Paper 4
Paper 4
Abstract: The new developed area stability control system 1.1 Configuration of Eastern P a r t of Heilongjiang Power
in the eastern part of Heilongjiang Power System has been System
introduced in this paper. The control system was designed to The east part of Heilongjiang Power System is one of
improve the power transmission capacity from the eastern the major sources of northeast china power network. It is
part of the Heilongjiang Power System to the western by connected with west part system through 220kV Mu-Shuang-
generation shedding in case of severe faults. It consists of Dong transmission lines and Shuang-Mu-Da-Dong
five control stations, two of them installed in power plants transmission lines. Its configuration is shown in Fig I .
while others in transformer substations. The GPS-based
Hadong Xigemu
accurate time signal has been introduced in every station and
the voltage phasors are measured based on it. The digital
- fanerhen Dalianhe S huang
Authorized licensed use limited to: University of Manchester. Downloaded on October 19,2023 at 13:14:26 UTC from IEEE Xplore. Restrictions apply.
1.2 Fundamental Organization of Area Stability Control five different operating conditions.
System Construction monitoring in power plant and substation.
To satisfy the resent requirement, this area stability Real power, bus voltage and frequency measurement and
control system consists of five Control Units which are calculation.
separately installed in ShuangYaShan thermal power station, Measurement, comparison and display of synchronous
MuDanJiang thermal power station, HaDong substation, voltage phasors.
XiGeMu substation and JiaNan substation. The microwave On-line data and results monitoring in forms of curves and
channels provide the data and commands communication tables.
between Control Units, whose topology is shown in Fig. 2.
Fault alarm, data recording and fault event retrospection.
The synchronous voltage phasors can be communicated by
two-way, but the shedding commands should be sent in the
direction of arrows shown in Fig. 2.
-
1.4 Function Quality of Area stability Control System
Local generation shedding respond time ( time interval
between fault occurrence and command sending) : 70ms
I I I I
Remote generation shedding respond time: lOOms
Fault detecting and identifying time: 20ms
* Minimum time period of event recording: 1,67-20ms
Fig. 2 Communication topology construction 2 Main Technical Quality of Area Stability Control
System
Each Control Unit has two standard cubicles, which is
composed of industrial PC, communication equipment, data 2.1 Hardware Realization
acquisition system, GPS receiver, UPS, PT and CT(shown in The system can be divided into three parts: SL
Fig.3). It has two control levels, fundamental level (FL) and controller, FL controller and Communication Part, shown in
supervisor level (SL). The FL controller consists of data Fig. 3. SL controller and FL controller exchange data
acquisition system and GPS receiver, whose function is to through ARCNET. The communication among Control Units
implement transient data acquisition and mark data with is realized by DSP-based intelligent communication control
exact time-tag. The marked data is transmitted to SL card, modem and microwave channels. The hardware quality
controller through ACRNET. The SL controller based on is shown as below:
industrial PC (Pentium CPU) is responsible for data Accuracy of synchronizing clock signal based on GPS
calculation, processing and analysis as well as control timing system: 5ps.
command sending by FL controller or microwave DFT-based on line phasor measuring algorithm
communication equipment. * Stratified construction of local network, easy to multiply.
The main design object of Control Unit in plant is to
detect fault on the buses and transmission lines, to determine
-
SL controller, with friendly interface and powerful
reorganizing function, is convenient to implement logical
generation shedding according to fault type and operation and calculative processing.
condition of the East system, to send generator trigging
command after confirming the relay signal, and to receive
-
Self-defined monitor graphic display mode, self-defined
startup criterion of event recording and self-defined
the remote generation shedding command. The Control recording length.
Unit design in substation is to determine fault type, system
Multi-processor coordinated data acquisition system
operation mode and strategy table, as well as send remote
generation shedding command through microwave channels. Well electrical-magnetic compatibility design
Authorized licensed use limited to: University of Manchester. Downloaded on October 19,2023 at 13:14:26 UTC from IEEE Xplore. Restrictions apply.
2.3 Fault Type Identification check remote control commands
The area stability control system needs identify all
types of fault such as phase-to-ground, phase-to-phase, two-
phase -to-ground, three-phase fault and fault changing. To 2.5 GPS technology and phasor monitoring
avoid saturation of CT, which would lead to misjudging, a GPS (Globe positioning system) signal receivers
new integrated method combined current signal with voltage have been installed in each Control Unit in the area stability
signal has been developed. control system. GPS ensures the synchronizing clock with
By convention, only currents are used to identify fault high accuracy of 5 U s. The synchronizing clock makes it
type. But when the fault position is very near to bus the large possible to compare events in different substations, and
fault current will result in sever saturation of CT. In the first reestablish-the sequence of events which is convenient to
two cycles after fault occurrence, the deformed current is fault analysis. In addition the voltage phasors in different
hard to be used to judge fault type. In this period, substations, referenced to the synchronizing phasor built by
nevertheless, the voltage of bus apparently decreases without GPS timer, can be compared in graphic form(as shown in
saturation. When the fault occurs, the control system can Fig.4), which is the foundation of stability control approach
detect voltage drop firstly, and only if there are not apparent based on phasor measurement.
decrease in voltage the current identification method will be
used.
The calculation showed that the judging areas of
voltage criteria and current criteria overlapped in their
correct operating scope, i.e. there is not particular area that
CT is in saturation and meanwhile the voltage does not drop
apparently. A series of dynamic tests show the applicability
of this method.
Authorized licensed use limited to: University of Manchester. Downloaded on October 19,2023 at 13:14:26 UTC from IEEE Xplore. Restrictions apply.