12-11-2022 Daily Progress Report
12-11-2022 Daily Progress Report
No. of Team Date Team Team Person Area Description QTY Unit Remarks
JB Frame 225x570x40 Fabrication & Installation 2 Frame
JB Installation (180x220 4 Nos
Belt Trip Support Installation 6 nos
Cement Mill
01 12-11-2022 Iftkhat + 2 Helper 3 Rope Switch Installation 6 Nos
Convyre Belt Angle (40x40) 4 Mtr
Condute 25mm 18 Mtr
Condute20mm 2 Mtr
Cable Termination 3x1.5 4 cables
Cement Mill PLC Cable Termination 5x1.5mm 4 cables
2 12-11-2022 Aziz+ 1 Helper 2
Panel Cable tERmination 9x1.5mm 6 cables
Cable Termination 12x1.5mm 4 cables
Cement Mill
3 12-11-2022 Sajid + 2 Helper 3 Angle 50x50mm 27 Mtr
Convyre Belt
Cable 4x2.5mm 14 Mtr
Compressor Room
Cable 3x2.5mm 4 Mtr
Power Socket 2 Nos
4 12-11-2022 Zaryab+ 1 Helper 2
Back Box 1 No
Cement Mill SS
Cable 4x2.5mm 15 Mtr
PVC Pipe Lay 50 Ft
Cable Termination 14x1.5mm 1 cables
Cable Termination 3x1.5 11 cables
5 12-11-2022 Abu Bakar + 1 Helper 2 Clinker Silo
Cable Termination 5x1.5mm 9 cables
Cable tERmination 9x1.5mm 3 cables
Cable Laying 3x1.5mm 60 Mtr
Crusher Area
Camera Installed 1 No
C- Channel 50x100 1 Mtr
Coal Mill Cable Laying 3x1.5mm 6 Mtr
Camera Installed 1 No
6 12-11-2022 Mujahid + 4 Helper 5 C- Channel 50x100 1 Mtr
Stalker Area Cable Laying 3x1.5mm 6 Mtr
Camera Installed 1 No
C- Channel 50x100 3 Mtr
Roller Press Cable Laying 3x1.5mm 6 Mtr
Camera Installed 1 no
Cable Termination 12x1.5mm 7 cables
Cable Termination 14x1.5mm 3 cables
Cable Termination 3x1.5 13 cables
7 12-11-2022 Amir+ 1 Helper 2 Clinker Silo
Cable Termination 3x2.5mm 1 cables
Cable Laying14x1.5mm 20 Mtr
Cable Laying 3x1.5mm 108 Mtr
JB 550x800 Installation 1 No
Condute 40 7 Mtr
8 12-11-2022 Ashfaq+ 2 Helper 3 BCO4 Long Belt
Condute 25mm 8 Mtr
Angle 50x50 3 mtr