Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
39 views
MT Report
Uploaded by
Sal
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 7. MT Report For Later
Download
Save
Save 7. MT Report For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
39 views
MT Report
Uploaded by
Sal
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 7. MT Report For Later
Carousel Previous
Carousel Next
Download
Save
Save 7. MT Report For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 12
Search
Fullscreen
(Wace VIET NAM GRE-COATING ENGINEERING SERVICES JSC Project: EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES Doc. No.: VGCE-VINCI 01/08- |GRE-MT-001 MT Report lRev. 0 No. Report No Pages 1 295/18-M-001 1 235/18-M-002 235/18-M-003, 235/18-M-004 235/18-M-005 235/18-M-008, 236/18-M-007 235/18-M-008, 235118-4-009 10 235/18-M.010 235/18-M-011 Total pages "GD MAGNETIC PARTICLE TESTING REPORT CONG TY TNHH DICH VY THU KHONG PHA HUY Q.LS :4-3857325; Fax: +84-254-38335 18; Q.LS NON-DESTRUCTIVE TESTING SERVICES CO,, LTD, Hill Two, Binh Gia road, Ward 10, Vung Tau city, Ba Ria - Vung Tau provi 2, Vietnam nnd gis com. yn; Website: hips/is.com.vn Report No.:235/18-M-001 oF-001 Page _tof4 Procedure No. (Client iet Nam GRE Coating Engineering Services JSC Owner: VINCI CONSTRUCTION GRANDS PROJECT (VCGP) le Ne OVEN Rete 3 [praest EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES [Acceptance Criteria Project No. NIA ‘ASME B31.3-2016 |Request No. VGCENINGIINDT/O01 paragraph 344.3.2 Item: NIA. Equipment: Yoke Mag ¥6 MPI method IMaterialtype: Carbon Steel Serial No: 0560 Wet Continuous Welding process:_GTAW/SMAW current. AC IMPIink Nabakem SM-15 [Surface condition’ As welded Pole spacing: 75-150 mm Batch No: _AHJBJGG Cleaned by: __Brusher Liting power: [Background contrast: Nabakem MP-38 Date of inspecton 45KG Batch No. AHJHJIC 30 Nov, 2018 Field strength assessment Burmah Castrol Stip Location: GPSCNGCE's workshop No. Joint No. | Welder io Me | eee ieee [ate [inane IL Drawing No: WM-CCMIDWGIMEG/GLA/016 Sheet 1 of 1 Rev. 1_ Spool No Detail SW20a 1 1 veceoot | op= 889x549 | - E - | ace [02 sies 2 2 veck.001 | oD= 88oxs49 | — =| ace 3 3 veoe-oo1 | op= 089x549 | - i =| ace: 4 5 veck.0ot | op= 889x549 | : =| ace 5 6 vece-oot | op= ssoxsao | - : [acc | oz sides II_Drawing No: WM-CGM/DWGIMEG/CLA/O16 Shee! 1 of 1 Rev. 1 Spool No. _Detall SW206-1 4 7 vece.oo2 | op= 889x549 | - zi - | acc | ozsides 2 8 vece.oo2 | op= 880x540 | - = - | ace | o2siaes Il_Drawing No WM-GCM/DWG/MECICLAIO16 Sheet 1 of 1 Rev.: 1 Spool No: Detail SW200-2 1 9 vece.o2 | op= 889x540 | - : ~ | acc | 02sides 2 10 vece-oo2 | on= 880x549 | - 5 = [acc |_ 02 sides IV_Drawing No: WI-GCM/DWG/MECICLAIO16 Sheet 1 of 1 Rev.:1 Spool No: Detail SW200-3 1 11 vece-002 | oD= 889x549 | - - ~ [acc To sides 2 12 vece.o02 | oD= s8exs49 | - 7 ~ [acc | ce sides: V_ Drawing No: WM-COM/DWG/MECICLAIO(6 Sheet 1 of 1 Rev.:1_SpoolNo. Detail S206-4 1 13 vece-o2 | op= 68ex549 | - H - [ace [oz sides 2 14 vece.002 | op= 869x540 | - : =~ [ace | 02 sites [lecends: ACC: Accepted RE Rejected TG: Intermitent cold lap Crack U: Undercut LP: Lack of ponetration CCP: Clustered Porosity CR: Crater crack P: Porosity LE: Lack of fusion CL: Cold iap Si: Slag incusion QIS-NDT Services Co., Ltd. | ACCEPTED BY CLIENT | ACCEPTED BY OWNER | CERT. AUTHORITY Namen Chank Lim\Name: 25TWSOBVERP |Name signature: fhe Signature Signature Date: 0? pec JOM’ Date: 29 /oy J 9 Date:aD CONG TY TNH! DICH VY THU KHONG PHA HUY Q.LS Q.LS NON-DESTRUCTIVE TESTING SERVICES CO,, LTD. 02L, Hill Two, Binh Gia road, Ward 10, Vung Tau city, Ba Ria - Vung Tau province, ‘Tel: 484-254-3857325; Fax: +84-254-3833518; Email:
[email protected]
; Website: htp://qis.com.vn MAGNETIC PARTICLE TESTING REPORT Report No.:236/18-M-002 F001 Page:__1of1 Procedure No [Cient Viet Nam GRE Coating Engineering Services JSC GISAIT-CUGEN Rev,4 (OMNES VINCI CONSTRUCTION GRANDS PROJECT (VCGP) Project: EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES |Acceptance Criteria: Project No. NIA ASME 8313-2016 |Request No. VGCENVINCIINDTIOO; paragraph 344.3,2 Item: NA Equipment: Yoke Mag Y6 IMP! method: Material type: Carbon Steel |Serial No. 0550 Wet Continuous [Welding process:_GTAW/SMAW. |Current: AC MPI ink: Nabakem SM-15 |Surface condition: As welded Pole spacing: 75-150 mm [Batch No. _AHJBJGG cleaned by Brusher Liting power [Background contrast: Nabakem MP-J6|Date of inspection 45 KG [Batch No. AHJHJIC 30 Nov, 2018 Field strength assessment__ Burmah Castrol Strip Location: GPSCINVGCE's workshop No.