The document is a quotation from Artville Technical Services to Hajar for interior construction work. It includes supplying and installing gypsum boards, AC pipes, painting walls and ceilings, and removing wallpaper. The total cost is AED 7,000. The terms specify payment schedules, project timelines, scope of work details, and beneficiary bank account information.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
2K views2 pages
Bulkhead Ceiling Quotation
The document is a quotation from Artville Technical Services to Hajar for interior construction work. It includes supplying and installing gypsum boards, AC pipes, painting walls and ceilings, and removing wallpaper. The total cost is AED 7,000. The terms specify payment schedules, project timelines, scope of work details, and beneficiary bank account information.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
QUOTATION
REFERENCE NO.: AV-082622
TO: Hajar Date: 26.08.2022
SCOPE OF WORKS:
Sr. ITEM DESCRIPTION QUANTITY UNIT AMOUNT
NO. 0. Supply, installation and fixing of 12.5mm regular LS PCS Ls gypsum board bulkhead. Item includes furring channels, galvanized angles, clips, rods and all materials needed to finish. 1. Supply of installation of AC pipe. Item includes LS PCS Ls cutting a hole through the wall, if necessary, tapes, clips and all materials needed to finish. 2. Supply and All painting work of wall and LS PAIL LS ceiling using Jotun white paint. Item includes taping, sanding, putty works, primer and topcoats and all material needed to finish. 3. Removal of existing wallpaper. Item includes LS No. LS scraping, compound application on the wall and all materials needed to finish.
GRAND TOTAL AMOUNT: AED 7,000 ONLY
Terms and Agreement:
1. 75% Down Payment upon confirmation of this quotation, 20% upon material delivered and 5% balance to be paid upon work completion (Turnover of the Project) 2. Team mobilization, delivery of materials and work shall commence on the site once the advanced payment is received. 3. All jobs are in accordance with the scope of work, as agreed and specified above, any changes outside the specified work or additional work will be considered as variation and it will be an additional cost to be determined separately. 4. Sufficient space for storage of materials on site should be provided by the client. 5. Artville Technical Services reserves the right to withhold any activity on site in case of delayed payments of more than 3 working days 6. Dewa consumption in the process of execution of this work shall be borne by the client. 7. Any government related requirements in execution of this work shall be for the client’s account. 8. This quotation is valid only until 30 September 2022. All prices are subject for a change upon expiry of this quotation.