10 (See API 580 Figure 2) above?
A) Roughly equivalent risk levels as they are an even distance away from the risk line
B) One item (#10) has an acceptable risk level and item # 2 has an unacceptable risk level
C) Great risk levels exist for both items 2 & 10 as they are both equally far from the risk line
D) None of these are correct
Answer: B ... Consequence & Probability for RBI ... Section 6.2 ... Know Risk Plot details
A) Figure 2 is a Qualitative Risk Matrix and the arrow designates a residual risk line
B) Figure 2 is a Quantitative Risk Plot and the arrow designates an ISO-risk line
C) Figure 2 is a Qualitative Risk Plot and the arrow designates an ISO-risk line
D) None of these is correct
Answer: B ... Consequence & Probability for RBI ... Section 6.2 ... Know Risk Plot details
High
Detail of
RBI
analysis
Low
A) Figure 3 is a Qualitative Risk Plot and the arrow designates an ISO-risk line
B) Figure 3 is a Quantitative Risk Plot and the arrow designates an ISO-risk line
C) Figure 3 is a Continuum of RBI approaches and the right side shows a Qualitative approach
D) Figure 3 is a Continuum of RBI approaches and the right side shows a Quantitative approach
Ans: D ... Types of RBI Assessment ... Sect 6.3 ... Know Continuum of RBI approaches
250) Which statement is correct (API 580 Figure 3 above) for the vertical line (right side)?
Ans: B ... Types of RBI Assessment ... Sect 6.3 ... Know Continuum of RBI approaches
251) In RBI assessments, RBI procedure can be applied using any of these approaches
except:
A) Qualitative B) Quantitative
C) Semi-quantitative D) Semi-qualitative
Ans: D ... Types of RBI Assessment ... Sect 6.3 ... Know Continuum of RBI approaches
252) Each RBI procedural approach develops a risk ranking measure to be used for
evaluating both POF and COF in order to:
Ans: A... Types of RBI Assessment ... Sect 6.3 ... Know Continuum of RBI approaches
253) The qualitative approach requires data inputs based on descriptive information using:
Answer: D ... Types of RBI Assessment ... Sect 6.3.1 ... Know Qualitative RBI approach
254) The complexity of risk calculations is a function of:
Answer: B ... Relative Risk versus Absolute Risk > Section 5.6
255) Calculating absolute risk can be very time and cost consuming and often cannot be
done with a high degree of accuracy, due to:
Answer: A ... Relative Risk versus Absolute Risk > Section 5.6
Answer: C ... Relative Risk versus Absolute Risk > Section 5.6
257) So that facilities, units, systems, equipment or components can be ranked and risk
management efforts can focus on higher ranked risks, RBI is focused on a systematic
determination of:
Answer: C ... Relative Risk versus Absolute Risk > Section 5.6 > C is the best answer!
258) If a quantitative RBI study is conducted rigorously and properly, the resultant risk
number should be a fair approximation of the:
A) Residual risk
B) Absolute risk
C) Relative risk
D) Actual risk
Ans: D ... Relative Risk vs. Absolute Risk > Sect 5.6 > Actual risk of failure (loss of cont.)
259) Before decisions are based on risk analysis, the risk analysis results should be:
260) The risk analysis should be VALIDATED before decisions are made based on:
261) After completing a risk analysis, if the risk is not acceptable, what must be
considered?
A) Mitigation
B) Inspection
C) Reassessment
D) None of these is correct
262) A complete RBI program provides a consistent methodology for assessing the
optimum combination of:
263) Each available inspection method can be analyzed and its relative effectiveness in
reducing failure probability can be estimated, and given this information and the cost of
each procedure, what can be developed?
A) An optimization program
B) An effective Inspection Plan
C) An effective mitigation strategy
D) A cost-effective inspection strategy
264) API 580 Figure 1 presents curves showing reduction in risk that can be expected
when:
265) Which statement is FALSE for the upper curve in Figure 1 of API 580?