| Joint No. ] Welder io Remit leet rom | are [acne | Remark 1 Drawing No.: WM-CCM/DWG/MEC/CLA/016 Sheet 4 of 1 Rev.: 1_ Spool No. Detail SW20c 5 45. VGCE-004 OD = 88.9% 5.49 - = : ACC 02 Sides 2 16 VGCE-004 OD = 88.9x 5.49 - : > ACC 02 Sides \l_ Drawing No.: WM-CCM/DWG/MEC/CLA/016 Sheet 1 of 1 Rev.: 1 Spool No.: Detail SW20d x 47 VGCE-004 OD = 88.9x 5.49 = - - ACC 02 Sides 2 18 NVGCE-004 OD = 88.9x 5.49 = : = ACC. 3 19 VGCE-004 OD = 88.9x 5.49 : : = ACC 4 20 VGCE-004 OD = 88.9x 5.49 - = = ACC 02 Sides Il_ Drawing No.: WM-CCM/DWG/MEC/CLA/016 Sheet 1 of 1 Rev.: 1_ Spool No. Detail SW20e-1 4. 21 NGCE-001 ol 88.9 x 5.49 : = = ACC 02 Sides 2 23 VGCE-001 ol 88.9 x 5.49 - - : ACC 3 24 NGCE-001 OD = 88.9x5.49 * - - ACC 02 Sides Il Drawing No.: WM-CCM/DWG/MECICLA/016 Sheet 1 of 1 Rev.: 1. Spool No.: Detail SW20e-2 4 25 NGCE-001 ol 88.9 x 5.49 : - : ACC 02 Sides 2 27 NGCE-001 OD = 88.9x 5.49 = - : ACC 3 28 NGCE-001 ot 88.9x 5.49 : = : ACC 02 Sides legends; ACC: Accepted REI Rejected TC: Intermittent cold lap : Crack U: Undercut LP: Lack of penetration CP: Clustered Porosity CCR: Crater crack P: Porosity LF: Lack of fasion GL: Cold fap Sk: Slag incusion QIS-NDT Services Co., Ltd. | ACCEPTED BY CLIENT ACCEPTED BY OWNER ‘CERT. AUTHORITY Namen Ghaneh Vins \Neme SETH SOPHEDP |Name: Signature: Signature: Signature: Dae: 02 Pec 201 |pate: 29/o///9 Date:ap CONG TY TNHH DICH VU THU KHONG PHA HUY Q.LS Q.LS NON-DESTRUCTIVE TESTING SERVICES CO., LTD. 021, Hill Two, Binh Gia road, Ward 10, Vung Taucity, Ba Ria - Vung Tau province, Vietnam Tel: +8 MAGNETIC PARTICLE TESTING REPORT 43857325; Fax: +84-254-3833518; Email:
[email protected]
; Website: hit: .com.vn, Report No.:235/18-M-003 QF-001 Page: tof Procedure No. |Client: Viet Nam GRE Coating Engineering Services JSC QISMT-O1/GEN Rev.1 [Owner VINCI CONSTRUCTION GRANDS PROJECT (VCGP) Project: EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES |Acceptance Criteria: Project No. NIA ASME B31.3 - 2016 |Request No. NVGCENINCINDT/001 paragraph 344.3.2 Item: NA Equipment: Yoke Mag Y6 MPI method: [Material type: Carbon Steel lSerial No: 0550 Wet Continuous Welding process:_ GTAW/SMAW. |Current: AC |MPI ink: Nabakem SM-15 Surface condition: As welded Pole spacing: 75-150 mm Batch No: _AHJBJGG [Cleaned by Brusher Liting power: [Background contrast: Nabakem MP-35|Date of inspection: 4.5 KG [Batch No. AHJHJIC 30 Nov, 2018 Field strength assessment__ Burmah Castrol Strip Location: GPSCNVGCE's workshop No] Joint No. | Welder 1D iw ‘coes:| mag | aw (acomes| mele |__Drawing No.: WM-CCM/DWG/MECICLA/016 Sheet 1 of 1 Rev.: 1 Spool No. _ Detail SW20t-1 1 29 vece-002 | op= esexsao | - - = [acc | o2sides 2 30 vece-o72 | op= easxs49 | - - - [acc | csides Il_ Drawing No: WM-CCMIDWG/MEG/CLA/O16 Sheet 1 of 1 Rev.: 1 SpoolNo. Detail SW20f-2 1 31 vece-o2 | op= 989x549 | - - - | aco [cp sides 2 32 MGCE-002 OD = 88.9x 5.49 2. = = ACC 02 Sides. IIl_ Drawing No.: WM-CCM/DWG/MEC/CLA/016 Sheet 1 of 1 Rev.: 1_ Spool No.: Detail SW20f-3 4 33 VGCE-002 OD = 88.9x 5.49 = = : ACC 02 Sides 2 34 vece-o02 | op= saoxsao | - z - | acc [ca sides !V_Drawing No.: WM-CCM/DWG/MEC/CLA/016 Sheet 1 of 1 Rev.:1_ Spool No.'__ Detail SW20f-4 i 35 VGCE-002 OD = 88.9x 5.49 = : : ACC 02 Sides 2 36 NGCE-002 OD = 88.9x 5.49 = = = ACC 02 Sides \V_Drawing No.: WM-CCM/DWG/MEC/CLA/016 Sheet 1 of 1 Rev.: 1_ Spool No.:__ Detail SW20g-1 1 37 vece-oo4 | op= saoxsao | - : - | acc [02 sides 2 38 voce-004 | OD= 88.9x5.49 zs e . ‘ACC 3 39 vece-oo4 | op= 483x368 | - 7 =| acc 4 40 vece-oo4 | OD= 889x549 - a = ‘ACC 5 41 vGce-004 | OD= 889x549 : - = ACC 02 Sides [Keaends: ACG: Accepted Ed: Rejected TG: Intermittent col ap Crack U: Undercut LP: Lack of penetration CP: Clustered Porosity OR: Crater crack P: Porosity LE: Lack of fusion GL: Cold lap Si: Slag inclusion QIS-NDT Services Co., Ltd. | ACCEPTED BY CLIENT ACCEPTED BY OWNER CERT. AUTHORITY Nami Chank Linn |Name SETH SOPHED P Nome: |Signature: Signature: |Signature: Date: 02 fer, 2o¢ _|oate: 29/a///9 Date:ap CONG TY TNHH DICH 02L, Hill Two, Binh Gia road, Ward 10, MAGNETIC PARTICLE TESTING REPORT NON-DESTRUCTIVE TESTING SERVICES CO., LTD. VU THU KHONG PHA HUY Q.LS Vung Tau city, Ba Ria - Vung Taw ‘Tel: +84-254-3857325; Fax: 484-254-3833518; Email:
[email protected]
; Website: hitp:/ais.com.vn Report No.:235/18-M-004 F-001 Page: tof t Procedure No. (Client Viet Nam GRE Coating Engineering Services JSC QIS-MT-OVGEN Rev. [Owner \VINGI CONSTRUCTION GRANDS PROJECT (VOGP) Project: EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES [Acceptance Criteria: Project No: N/A ‘ASME B31.3-2016 [Request No. VGCE/VINCINDT/O01 paragraph 344.3.2 tem: N/A. Equipment Yoke Mag Y6 MPI method: [Material ype: Carbon Steel Serial No: 0560 Wet Continuous Welding process: GTAWISMAW Current. AC MPI ink: Nabakem SM-15 [Surface condition: As welded Pole spacing: 75-160 mm Batch No: _AHJBJGG [Cleaned by: __Brusher Lifting power IBackoround contrast: Nabakem MP-35|Date of inspection 4.5 KG [Batch No. AHJHUIC 30 Nov, 2018 Field stiength assessment Burmah Castrol Stip [Location GPSCIVGCE's workshop INo.] Joint No. | Welder 1D "tel iewton| wae | wee faeces] Pema 1_Drawing No. WM-CCM/DWG/MEC/CLA/016 Sheet 1 of 1 Rev.: 1 Spool No: Detail SW209-2 4 42 vece-oo4 | op= 889x649 | - 7 - | acc [02 sides 2 43 vace-o04 | OD = 88.95.49 : - | ace 3 44 vece-oos | op= 483x368 | - : - | ace 4 45 voce.004 | op= 889x549 | - - - | ace 5 46 vace.004 | p= 88.9x5.49 : 7 - | acc [ca sides I_ Drawing No: WM-CCM/DWG/MEC/CLAVO16 Sheet 1 of 1 Rev.: 1 Spool No: Detail SW20h-1 1 47 vace.oo4 [| op= 889x549 | - - - [ace [cz sides z 48 vace-oo4 | op= saoxs4o | - - ~ | ace’ 3 49 vece-004 | op=eaoxsa9 | - | - ~_[ ace! IIl_Drawing No.: WN-GCM/DWGIMECICLA/O16 Sheet 1 of 1 Rev.: 1 Spool No: Detail SW20h-2 4 51 vece-oo1 | op= 89x54 | - = - | ace [ca sides 2 52 VGCE-004 sagxs4o | - - | ace’ 3 53 \VGCE-001 389x549 | 2 -_| ace 4 54 VGCE-001 433x368 | - - | ace’ lLeaends: ACO: Accepted REU: Rejected 1G: Intermitent col ap ©: Crack U: Undercut LP: Lack of penetration GP: Clustered Porosity OR: Crater crack P: Porosity LF: Lack of fusion CL: Cold lap Si: Slag inclusion QIS-NDT Services Co., Ltd. | ACCEPTED BY CLIENT | ACCEPTED BY OWNER | CERT. AUTHORITY Name: . |Name: 2 Name: sonal” 1m Chanh Fa Rome pened Signature Date: 02 Pec, 2014 _|Date:_ 29 /of//9 Date:aD CONG TY TNHH DICH Q.LS NON-DESTRUCTIVE TESTING SERVICES CO,, 021, Hill Two, Binh Gia road, Ward 10, VU THU KHONG PHA HUY Q.LS LrD. ‘Vung Tau city, Ba Ria - Vung Tau province, nam ‘Tel: +84-254-3857325; Fax: +84-254-3833518; Email:
[email protected]
; Website: hip://qis.com.vn MAGNETIC PARTICLE TESTING REPORT Report No.:235/18-M-005 QF-001 Page: toft Procedure No. (Client: Viet Nam GRE Coating Engineering Services JSC QIS-MT-O1/GEN Rev.1 [Owner VINCI CONSTRUCTION GRANDS PROJECT (VCGP) Project: EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES. Acceptance Criteria: Project No. NA ASME B31.3 - 2016 Request No.:__ VGCE/VINCIINDT/001 paragraph 34.3.2 Item: N/A Equipment: Yoke Mag Y6 |MPI method: Material type: Carbon Steel [Serial No.:__MP10248 Wet Continuous |Welding process: _GTAWSMAW. current. AC IMPrink: Nabakem SM-15 [Surface condition: As welded Pole spacing: 75-150 mm. Batch No. _AHJBJGG ICleaned by: Brusher Lifting power: Background contrast: Nabakem MP-36|Date of inspection: 4.5 KG [Batch No. AHJHJIC 03 Dec, 2018 Field strength assessment. Burmah Castrol Strip [Location’ GPSCIVGCE's workshop fs] sointno, | weiierio | Weklsze | Defect] Detect [Defect TEvaaton! Rama |_ Drawing No.: WM-CCM/DWG/MEC/CLA/016Sheet 4 of 1 Rev.:1_Spool No.:__ Detail SW20a 1 4 veoe.o01 [| op= 880x540 | - - ae I_ Drawing No.: WM-CCM/DWG/MEC/CLA/016Sheet 1 of 1 Rev.: 1__ Spool No.: Detail SW20e-1 +l 22 NVGCE-001 ol 88.9x5.49 : a: - ACC I Drawing No.: WM-CCM/DWG/MEC/CLA/016Sheet 1 of 1 Rev.:1_ Spool No.:__ Detail SW20e-2 iL 26 VGCE-001 OD = 88.9x 5.49 : = = ACC IV_Drawing No.: WM-CCM/DWG/MEC/CLA/016Sheet 1 of 1 Rev.: 1_ Spool No.: Detail SW20h-1 7 50 NGCE-004 OD = 48.3 x 3.68 = = = ACC V_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 4 of 1 Rev. 1 Spool No: Detail CS-30-012/1 4 15 NGCE-001 OD = 273.1 x 9.27 = = : ACC VI_Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1_ Spool No.:_Detail CS-30-012/3 i 21 NVGCE-002 OD = 273.1x 9.27 : = = ACC VIl_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1. Spool No.:__Detail CS-30-015 1 52 vece.oo1 | op= 2731x927] - 7 = | ace ‘Vill Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1_ Spool No.: _ Detail CS-30-020 Zz 66 NGCE-004 OD = 273.1 x 9.27 = : = ACT Lecends: ACC: Accepted RED Rejected 1G: Intermitent cor ap C: Crack U: Undercut LP: Lack of penetration CP: Clustered Porosity OR: Crater crack P: Porosiy LE: Lack of fusion CL: Cold ap Si: Sig inclusion QIS-NDT Services Co., Ltd. | ACCEPTED BY CLIENT ACCEPTED BY OWNER CERT. AUTHORITY. Nametam Ghanh Lim \Neme 281 SopHepp {Name Signature: Signatur Signature: Date: 4 De, 20s _|Date:_ 9 J01//9 Date:ap CONG TY TNHH DICH VY THU KHONG PHA HUY Q.LS 02L, Hill Two, Binh Gia road, Ward 10, Vung. NON-DESTRUCTIVE TESTING SERVICES CO. ueity, Ba Ria - Vung Tau ‘Tel: +84-254-3857325; Fax: +84-254-3833518; Email:
[email protected]
; Website: hitp:/ais.com.vn MAGNETIC PARTICLE TESTING REPORT Report No.:235/18-M-006 001 Page: tof Procedure No cient Viet Nam GRE Coating Engineering Services ISC QIS-MT-O1/GEN Rev. 1 |Owner: VINCI CONSTRUCTION GRANDS PROJECT (VCGP) Project EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES |Acceptance Criteria: Project No. NA ASME B31.3 - 2016 [Request No.:__VGCE/VINCINDT/002 paragraph 3443.2 them, NA Equipment: Yoke Mag Y6 [MPI method: Material type: Carbon Steel seriaiNo: 0550 Wet Continuous Welding process: _GTAWISMAW current’ AC IMPIInk: — Nabakem SM-15 Surface conditon’ As welded Pole spacing: 75-150 mm Batch No.: _AHJBJGG [Cleaned by: Brusher, Lifting power: [Background contrast: Nabakem MP-35) Date of inspection: 45 KG [Batch No. AHJHJIC. 05 Dec, 2018 Field strength assessment: Burmah Castrol Strip |Location: GPSC/VGCE's workshop No. Joint No. | Welder 1D Sma |eamenl ero | eee’ acorer| eema T_ Drawing No: WH-CCMIOWGIAEG/SF6/000 Shee! 1 of | Rev: 1 SpoolNo:— Detall 6$.30.010/1 A 4 VGCE-004 OD = 273.1 x 9.27 : z “ ACC. 02 Sides 2 2 VGCE-001 OD = 273.1x 9.27 - - - ACC 02 Sides Il Drawing No. WM-CCMIOWGIMEC/SFBI009 Sheet 1 of TRev 1 Spool No, Detail S-30-010/2 1 3 VGCE-001 ol 273.1 x 9.27 = : : ACC 02 Sides 2 4 VGCE-001 OD = 273.1 x 9.27 : 2 z ACC 02 Sides I Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1_ Spool No.:__ Detail CS-30-010/3 1 5 VGCE-001 ol 273.1 x9.27 : : - ACC 02 Sides z 6 NGCE-001 OD = 273.1x 9.27 - = : ACC 02 Sides IV_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1_ Spool No.:_Detail CS-30-010/4 4 T NGCE-002 OD = 273.1 x 9.27 : = 7 ACC 02 Sides 2f 8 vace.ov | op= 2731x927 | _- | - | - | acc | 02 Sites \V_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev. 1_SpoolNo.: Detail CS-30-010/5 1 9 NGCE-002 : - : ACC 02 Sides 2 410 NGCE-002 = x 2 ACC. 02 Sides Vi_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.:1_ Spool No.: Detail CS-30-011 4 44 NGCE-004 OD = 273.1 x 9.27 : - 2 ACC 02 Sides 2 42 NGCE-004_ OD = 273.1 x 9.27 : = > ACC 3[ 13 | voceooa | op= 2731x027 | - | - | - | acc | ea Ses [igends; ACC: Accepted REJ Rejected 16 nemitent adap ©: Crack Ur: Underet LP: Lackof penetration CP. Clisteres Porosiy CR: Crater erack P: Poresy LE: Lack offsion CL: Coldiep Si: Slag inlsion QIS-NDT Services Co., Ltd. | ACCEPTED BY CLIENT ‘ACCEPTED BY OWNER CERT. AUTHORITY Name . _|Name: Name: ISigné kam Thanh Lin some eee |Signature: Date: yy Dory 201P _ |bate: “I9/a///9 Date:aD MAGNETIC PARTICLE TESTING REPORT CONG TY TNHH DICH VY THU KHONG PHA HUY Q.LS Q.LS NON-DESTRUCTIVE TESTING SERVICES CO.,LTD. 2L, Hill Two, Binh Gia road, Ward 10, Vung Tau city, Ba Ria - Vung Tau province, Vietnam ‘Tel: 484-254-3857325; Fax: +84-254-383351 3; Email:
[email protected]
; Webs 3: htp//qis.com.vn Report No.:235/18-M-007 oF-001 Page: tof Procedure No [Client Viet Nam GRE Coating Engineering Services JSC | Owner: VINCI CONSTRUCTION GRANDS PROJECT (VCGP) eee iee Project: EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES Acceptance Criteria: Project No. NA ASME B31.3 - 2016 |Request No. NGCEMVINCINDT/002 paragraph 344.3,.2 item: NA Equipment: Yoke Mag Y6 MMPI method Material type: Carbon Steel Serial No: _ 0550 Wet Continuous Welding process:_GTAW/SMAW |Current. AC MPI ink: Nabakem SM-15, |Surface condition: As welded Pole spacing: 75-150 mm_ Batch No.:__AHJBJGG Cleaned by: Brusher Lifting power: [Background contrast: Nabakem MP-35)Date of inspection: 45KG Batch No, AHJHJIC 06 Deo, 2018 Field strength assessment. Burmah Castrol Strip iLocation: GPSCNVGCE's workshop No. Joint No. |] Welder io “oilman = |_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1_ Spool No.: Detail CS-30-012/1 4 44 VGCE-004 ol 273.1 x 9.27, = = = ACC 02 Sides. 