Cprcsms 2
Cprcsms 2
Rifaim
C - Health and Safety Behavioral - Violation of PTVI EHS Policies, Standards and Procedures
1. Appropriate PPE always worn Yes
5. Workplace Risk, Hazard and Condition Changes are addressed on JSA Yes
2. Equipments Inspection (engine pre-use / start, power tools, wire rope, etc) is performed regularly No
5. Action Plans of Golden Rules and Safety Violations, SOI and JCC Findings, Management of Changes and Very Good
Meeting Recommendations
http://sorappsrvp03/oms/cprcsms2.aspx?ct=11110&pm=6208 4/1/2021
Outsourcing Management System - Contractor Periodic Evaluation Page 2 of 2
Create Cancel
http://sorappsrvp03/oms/cprcsms2.aspx?ct=11110&pm=6208 4/1/2021