0% found this document useful (0 votes)
29 views4 pages

Form Penilaian Moh. Syukran DM

The document evaluates Moh. Syukran DM for the position of Social Safeguard Junior on the Central Sulawesi Rehabilitation and Reconstruction Project. It finds that Moh. Syukran DM meets the minimum qualifications, with a general qualification score of 30 out of 30, an adequacy for the project score of 60 out of 60, and an experience in the region score of 10 out of 10, for a total score of 100 out of 100. Moh. Syukran DM has over 4 years of experience in social safeguard for large scale projects.

Uploaded by

Rifai Aee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views4 pages

Form Penilaian Moh. Syukran DM

The document evaluates Moh. Syukran DM for the position of Social Safeguard Junior on the Central Sulawesi Rehabilitation and Reconstruction Project. It finds that Moh. Syukran DM meets the minimum qualifications, with a general qualification score of 30 out of 30, an adequacy for the project score of 60 out of 60, and an experience in the region score of 10 out of 10, for a total score of 100 out of 100. Moh. Syukran DM has over 4 years of experience in social safeguard for large scale projects.

Uploaded by

Rifai Aee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

INDIVIDUAL EVALUATION

PROJECT MANAGEMENT CONSULTANT (PMC) CSRRP


Position : Social Safeguard Junior

Assesment
Minimum General Adequacy for Experience in
Name Status
Score Qualification the project The Region Total Score Remarks
(30%) (60%) (10%)

Moh. Syukran DM Proposed 70,00 30,00 60,00 10,00 100,00 Comply


Project Management Consultant (PMC) Central Sulawesi Rehabilitation and Reconstruction Project (CSRRP)
IDB - NSUP PROJECT

II. Non Key professional staff qualifications and competence for the assignment

Consultant Name : PT. Adhicipta Engineering Consultant JV. PT. Lenggogeni, PT. LPPSLH Konsultan

Adequacy for the project (education, training, and Experiece in regoin


experience in the specific sector, field, subject, and (knowledge of the local
so forth, relevant to the particular assignment) language, culture,
(Score 60 points) administrative system,
General Qualification General qualifications (general
education and training, length of experience, positions
Fluent in Weighted
held, previous assignments as team expert, experience Total Score Weight
NO POSITION NAME Experience English both Score
in developing countries, and so forth) [30] working experience with
SKA in Region of writing
strong technical roles
and
speaking.

R W S R W S R W S R W S R W S
% % % % %
I PROFESIONAL STAFF

NON KEY EXPERT

2 Social Safguard Junior Moh. Syukran DM 1 30 0,30 19,27 60 0,60 0 0 0,00 1 5 0,05 1 5 0,05 1,00 8 8,000
Project Management Consultant (PMC) Central Sulawesi Rehabilitation and Reconstruction Project (CSRRP)

PERUSAHAAN :

PT. Adhicipta Engineering Consultant JV. PT. Lenggogeni, PT. LPPSLH


Konsultan

KEY EXPERT

1 POSITION: Social Safeguard Junior

NAME: Moh. Syukran DM

EXPERIENCE IN REGIONAL AND


ADEQUACY FOR THE PROJECT (Score 60 points) Reference
LANGUAGE (Score 10 points)

GENERAL QUALIFICATION Available = 1


Duration of Experience N/A = 0
(Score 30 points) Having minimum 4 years working experience in social
Experience in
safeguard for large scale project, implementing safeguard Fluent in English both of
Has a Certificate of Expertise Region
social mechanism for major infrastructure project , multiple writing and speaking.
(Y=1;T=0)
levels of porject implementation or settlement development.

No Name of Assignment Position Location Employer/Client

Bachelor Degree (S1) in relevant


major, preferably in Social Science, Lingkup Pekerjaan Kesesuaian Posisi
Duration Score
Start End Legal, Development Study, State (sesuai=1;menunj (sesuai=1; tdk (Y=1;T=0) (Y=1;T=0) (vg ; g ; f)
(month) (month)
Administration or other similar ang/terkait=0,5) sesuai=0,25)
disciplines

1 : National Slum Upgrading Project (NSUP) - City Without Slums (KOTAKU) Apr-19 Dec-21 33,00 Financing Institutional Palu City, Kab. Poso and Ministry of Public Works Bachelor (S1) Development Economics 1 1 33,00 0 1 g
Collaboration (FIC) Expert Kab. Tolitoli, Central Sulawesi and Housing-PT. Royalindo Study Program, Tadulako University,
Jakarta Palu, 1994

2 Urban Poverty Reduction Project (P2KP) – Urban Poverty Project – LOAN NO. IDA Apr-11 Jun-18 88,00 Training Expert Palu City, Kab. Banggai, Kab. Ministry of Public Works 1 1 1 88,00
Cr. 3658-IND/IBRD 4664-IND Poso and Kab. Tolitoli, and Housing - PT. Chakra
Central Sulawesi Hasta Jakarta - PT. Buana
Archicon Jakarta

