Hira For Loading and Unloading
Hira For Loading and Unloading
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Loading and Unloading Structural Material
ACTIVITY
PRESENT
(JOB PROBABILI
Sl No HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK CONTROL SEVERITY
STEPS IN TY
MEASURE
SEQUENCE)
1 Positioning a) Accident due 1) Training to
of to collision with signalman should
crane/Hydr personnel . be ensured before 2 2
a taking up the work.
body injury/ Property
3 4 12
damage
2) Signalman
should give proper
signal to crane 2 2
operator
b) Toppeling of 1) Crane operator
crane due to should have valid 2 2
uneven ground licence.
surface or
uneven loading 2) Ensure that no
persons should
2 2
stand near crane
swinging area.
body injury/ Property 3) Marching route
4 5 20
damage shall be checked
in advance and 2 2
ensured clear.
4) Safe working
load (SWL) and
last date of test 2 2
should displayed
on the crane
2 Tying sling a) Hand injury 1) Use hand
and D- due to improper gloves.
shackle handling. body injury 3 2 6 2 2
2) Signalman
should give proper
signal to crane 2 2
operator
4 Removing 1) Injury to finger 1) No movement
of sling, D or hand of load should be
shackle allowded while 2 2
removing sling.
body injury 3 2 6
2) Use PPE like
hand gloves and
helmet safety 2 2
shoes etc.
CONTROL FINAL
RESPONS
RISK LED RISK ASSESSM
IBILITY
RATING ENT
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4 Site
BLE ABLE
Engineer /
Manager
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
Site
Engineer /
Manager
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
TOLERA ACCEPT
4
BLE ABLE
Approved By