2 16 VGCE-004 OD = 273.1 x 9.27 = : - ACC 02 Sides I Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1_ Spool No.: Detail CS-30-012/2 1 47 NGCE-001 OD = 273.1 x 9.27 - = : ACC 02 Sides 2 18 NGCE-001 OD = 273.1x9.27 : : ACC 3 419 NGCE-001 OD = 273.1 x 9.27 s = : ACC 02 Sides Ill Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1_ Spool No.:_ Detail CS-30-012/3 ¥ 20 NVGCE-001 OD = 273.1 x 9.27, = = : ACC 02 Sides. 2 22 NGCE-001 oD 73.1 x 9.27. = = = ACC 02 Sides IV_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev. 1 Spool No.: Detail CS-30-012/4 4 23 NGCE-002_ : = : ACC 02 Sides 2 24 NGCE-002 = = = ACC 3 25 NVGCE-002 = - o ACC 02 Sides. V_Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1_ Spool No. Detail CS-30-012/5_ 4 26 NGCE-002 OD = 273.1 x 9.27 - - = ACC 02 Sides Zz 27 VGCE-002_ OD = 273.1 x 9.27 = = = ACC 3 28 VGCE-004 OD = 273.1x9.27 - - - ACC 02 Sides |Legends: ‘ACC: Accepted REJ: Rejected IC: Intermittent cold lap : Crack U: Undercut LP: Lack of penetation CP: Clustered Porosity COR: Crator crack P: Porosiy LF: Lack of fusion CL: Cold op Si: Siag inclusion QIS-NDT Services Co,Ltd. | ACCEPTED BY CLIENT | ACCEPTED BY OWNER | CERT. AUTHORITY Nema Chank Lim |Neme: SETH SPHERP |Neme: Signature: Signature: Signature: Date: 1 Pec, 20i¢ Date: 29/19 _|oateaD CONG TY TNHH DICH VY THU KHONG PHA HUY Q.LS QS NON-DESTRUCTIVE TESTING SERVICES CO.,LTD. 02L, Hill Two, Binh Gia road, Ward 10, Vung Taucity, Ba Ria - Vung Tau province, Vietnam ‘Tel: +84-254-3857325; Fax: 484-254-3833518; Email:
[email protected]
; Website: http://gis.com.vn MAGNETIC PARTICLE TESTING REPORT Report No.:236/18-M-008 F-001 Page: tof Procedure No. (iient Viet Nam GRE Coating Engineering Services ISC Owner: VINCI CONSTRUCTION GRANDS PROJECT (VCGP) SE eee a poe EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES [Acceptance Criteria ProjectNo. WA ‘ASME B31.3-2016 [Request No: _VGGE/VINCIINDT/002 paragraph 344.32 tem: NA Equipment: Yoke Mag V6 MPI method: Material ype: Carbon Steel [Serial No: 0560 Wet Continuous lWelding process:_GTAW/SMAW Curent: AC JMPIinks _ Nabakem SM-15 Surface concition: As welded Pole spacing: 75-160 mm Batch No: _AHJJGG. Cleaned by Brusher Liting power [Background contrast: Nabakem MP-36[Date of inspection 45KG Batch No, AHJHJIC 05 Dec, 2018 Field strength assessment Burmah Castrol Stip Location GPSCNVGCE's workshop po] sane | waver | Walaee | Detect Dott [Over Eton] pana |. Drawing No. WM.CCM/DWGIMECISFB/009 Sheet {of 1 Rev.:1_ Spool No.: Detail CS-30-013a/t 1 29 vece.0o4 | op= 2731x927 | - . - | acc [oz sies 2 30 vece-0oa | op= 2731x927 | __- 7 = [ace | oa siaes UI Drawing No: WV-CCMIDWG/MEC/SFB/000 Sheet 1 of (Rev. 1 Spool No. Detail CS-30-013a/2, 4 31 vece.oo | op= 2731x027 | - - =~ [ace | o2sies 2 32 vece.o04 | op= 2731x927 | - = [acc | ozsices Il_Drawing No.: WHM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev 1 Spool No: Detail CS-20-013 1 33 veck.oo | op= 2731x927 | - : = | acc [02 siges 2 34 vece.oot | op= 2731x927 | 3 = [ace | 02 sides IV_Drawing No.: WM-CCMIDWG/IMEC/SFBI009 Sheet 1 of 1 Rev: 1 Spool No.. Detail CS.30-073 1 35 vece.oot | op= 2731x027 | - 3 ~ | acc | ozsides 2 36 vece.oot | op= 2731x927 | - e = [ace | c2 sizes \V_ Drawing No.: WM.CCMIDWGI/MECISFB/009 Sheet 1 of 1 Rev.:1_SpoolNo. Detail CS-30-014/ 1 37 vece.oot | o= 2731x927] - E ~ [acc | o2sides 2 38 veceoo1_| op= 2731x927 |_- E =| ace | 02 sides 3 39 vece0o1_| op= 2731x027 |_- z = | _ace i) vace-oo2 | oD= 2731x927 | : =| acc | o2Sides Sel: Legends: ACC: Accepted REL: Rejected TG: Intornient cold lap : Crack U: Undercut LP: Lack of penetration CP: Chstered Porosity (OR: Crater erack P: Porosity LF: Lack of fusion CL: Cold op Si: Slag incuslon ‘IS-NDT Services Co., Ltd.] ACCEPTED BY CLIENT | ACCEPTED BY OWNER | CERT. AUTHORITY Nan6oin Clenh Lim Name: 2.574 Sopp p \Wame Signature: Doe Signatur: Signature: Date: Wyre, 2017 |Date. 29 /0///9 Date:GD CONG TY TNHH DICH VY THU KHONG PHA HUY Q.LS Q.LS NON-DESTRUCTIVE TESTING SERVICES CO., LTD. ©2L, Hill Two, Binh Gia road, Ward 10, Vung Taucty, Ba Ria - Vung Tau province, 3857325; Fax: +84-254-3833518; Email:
[email protected]