A) With an initial investment in inspection activities, risk generally is significantly reduced
B) A point is reached where additional inspection activity begins to show a diminishing return
C) It represents typical inspection program & where there 1s no inspection, risk levels are higher
D) If excessive insp is applied, risk levels may fall (invasive inspection may cause deterioration)
Answer: D ... Inspection Optimization > Section 5.5 > D ... risk levels may rise = correct!
266) The short vertical arrow below lower curve (above bottom line) in Figure 1 represents:
268) Figure 1 Lower curve indicates which of the following can be achieved with
application of an effective RBI program?
A) Inspection activities are focused on higher risk items and away from lower risk items
B) Lower risks can be achieved with the same level of inspection activity as a typical program
C) Higher risks cannot be mitigated to the same levels of inspection activity as a typical program
D) None of these are correct
A) Risk mitigation
B) Risk reduction
C) Risk management
D) Risk communication
Answer: C ... (Basic Risk Assessment Concepts ... Risk Mgmt. & Reduction) ... Section 5.2
270) Which of these statements are true regarding Risk Management & Risk Reduction?
A) Once the risk is known & the magnitude of the risk is established, it is time for risk reduction
B) Risk management and risk reduction are synonymous
C) Risk management is only a part of risk reduction
D) None of the above statements are true
271) Risk reduction is the act of mitigating a known risk that is deemed to be too high toa:
A) Lower, more manageable level of risk using risk communication
B) Lower, more acceptable level of risk with some form of risk reduction activity
C) Lower, more manageable level of risk with some form of risk analysis to be performed
D) None of the above statements are correct
Answer: B ... (Basic Risk Assessment Concepts ... Risk Mgmt. & Reduction) Section 5.2
272) RBI represents the next generation of inspection approaches and interval/due date
setting, recognizing that the ultimate goal of inspection is:
Answer: A ... Evolution of Insp. Intervals/Due Dates > Section 5.3 > Must Know!!!
273) RBI, as a risk-based approach, focuses attention specifically on the equipment and
associated damage mechanisms representing:
Answer: C ... Evolution of Insp. Intervals/Due Dates > Section 5.3 > Must Know!!!
274) A Hazard and operability study (HAZOP study) is a form of:
Answer: A ... Definitions > Para 4.1.22 > HAZOP ... MUST KNOW THIS ONE!!!
Answer: B ... Definitions > Par 4.1.22 > HAZOP = Identify hazards & operability issues
277) Established limits for process variables that can affect the integrity of equipment if the
process operation deviates from established limits for a predetermined amount of time is a:
A) Design Premise
B) IOW
C) MOC
D) None of these
Answer: B ... Definitions > Par 4.1.24 > Definition of integrity operating window!
278) A documented management system for review and approval of changes in process,
equipment or piping systems prior to implementation of the change is called:
A) Risk Management
B) Design Premise
C) IOW
D) MOC
Answer: B ... Definitions > Par 4.1.18 > Two types of failures (announced/unannounced)
A) Slow leak under insulation not detected (until someone notices a drip or wisp of vapor)
B) Slow leak under insulation not detected (until a pool of fluid forms on the ground)
C) Small leak in a heat exchanger tube or a small leak in a buried piping system
D) Slow leak under insulation in an H2S line that is detected by a plant alarm
Answer: D ... Definitions > Par 4.1.18 > Two types of failures (announced/unannounced)
Answer: C ... Definitions > Par 4.1.18 > Two types of failures (announced/unannounced)
A) For RBI, the failure of concern is loss of containment of pressurized equipment items.
B) Examples of failure modes are thinning, pitting, cracking and rupture
C) Examples of failure modes are small hole, crack, and rupture
D) Failure mode is defined as the manner of failure
Answer: B ... Definitions > Par 4.1.19 > This is different from “Damage Mode” in 4.1.9
283) By API 580 definition, an “event” is the occurrence of a particular set of:
A) Circumstances
B) Initiated actions
C) Consequences
D) Scenarios
Answer: A ... Definitions, Section 4.1.14 > Must know all the types of events
284) QRA generally uses “which of these” to depict combinations of events and progression of
incidents that provide both qualitative and quantitative insights into the level of risks?
