HIRA - Height Work
HIRA - Height Work
Existence of
Problem /
legal
Accident Severity of Cost of Existence of Name of related
Total Likelihood Number of people requirements Name of related legal Baseline / Inherent Classification of
Zone / Department Safety Aspect (Activity / Process / Task / Material / Product / Service) Safety Hazard Safety Impact Frequency Likelihood happened accident / equipment Total Severity Score Company Company
Score exposed specifically requirement(s) Risk Score Impact
within last 5 incident damage requirements requirement(s)
applicable to
years
this event
1) Untrained / Incompetent /
Inexperienced worker.
2) Lack of Knowledge.
3) Unfit worker
6-Equipment
3-Medical
1) Fatal Injury 6-Once per Treatment
damage / As per HCCB
Thermax Safety
lost value is Construction Safety
WTP Mobilization of manpower 2) Property Damaged every 1-2 weeks 3-Unlikely 0-No 3 3-8-15 People case (beyond
more than
12 0-No
Guidelines Site
0-No Policy and Safety 216 insignificant
first aid but Management plan
1.000.000 Management plan.
no time off)
US$
1) Slip trip
2) Fall of person / Material
3) Unskilled worker
4) Uneven surface
5) Acrophobic person
6) Scaffolding part missing
7) Work without work permit
6-Equipment
1) Fatal Injuries 7-Once per 1-First Aid
damage /
Thermax Safety
lost value is
WTP Working At Heights 2) Personnel iinjury every day 3-Unlikely 0-No 3 2-3-7 People incident or
more than
9 0-No 0-No Policy and Safety 189 insignificant
near miss Management plan
3) Property Damage, Fire 1.000.000
US$
6-Equipment
damage /
WTP Entry in to the work place during COVID'19 Period Illness/Fatal 3-Once per 3-Unlikely 0-No 3 3-8-15 People
1-First Aid
incident or
lost value is
10 0-No
Factories act 1948,
0-No
Thermax Safety
Policy and Safety 90 insignificant
every 1-2 years near miss
more than
1.000.000
Chapter 3
Management plan
US$
Snake Hazard
1) Fatal
As per Factory act-
2) Minor or major Injury 6-Equipment 1948 Contractor and
3)Brain 1-First Aid
damage / Visitor Management
Thermax Safety
lost value is RequirementsES RQ-
WTP Piping work material handling. death 9-Continuous 3-Unlikely 0-No 3 3-8-15 People incident or
more than
10 0-No
110and HCCB
0-No Policy and Safety 270 insignificant
near miss Management plan
4)Coma(prolonged loss of 1.000.000 Construction Safety
US$ Guidelines-2,13,14 &
consciousness) project EHS plan.
CONTRACTOR EHS Incharger, CONTRACTOR Project Manager FABS Site Engineer FABS EHS Incharge HCCB project manager HCCB EHS Manager
HIRA-REV-02 PAGE NO
11/18/2022
1) Third party certified scaffolding inspector shall be allowed to perform the inspection..
2) Minimum 3 years of experience required for any scaffolder to work inside the project site..
3) Scaffolding material should be lifting properly by using authorised rope.
4) Scaffolders should undergo evaluation and approval before deploying to the site..
5) Do not allow uncertified or damaged rope to lifting of material.
6) All parts should be installed properly as per check list or manual.
7) Adequate platform should be provided.
8) Only authorized scaffolders are allowed foe scaffold erection and dismantling works on site.t.
9) All scaffolders should hold stickers with name on their helmet for identifications.
10) PTW system should be followed. Height work permit should be issued before start the work.
11) Erecting the scaffolding should be on the even surface and locked the wheels while working on it.
12) Scaffolding part is fixed properly or not check and ensure after installation
13) Do not erect damaged or unauthorised parts, loose parts.
14) Do not use change or modify structure.
15) All parts should be installed in their designated places.
16) Fall protection should be provided. Full Body Safety Harness is mandatory while working.
17) Tag should be placed
18) Take care of material will not hit to other material or person while lifting. 0.1-Existing Controls No action
19) All overhead utilities should be deaneries if working nearby. Adequate and Fully 19 LOW RISK required at this
20) Do not work under overhead live electrical. Implemented time
21) Sufficient manpower should be provide.
22 Avoid repetition, awkward posture, Forceful motion, Stationary position, direct pressure, etc..,
23) Material should be stacking as per size, shape, weight.
24) Working and material storage area should be barricaded.
25) Provide appropriate signboards.
26) Provide and use PPE's.
27) Work should be carried out under the supervision.
28) All scaffolders should hold stickers with name on their helmet for identification.
1. On arrival of worker by bus the security Person or dedicated person will do the Contactless Thermal Scanning for each individual entering
the site. with wearing face shield, nose mask, hand gloves, etc.. temperature checking from outside the bus window and reading should be
recorded.
2. ensure all the workers/Visitors /staff should always wear surgical face mask.
3. Workers will be stand in 6 ft. distance to maintained social Distance near to the gate. till the security Clearance
4. Marking should be done in every 6 ft. distance to maintained social Distance near to the gate.
5. Paddle operated Hand sanitizer will be made available for Hand sanitizing.
6. Verification of the medical check up certificates from MBBS Doctor for each individual and obtaining self declaration form each to identify
any COVID RISK person.
7. during all these process the Social distancing norms of 6 ft. is maintained.
8. Similarly all vehicles should be sanitised by trained person before the vehicle enters in the premises.
9. Temp scanning will be carried out during the entering the site and while leaving the site.
10. in case covid’19 related symptoms observed in any person immediately send him to nearest covid’19 authorized hospital
11. Ensure used mask should be disposed at Bio medical waste dustbins at material gate.
12. Display of emergency contact number near security gate.
13. Frisking for pan masala/gutkha to be done at gate entry. NO SPITTING policy to be explained to the workers and in case of any violation to
be imposed as per clauses
14. Safe to Stay @ home if anyone have mild fever, cough and difficulty while breathing & seek medical assistance ASAP. Strictly 0.1-Existing Controls No action
follow the directions of your local health authority. Adequate and Fully 9 LOW RISK required at this
15. Keep up to date on the latest COVID-19 hotspots (cities or local areas where COVID-19 is spreading widely). Avoid traveling to Implemented time
places – especially senior citizens diabetic, having heart or lung diseases.
16.Avoid touching eyes, nose and mouth.
17.Avoid handshake with others.
18. MSDS of Disinfectant chemical should be explained to all concern person and Display the same near gate entrance
1).Hand gloves to be provided to workers to ensure that his hand doesn't gets injured due to sharp edges of material boxes.
2).Dust mask should provide for worker because of dust during house keeping.
3).Take the general work permit before the starting of work. 0.1-Existing Controls No action
4).Area should be well illuminated. Adequate and Fully 27 LOW RISK required at this
Implemented time