; Website: htp:/qis.com.vn Tel: 484- MAGNETIC PARTICLE TESTING REPORT Report No.:235/18-M-009 oF.001 Page: tof Procedure No [Cient Viet Nam GRE Coating Engineering Services SC lowner: VINCI CONSTRUCTION GRANDS PROJECT (VOGP) ee ueener cs _[proed EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES lAcceptance Criteria Projest No NIA ASME 8313-2016 [Request No: VGCENVINCINDT/002 paragraph 3443.2 [item NA Equipment Yoke Mag Y6 MPI method! Material ype: Carbon Steol JSerialNo: 0550 Wet Continuous Welding process: GTAW/SMAW. current: AC IMPIink Nabakem SM-15 [Surface condition: As welded Pole spacing: 75-150 mm Batch No. _AHJBJGG Cleanedby: __Brusher Litting power Background contrast: Nabakem MP-36)Date of inspection 45KG Batch No AHJHJIC. 07 Dee, 2018 Field strength assessment Burmah Castrol Stip [Location GPSCHIGCE's workshop INo.} Joint No. | Welder io Meee iesenen | ea | wee mecca [Rear |_ Drawing No.: WM.CCMIDWGIMECISFBI009 Sheet 1 of 1 Rev.:1_ Spool No.: Detail CS-30-014/2 1 41 vece-o02 | op= 2731x927 | - - | ace | 02 sides 2 2 vece.ovz | op= 2731x927 |_- : =| ace | 02 sices 3 43 vece.002 | op= 2731x027 | 5 [ace 4 44 vece.oo2 | op= 2731x927 |_- 5 = [acc | oz sides UI_ Drawing No: WM-CCM/DWGIMEC/SFB/009 Sheet 1 of 1 Rev.: 1 Spool No. Detail 08-20-0140 4 45 vece.oo2 | op= 2731x927 [_- : - [ acc | o2siaes 2 46 vece-oo4 | op= 2731x927 |_- ; = [ace | oz sides: 3 47 vece.oor | op= 2731x027 | - : = [ace 4 48 veceoos | op= 2731x927 |_- : = | ace | o2sides Iil_Drawing No.: WM-CCM/DWG/MECISFBIO09 Sheet 1 of 1 Rev 1 Spool No: Detail CS-30-016 1 49 vece-oo4 | op= 2731x927 [_- : - | acc [ o2sides 2 50 VGCE-004 5 2 = _|ace | 02 sides 3 5H VGCE-004 E : = [ace 4 53 veceoot_| op= 2731x927 |_- 7 = [ace | o2sides asa — ‘gends; ACC: Accepted REX: Rejected TG: Inleritent cold tap C: Crack U: Undercut LP: Lack of penetration CP: Clustered Porosity COR: Crater crack P: Porosity LF: Lack of fusion CL: Cold ap Sk Slag ingusion QIS-NDT Services Co.,Ltd. ACCEPTED BY CLIENT | ACCEPTED BY OWNER | CERT. AUTHORITY IMT Technician: P.T. SON |Namey 1. Name: 2FTH Name signalhe on Chan Lira ee REeAnE Signature: Date: 44 foe, 20lf Date: 29 /0/)/9 _ | Date:ap Tel: +8 MAGNETIC PARTICLE TESTING REPORT CONG TY TNHH DICH VY THU KHONG PHA HUY Q.LS Q.LS NON-DESTRUCTIVE TESTING SERVICES CO., LTD. 02L, Hill Two, Binh Gia road, Ward 10, Vung Taucity, Ba Ria - Vung Tau province, -254-3857325; Fan: 484-254-3833518; Email:
[email protected]
; Website: hitp:/is.com.vn jetnam Report No. 235/18-M-010 ‘oF.001 Page: tof Procedure No. [Gient Viet Nam GRE Coating Engineering Services 1SC GuS-sAT-OUGEN Rav. 4 [OME VINGI CONSTRUCTION GRANDS PROJECT (VOGP, Project EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES lAccepiance Criteria ProjectNo N/A ‘ASME B31.3-2016 |Request No. VGCENVINGINDT/002 paragraph 344.32 item NA Equipment: Yoke Mag Y6 MPI method: Material type: Carbon Steel Serial No: 0560 Wet Continuous Welding process:_GTAWISMAW Curent. AC IMPIink: _ Nabakem SM-15 [Surface condition: As welled Pole spacing: 75-160 mm Batch No: AHJBJGG Cleaned by: __Brusher Liting power [Background contrast: Nabakem MP-35|Date of inspection 45KG Batch No. AHJHIC 06 Dec, 2018 Field stength assessment__Burmah Castrol Stip [Location GPSGNGGE's workshop No,| Joint No. | Welder 1D yl (tia eS |__ Drawing No: WM-CCM/DWGIMECISFB/009 Sheet 1 of { Rev. 1 Spool No.: Detail 0S-30-016, Hi 54 vece-oo1 | ob= 2731x027 | - - - [acc [02 Sides 2 55 vece-0o1 | op= 2731x927 | =| ace’ 3 56 veoe.oot | op= 2731x027 | 7 - [acc [02 sides II Drawing No. WM-CCM/OWGIMECISFE/009 Sheet 1 of 1 Rev. 1 SpoolNo.: Detail CS-30.017 4 57 VGCE-002 27aixe27 | - : ~ | acc [0 siées 2 58 VGCE-002 = 2731x027 | = ~_|_acc 3 58 VGCE-002 2731x927 | 5 =| acc 4 60 vece.oo2 | op= 2731x927 | 5 = [acc | 02 Sides Ill_ Drawing No: WMLCCM/DWG/MECISFB/009 Sheet 1 of 1 Rev: 1 Spool No: Detail CS-30.078 4 a vece.02 | op= 2731x927 | - - ~ [acc [02 sites 2 62 vece-02 | op= 2731x927 | : =| acc 3 63 vece-oo4 | op= 2731x927 | - =| ace’ 4 64 vece.oos | op= 2731x027 | 5 = [ace | or sizes Ill Drawing No: WNM-CCM/DWGIMEGISFB/009 Sheet 1 of 1 Rev. 1 SpoolNo. Detail CS-30.020 1 65 vece.oo4 | op= 2731x927 | - - ~ | acc [0 sides 2] 67 vece-ooa | op= 2731x927 | =| acc | 02 sides 3[ 65 vece-0o4 | OD= 2731x927 | a =| acc: 4 69 vece-oot | op= 2731x927 | : [acc | o2 ses legends: AGC Aczepted RES: Rejected 1G: Intermitent cold ip C: Crack U: Undercut LP: Lack of penetration CP: Clustered Porosity CR: Grater crack P: Porosity LF: Lack af fusion GL: Cold lap Si: Slag inclusion GIS-NDT Services Go, Ltd.] ACCEPTED BY CLIENT | ACCEPTED BY OWNER | CERT. AUTHORITY MT Technician: P.T.SON NOME aan Ghamh Lin|Name SETH SOPHERP |Neme: Signature: Signature Signature Date: Jy for, 204 Date: “29/0// 14 [DateCONG TY TNHH DICH VU THU KHONG PHA HUY Q.LS NON-DESTRUCTIVE TESTING SERVICES CO., LTD, Q. ‘Tel: +84-254-3857325; Fax: +84-254-3833518; Email:
[email protected]
; Website: http:/gis.com.vn MAGNETIC PARTICLE TESTING REPORT Report No. 235/18-M-011 QF-001 Page: 1of1 Procedure No. |Client: Viet Nam GRE Coating Engineering Services JSC iad iia abet ame VINCI CONSTRUCTION GRANDS PROJECT (VOGP) Project EXTENSION CHAMCAR MON WATER PRODUCTION FACILITIES |Acceptance Criteria: Project No.:__N/A ASME B31.3 - 2016 |Request No. VGCE/VINCINDT/002_ paragraph 34432 Item NAL Equipment: Yoke Mag Y6 MPI method: Material type: Carbon Steel Serial No 0550 Wet Continuous Wielding process:_GTAWISMAW current. AC JMPVinkc —Nabakem SM-15 [Surface condition’ As welded Pole spacing: 75-150 mm. Batch No.:__AHJBJGG Cleaned by: Brusher Liting power: Background contrast; Nabekem MP-a@)Date of inspection 45 KG Batch No.: AHJHJIC 07 Dec, 2018 [Field strength assessment: Burmah Castrol Strip Location: GPSCNVGCE's workshop No] Joint, | Welder iD Say iliac | ares | aeceen Remar |_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 4 of 1 Rev.: 1 Spool No.:__Detail CS-30-021 4 70 VGCE-001 OD = 273.1 x 9.27 = = a. ACC 02 Sides 2 71 VGCE-001 ol 273.1x9.27 = : = ACC 02 Sides Il_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.:1_ Spool No.: Detail CS-30-022 4 72 VGCE-001 273.1 x 9.27 2 a = ACC 02 Sides 2 73 VGCE-001 273.1 x9.27 = 2 : ACC 3 4 VGCE-002 273.1 x9.27 - - - ACC 02 Sides Il_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1_ Spool No. Detail CS-30-023/1 7 75 VGCE-002 OD = 273.1x9.27 : : : ACC 02 Sides 2 76 VGCE-002 Ol 273.1 x 9.27 = = = ACC 02 Sides 3 77 VGCE-002 OD = 273.1x9.27 = : = ACC 4 78 VGCE-002 ot 273.1 x 9.27, : : : ACC 5 79 VGCE-004 ol 273.1x9.27 : - - ACC 02 Sides IV_ Drawing No.: WM-CCM/DWG/MEC/SFB/009 Sheet 1 of 1 Rev.: 1. Spool No.:__Detail CS-30-023/2 4 80 VGCE-004 fe) 273.1 x 9.27 = x = ACC 02 Sides 2 at NGCE-004 OD = 273.1 x 9.27 : : = ACC 3 82 NGCE-004_ ol 273.4 x9.27 : : - ACC 4 83 vGceE-002_| oD = 2731x927 : : : ACC 5 84 VGCE-002 ol 273.1 x 9.27 = = : ACC 02 Sides [Legends ACC: Accepted REL: Rejeced 1G: Intermitent cold ep : Crack U: Underet LP: Lack of penetration CP: Chstered Porosity CR: Crater erack P: Porosity LF Lack of fusion CL: Cold ip Si: Slag ncluson QIS-NDT Services Co., Ltd. | ACCEPTED BY CLIENT ACCEPTED BY OWNER CERT. AUTHORITY NamerPomn Thanh Liin\Name: FTA SOPUER ? |Name: Signature: Signature: |Signature: Date Af Pocy 207 Date: “25 TUES Date:
You might also like
Sample Magnetic Particle Inspection Report
PDF
100% (3)
Sample Magnetic Particle Inspection Report
3 pages
QCF304 Magnetic Particle Testing Report
PDF
100% (2)
QCF304 Magnetic Particle Testing Report
2 pages
MT Procedure
PDF
100% (1)
MT Procedure
13 pages
NDT Report Test
PDF
No ratings yet
NDT Report Test
10 pages
BC MT 1688-0000
PDF
No ratings yet
BC MT 1688-0000
84 pages
FINAL REPORT CẨU GOTTWARD & LIBIEHERR 11.2022
PDF
No ratings yet
FINAL REPORT CẨU GOTTWARD & LIBIEHERR 11.2022
30 pages
Mpi Report Format
PDF
100% (1)
Mpi Report Format
2 pages
Tndt-frm-ndt-007 Magnetic Particle Inspection Report
PDF
100% (1)
Tndt-frm-ndt-007 Magnetic Particle Inspection Report
2 pages
A Nozzle NCR Documents
PDF
No ratings yet
A Nozzle NCR Documents
15 pages
Testing Report
PDF
No ratings yet
Testing Report
17 pages
Contractor: Project Name: No. Item Item No. DWG No. Defect THK Joint No. Welding Process Result Remark Acc. Rej. Rep
PDF
No ratings yet
Contractor: Project Name: No. Item Item No. DWG No. Defect THK Joint No. Welding Process Result Remark Acc. Rej. Rep
1 page
Magnetic Examination Report: Sketch
PDF
No ratings yet
Magnetic Examination Report: Sketch
69 pages
4M Pole & Foundation Design Comments 12may15
PDF
100% (2)
4M Pole & Foundation Design Comments 12may15
16 pages
MPI WELDING by PTG WELDERS
PDF
No ratings yet
MPI WELDING by PTG WELDERS
5 pages
21072023-NCR Closed Report
PDF
No ratings yet
21072023-NCR Closed Report
8 pages
Magnetic Particle Testing Repor
PDF
No ratings yet
Magnetic Particle Testing Repor
2 pages
WO1831 - Arabtec 09.02.2020.