Answer: C ... Definitions > Par 4.1.31 > Definition of Quantitative Risk Analvsis
285) QRA generally uses analysis logic models to estimate the frequency of each incident
sequence using what is known as:
Answer: D ... Definitions > Par 4.1.31 > Definition of Quantitative Risk Analysis
286) Which of these statements are not true regarding a Qualitative Risk Analysis?
Answer: A ... Definitions > Par 4.1.30 > Qualitative Risk Analysis = NOT ORA
287) The Process of integrating inspection data or other changes into a risk analysis is called:
A) Reassessment
B) Risk Management
C) Reintegration
D) Risk Mitigation
Answer: A ... Definitions > Par 4.1.32 > Reassessment > KNOW FIGURE 4
288) Physical manifestation of damage (wall thinning, pitting, cracking, rupture) is called:
A) A damage (or deterioration) mechanism
B) A damage (or deterioration) mode
C) Deterioration
D) Degradation
Answer: B ... Definitions > Para 4.1.9 > See also 4.1.8 & 4.1.12 (Tricky)
289) RBI is synonymous with:
A) Risk-based analysis
B) Risk-based analysis and risk management
C) Risk-prioritized and risk-informed inspection
D) Risk-prioritized analysis and risk management
A) Risk Analysis
B) Risk-based methods
C) Risk Analysis and Risk management
D) Risk-prioritized and risk-informed inspection
Answer: D ... (Forward Section ... API 580 Forward Statements) ... *** MUST KNOW
292) API 580 provides information on using risk analysis in order to:
Answer: A ... (Introduction Section for API 580) ... *** Must Know
293) The purpose of API 580 is to provide users with the basic elements needed to:
A) Risk Analysis
B) Risk Assessment
C) Risk Estimation
D) None of these
Answer: A ... Definitions > Para, 4.1.37
295) An item affecting either the probability, consequence, or both such that it constitutes a
significant portion of the risk is:
A) Relative Risk
B) Risk Driver
C) Absolute Risk
D) Risk Criteria
296) Process used to assign values to probability & consequence of a risk (that may consider
cost, benefits, stakeholder concerns, & other variables, as appropriate for risk evaluation):
A) Risk Estimation
B) Risk Evaluation
C) Risk Analysis
D) Risk Criteria
Answer: A ... Definitions > Expect the shorter version of the question to be on the exam
... aS underlined above > Para 4.1.44
297) Process used to compare th im: risk against given risk criteria to determine the
significance of the risk (that may be used to assist in the acceptance or mitigation decision):
Answer: C ... Definitions > Expect the shorter version of the question to be on the exam
... aS underlined above > Para 4.1.45
298) Process to find. list. and characterize elements of risk (that may include a source, event,
consequence, or probability):
Answer: D ... Definitions > Expect the shorter version of the question to be on the exam
... aS underlined above > Para 4.1.46
299) Regarding reassessments, it is important to maintain and update an RBI program to
ensure that:
A) All past and present inspection, process, and maintenance information is included
B) The most recent inspection, process, and maintenance information is included
C) All inspection, process, and maintenance assumptions are included
D) None of these
Ans: B, Par 15.1 > RBI Reassessments > Most recent information is vital
Ans: B, Par 15.1 > 4 items (RBI Reassessments Triggered) > Risk assess premise change
301) Which of these is NOT a key factor that can trigger an RBI reassessment?
Ans: C, Par 15.2 > 4 items (RBI Reassessments Triggered) > Risk assess premise change
302) It is important that the facility have which of the following to identify when a
reassessment is necessary?
303) Which statement is false regarding main function & responsibility of a Team Leader?