3 Urban Poverty Reduction Project (P2KP) – Urban Poverty Project – LOAN NO. IDA Apr-07 Dec-07 9,00 Training Expert Palu City, Kab. Banggai, Kab. Ministry of Public Works 1 1 9,00
Cr. 3658-IND/IBRD 4664-IND Poso and Kab. Tolitoli, and Housing - PT. Chakra
Central Sulawesi Hasta Jakarta - PT. Buana
Archicon Jakarta

4 Urban Poverty Reduction Project (P2KP) – Urban Poverty Project – LOAN NO. IDA Jun-10 Mar-11 10,00 Capacity Building Expert Central Sulawesi Province Ministry of Public Works 1 1 10,00
Cr. 3658-IND/IBRD 4664-IND., Program: National Program for Community and Housing - PT. Buana
Empowerment (PNPM) Mandiri Urban Archicon Jakarta

5 Urban Poverty Reduction Project (P2KP) – Urban Poverty Project – LOAN NO. IDA Jan-08 May-10 29,00 City Coordinator Palu City, Kab. Banggai, Kab. Ministry of Public Works - 1 1 29,00
Cr. 3658-IND/IBRD 4664-IND. Program Name : National Program for Community Poso, and Kab. Toli-Toli PT. Cakra Hasta Jakarta
Empowerment (PNPM) Mandiri Urban Central Sulawesi (Consortium: PT. PPA
Consultants , PT. Aulia
Sakti Internasional, NGO.
Kayu Riva, PT. Buana
Archicon

6 Urban Poverty Reduction Project (P2KP) – Urban Poverty Project – LOAN NO. IDA Dec-05 Mar-07 16,00 City Coordinator Palu City, Kab. Banggai, Kab. Ministry of Public Works - 1 1 16,00
Cr. 3658-IND/IBRD 4664-IND. Program Name : National Program for Community Poso, and Kab. Toli-Toli PT. Cakra Hasta Jakarta
Empowerment (PNPM) Mandiri Urban Central Sulawesi (Consortium: PT. PPA
Consultants , PT. Aulia
Sakti Internasional, NGO.
Kayu Riva, PT. Buana
Archicon

7 Urban Poverty Reduction Project (P2KP) – Urban Poverty Project – LOAN NO. IDA Mar-05 Nov-05 9,00 Assistant City Coordinator Palu City and Banggai Ministry of Public Works - 1 1 9,00
Cr. 3658-IND/IBRD 4664-IND Regency, Central Sulawesi PT. Cakra Hasta Jakarta
(Consortium: PT. PPA
Consultants PT. Aulia Sakti
Internasional, NGO. Kayu
Riva)

8 Urban Poverty Reduction Project (P2KP) – Urban Poverty Project – LOAN NO. IDA Apr-04 Feb-05 11,00 Senior Village North Palu District, Palu City Ministry of Public Works - 1 0,5 5,50
Cr. 3658-IND/IBRD 4664-IND Facilitator/District PT. Cakra Hasta Jakarta
Coordinator (Consortium: PT. PPA
Consultants, PT. Aulia
Sakti Internasional, NGO.
Kayu Riva)
Project Management Consultant (PMC) Central Sulawesi Rehabilitation and Reconstruction Project (CSRRP)

PERUSAHAAN :

PT. Adhicipta Engineering Consultant JV. PT. Lenggogeni, PT. LPPSLH


Konsultan

9 Sulawesi Agricultural Area Development Project (PPWT-SAADP) IBRD-LOAN 4007 Oct-00 Dec-03 40,00 District Facilitator Poso Regency, Kab. Ministry of Agriculture - 0,5 0,5 10,00
IND CENTRAL SULAWESI, Program Name : Integrated Regional Development Coordinator Morowali and Kab. Tojo Una- Rosontapura Palu
Program (PPWT) Una Foundation and Anuntodea
Palu Foundation

10 Sulawesi Agricultural Area Development Project (PPWT-SAADP) IBRD-LOAN 4007 Dec-99 Oct-00 11,00 District Facilitator Una-Una District and Kec. Ministry of Agriculture - The 0,5 0,5 2,75
IND CENTRAL SULAWESI, Program Name : Integrated Regional Development Ampana Tete Kab. Tojo Una- Ibnu Khaldun Foundation
Program (PPWT) Una and the Rosontapura Palu
Foundation

11 National Program for Poverty Alleviation by Presidential Instruction for Oct-94 Oct-97 38,00 Field Worker South Bungku District, Ministry of Manpower 1 0,5 19,00
Disadvantaged Villages (IDT) Morowali Regency
(Previously still Poso
Regency)

JUMLAH TOTAL 1,00 231,25 0 1 g

You might also like