PDF
No ratings yet
WO1831 - Arabtec 09.02.2020.
1 page
Wps Asme Ix Fcaw..
PDF
No ratings yet
Wps Asme Ix Fcaw..
6 pages
Kolocreek PG 1
PDF
No ratings yet
Kolocreek PG 1
2 pages
NDT - MT - PARLYM - DFW - Request 001 (18-09-2024)
PDF
No ratings yet
NDT - MT - PARLYM - DFW - Request 001 (18-09-2024)
5 pages
Liquid Penetrant Testing Report: See Next Page
PDF
No ratings yet
Liquid Penetrant Testing Report: See Next Page
2 pages
Magnetic Particle Test Procedure F1 A
PDF
No ratings yet
Magnetic Particle Test Procedure F1 A
11 pages
Liquid Penetrant Testing Report: SKETCH: See Next Page
PDF
No ratings yet
Liquid Penetrant Testing Report: SKETCH: See Next Page
2 pages
WPS - SMW - 12
PDF
No ratings yet
WPS - SMW - 12
9 pages
WQR-FW-NGUYEN MINH HIEU
PDF
No ratings yet
WQR-FW-NGUYEN MINH HIEU
1 page
NDT - MT - PARLYM - Request 008 Du 11-10-2024
PDF
No ratings yet
NDT - MT - PARLYM - Request 008 Du 11-10-2024
4 pages
KNT-KTN-329.22-VAM-P21-009_B_Piping Fabrication and Welding Control Procedure
PDF
No ratings yet
KNT-KTN-329.22-VAM-P21-009_B_Piping Fabrication and Welding Control Procedure
41 pages
API5LX 65 Welding Summary
PDF
No ratings yet
API5LX 65 Welding Summary
25 pages
SR-FT-MPI-001
PDF
No ratings yet
SR-FT-MPI-001
4 pages
Approved 316-L WPS
PDF
100% (1)
Approved 316-L WPS
12 pages
EWS-7137& 7138
PDF
No ratings yet
EWS-7137& 7138
14 pages
01.dos-0001 Welding Dossier
PDF
No ratings yet
01.dos-0001 Welding Dossier
35 pages
WPS PQR-08
PDF
No ratings yet
WPS PQR-08
8 pages
MT 23 Mops 059
PDF
No ratings yet
MT 23 Mops 059
1 page
WPS PQR-07
PDF
No ratings yet
WPS PQR-07
8 pages
Magnetic Particle Inspection Report
PDF
No ratings yet
Magnetic Particle Inspection Report
1 page
Weld Design Weld-Design
PDF
No ratings yet
Weld Design Weld-Design
2 pages
Testing Report
PDF
100% (1)
Testing Report
20 pages
56STLZ 1
PDF
No ratings yet
56STLZ 1
223 pages
Caustic Qc
PDF
No ratings yet
Caustic Qc
6 pages
0014
PDF
No ratings yet
0014
44 pages
Proc Sop
PDF
100% (1)
Proc Sop
90 pages
TF1 - 2Q92 - 100008 - A - Shop Magnetic Particle Testing Procedure
PDF
No ratings yet
TF1 - 2Q92 - 100008 - A - Shop Magnetic Particle Testing Procedure
22 pages
Inspection Report Magnetic Particle Examination (Tupi STR)
PDF
100% (1)
Inspection Report Magnetic Particle Examination (Tupi STR)
1 page
MPI-2432-PB1-B-014
PDF
No ratings yet
MPI-2432-PB1-B-014
2 pages
71300-Kadris-Ndt Report-10.03.2023
PDF
No ratings yet
71300-Kadris-Ndt Report-10.03.2023
4 pages
52420400 MPI - DH1
PDF
No ratings yet
52420400 MPI - DH1
18 pages
Ilovepdf Merged (13) Organized (1)
PDF
No ratings yet
Ilovepdf Merged (13) Organized (1)
4 pages
MPI-2432-PB1-B-012
PDF
No ratings yet
MPI-2432-PB1-B-012
2 pages
RFI-128-1(SKT NDT)
PDF
No ratings yet
RFI-128-1(SKT NDT)
7 pages
Ircon Signboard
PDF
No ratings yet
Ircon Signboard
10 pages
Inspection Test Plan For Piping Shop Fabrication
PDF
No ratings yet
Inspection Test Plan For Piping Shop Fabrication
3 pages
NDT&PWHT
PDF
No ratings yet
NDT&PWHT
7 pages
MPI-2432-PB1-B-011
PDF
No ratings yet
MPI-2432-PB1-B-011
2 pages
Method Statement of Pile Load Test PDF
PDF
No ratings yet
Method Statement of Pile Load Test PDF
53 pages
Detail - 3 Section - L: Infineum JSGP Alliance (Ija) Projects Infineum Singapore LLP
PDF
No ratings yet
Detail - 3 Section - L: Infineum JSGP Alliance (Ija) Projects Infineum Singapore LLP
1 page
0309
PDF
No ratings yet
0309
28 pages
MPI-2432-PB1-B-015
PDF
No ratings yet
MPI-2432-PB1-B-015
2 pages
WPS PQR-09
PDF
No ratings yet
WPS PQR-09
11 pages