A) He should integrate inputs, outputs, organizational structure, & communications of his team
B) He assures a study is conducted properly & prepares an assessment report & distributes it
C) He forms the team & verifies members have necessary skills, experience and knowledge
D) He follows up to assure that an appropriate risk analysis has been performed
Ans: D, Par 16.2.2 > Team Leader > Main Function & Responsibilities > Follows up to
assure that ropriate risk mitigation actions h nimplemen
304) Which of the following statements is false regarding an “event”?
Answer: D ... Definitions, Section 4.1.14 & 4.1.16 > Must know all the types of events
Answer: C ... Definitions, Section 4.1.15 > Must know! > Future Potential occurrences!
Answer: A ... Definitions, Section 4.1.15 > Must know! > Cannot be controlled!
307) Assumptions made during design such as design life & corrosion allowance) are called:
A) Risk premise
B) Design premise
C) Risk estimation
D) Design estimation
A) Risk Estimation
B) Risk Management
C) Risk-Based Inspection
D) Risk identification
310) Actions taken to lessen the probability, negative consequences, or both associated witha
particular risk is called:
A) Risk mitigation
B) Risk reduction
C) Risk avoidance
D) Risk management
Answer: B ... Definitions > Para 4.1.49 > MUST KNOW = NOT MITIGATION
Answer: B ... Definitions > Par 4.1.31 > Definition of Quantitative Risk Analysis
312) An analysis that quantifies the probabilities and consequences of the probable damage
mechanisms is called:
A) Risk analysis
B) Qualitative risk analysis
C) Quantitative risk analysis
D) Semi-Quantitative risk analysis
Answer: C ... Definitions > Par 4.1.31 > Definition of Quantitative Risk Analysis
313) Termination of the ability of a system, structure, equipment or component to perform its
required function of containment of fluid (i.e. loss of containment) is called:
A) Deterioration
B) Degradation
C) Failure
D) Damage
Ans: C ... Definition > Par 4.1.18 > Know the difference between deterioration & failure!
Failure = termination of the ability ... Deterioration = reduction of the ability
314) RBI is not a substitute for:
Answer: A ... (Ref: Sect 2.3 First Para > Mech Integrity Focused) ... ** Should Know
Answer: D ... (Ref: Sect 2.3 First Para > Mech Integrity Focused) ... ** Should Know
316) Types of equipment & associated components NOT covered by API 580 are:
Ans: D ... (Ref: Sect 2.4 First Para > Equip Covered) > Only Pressure-containing parts
Answer: D ... (Ref: Sect 2.5 > Equipment Not Covered) > Machinery (except casings) =
not covered ... pressure relief devices are COVERED! > *** YOU MUST KNOW THIS!!!
318) Instrument and control systems & electrical systems may be covered by other types of
RBI or risk assessment work processes such as:
Answer: B ... (Ref: Sect 2.5 > Equipment Not Covered) > RCM
319) When RBI is used as a continuous improvement tool, it offers an added advantage of:
Answer: A ... (Ref: Sect 1.3, Second Para. > RBI as a Continuous Improvement Tool)
320) As new data becomes available or when changes occur in operating conditions, what
should be done in RBI?
Answer: D ... (Ref: Sect 1.3, First Paragraph > RBI as a Continuous Improvement Tool)
321) Integration of other efforts (PHA, IOWs, RCM) with RBI is the key to the success of:
Answer: B ... (Ref: Sect 1.4, First Para. > RBI as an Integrated Management Tool)
322) RBI produces inspection and maintenance plans for equipment that identify the actions
that should be taken to provide:
A) Cost-effective mitigation
B) Environmental protection
C) Reliable and safe operation
D) Process Safety Management
Answer: C ... (Ref: Sect 1.4, Second Para. > RBI as an Integrated Management Tool)
323) API 580 specifically targets the application of RBI in what industry (or industries)?
Answer: C ... (Ref: Sect 2.1 First Paragraph > Industry Scope)